DEPARTMENT(PHED) GOVERNMENT OF
KHYBER PAKHTUNKHWA
1. LOCATION MAP
2. SALIENT FEATURES
3. POPULATION
4. EXISTING DRINKING WATER SUPPLY SYSTEM
5. ERS TESTS LOCATION AND RESULTS
6. SOURCE DEVELOPMENT OPTIONS
7. PROPOSED WATER SUPPLY SYSTEM BASED ON RIVER KABUL
8. PROPOSED WATER SUPPLY SYSTEM BASED ON PEER KALLAY WITH TUBE WELLS
9. PROJECT ZONES
10. BOOSTING STATIONS AT DISTRIBUTION SYSTEM
11. PMU OFFICE & RESIDENCE
12. ROUGH COST ESTIMATE
LOCATION MAP
Northern
Areas
Afghanistan
Kashmir
Punjab
Balochistan
Salient Features
Project area surveyed 83,000 Acres
Present population (2020) 57,824 Persons
Projected population (2040) 92,920 persons
Water demand 1,393,799 Gallons
Per capita demand 15 gallons/capita/day
Design period 20 years
Type of pipe for rising main MS Pipe/HDPE PN 20
Type of pipe for distribution Polyethylene (HDPE)/GI
Tube wells 18
Number of IPS in rising main 16” dia of pipe 4
Number of boosting stations in distribution 3
Delivery Source House Connection
Description PIPE LENGTHS TOTAL
Dia.(inches) 16” 10” 8” 6” 4” 3” 2”
RISING MAIN(ft) 1,34,451 1,34,451
No. of Persons/house 7
Springs
There are three springs:
1) Spingy Tangay in Baizai,
2) Kung in Khewaizai
3) Janubi Darra in Baizai
Tube well
Khawar
EXISTING DRINKING WATER SUPPLY SYSTEM
Kung in Baizai
Janubi Darra Link drain spring
EXISTING DRINKING WATER SUPPLY SYSTEM
Social Social
Mobilizer(Male) Mobilizer(Female)
SUPERVISO SUPERVISO
R R
CLERKS,COPMUTER OPERATOR,DRIVERS,OFFICE
BOY CHOWKIDAR
PMIU unit will be housed in the premises of land to be purchased for SDO/XEN office or
separately to be arranged
PMU OFFICE LAYOUT
ROUGH COST ESTIMATE
Sr.No Cost
SUB HEADS
. (Rs In Million)
1 Tube wells & Chambers 18 No. 113.367
2 Pumping Machinery (Source+ Pumping stations) 307.205
3 400,000 Gallons Water Tank (06 No) 260.389
4 Rising Main 16” Dia 1457.609
5 Distribution System 1522.593
6 Staff Quarters (13 No) 35.050
7 Boundary wall for Water Works 40.711
8 Pumping chamber (08 No) 30.712
9 200,000 Gallons Water Tank (01 No) 20.593
10 100,000 Gallons Water Tank (06 No) 51.882
11 Project Management Unit 36.085
12 Project Management Unit Salaries & Direct Cost 124.174
13 Approach Road (L=5500’) 74.086
14 Generators 55.755
15 Land Acquisition 991 Kanal 966.300
16 WAPDA Transmission Line 150.000
17 Price Escalation 50.000
18 Supervision Charges (1%+2%) 158.895