You are on page 1of 8

December 29, 2021

To: Mr. Edgardo Lorenzana


STBF Citrus Farm
Parañaque City

SUBJECT: QUOTATION FOR THE DESIGN, SUPPLY AND INSTALLATION OF


WASTEWATER TREATMENT FACILITY (WWTP)
___________________________________________________________________________________

Dear Sir,

Aqua Add On Systems Inc., is pleased to submit herewith our quotation on the above
captioned subject for your evaluation. The design is based on your submitted wastewater characteristics
(laboratory results) and daily flow rate. Please refer to the attached scope of services and bill of
quantities for your perusal.

The wastewater treatment plant will primarily employ Advanced Oxidation Process (AOP), an
innovative emerging technology. The strong oxidizing power of hydroxyl radicals are utilized in the
oxidation of organic compounds to mostly carbon dioxide and water. Ozone/hydrogen peroxide is
chosen as the method of producing hydroxyl radicals.

Wastewater from the manufacturing process will be collected from the Equalization Tank. This
tank should be freely flowing by gravity to the tank for collection. Since the manufacturing site is yet to
be determined, this tank’s construction is left for the client to provide.

Ph adjustment is carried out in the Equalization Tank with sodium hydroxide (NaOH) addition.
Neutralization reaction will take place and will raise the pH level close to neutral pH. From the
laboratory results, current wastewater pH is at 3.98.

Page 1 of 8
From the Equalization Tank, water is transferred by a pump to the Coagulation Tank. Coagulant
is dosed via a dosing system. The purpose of the coagulant is to form flocs with the colloidal particles
and suspended solids for easier separation from the wastewater stream.

Supernatant liquid will overflow from the Coagulant Tank to the Settling Tank before being
pumped to the Sand Filtration System for the entrainment of remaining suspended solids. On the other
hand, sludge from the Coagulation Tank and Settling tank will be pumped to the Filter Press for the
concentration of sludge. Compacted solid sludge from the unit will be collected and disposed properly
by a DENR accredited hauler/treater.

Thank you very much for the opportunity to quote on your requirements and looking forward for
your earliest favorable consideration.

I. PROPOSAL

DESIGN CRITERIA
BASIS
Flowrate, Q: 10 CMD

WASTEWATER CHARACTERISTICS
Effluent Characteristics (Provided By the Client)

Parameters Unit Value DENR Limits


Biochemical Oxygen Demand (BOD) mg/L 2.978 < 50
Chemical Oxygen Demand (COD) mg/L 8.257 < 100
pH - 3.98 6.5-9.0
Total Suspended Solids (TSS) mg/L 828 < 70

Page 2 of 8
SCOPE OF WORKS:

ACTIVITY 1: Equalization Tank


1. Supply and installation of (2) units of transfer pumps
2. Piping
3. Electrical wiring
4. Installation of air supply line (from air compressor) for mixing of tank

ACTIVITY 2: Sodium Hydroxide Dosing System


1. Installation of dosing system
2. Piping works
3. Electrical wiring

ACTIVITY 3: Coagulant Dosing System


1. Installation of dosing system
2. Supply and conversion of one (1) unit of IBC Tank to Coagulation Tank
3. Piping works
4. Electrical wiring

ACTIVITY 4: Sand Filtration System


1. Supply and installation of one (1) unit of sand filter
2. Supply and installation of two (2) units of booster pumps
3. Piping works
4. Electrical wiring

ACTIVITY 5: Filter Press Unit

Page 3 of 8
1. Supply and installation of one (1) unit of Filter Press
2. Supply and installation of one (1) unit of diaphragm transfer pump.
3. Supply and installation of Piston Type Compressor Unit and accessories
4. Piping works
5. Electrical wiring

ACTIVITY 5: Settling Tank


1. Supply and fabrication of one (1) unit of IBC Tank to Settling Tank
2. Piping works

ACTIVITY 5: Control Panel


1. Electrical wiring and termination

ACTIVITY 4: Testing and Commisioning


1. Testing and commisioning

II. WARRANTY

1. Warranty for the filtration system, filter press unit, dosing systems and pumps are 12
months.

III. FINANCIAL ASPECT

A. PROJECT COST

The total project cost is Php1,600,000.00 inclusive of tax.

Page 4 of 8
Should this amount be considerable to you, the terms of payment are as follows:

1. 50% Down payment


2. 40% Progress Billing
3. 10% Retention

B. LEAD TIME AND WORK DURATION

Possible lead time for the project is around 30-60 days and the work duration is expected to be
between 7-20 days.

C. INCLUSIONS AND EXCLUSIONS

Inclusion:
 Transportation cost of laborers during installation and commissioning
 Laboratory Test of wastewater effluent prior for discharge permit until it passed the
standard of DENR/LLDA.
 Engineering’s Report, Wastewater Plans (Process Flow& Equipment Lay-Out) needed
for Application of Discharge Permit.
 Provision of Pipes and Fittings from Influent to Effluent Pipe only

Exclusion:
 Potable water line for backwashing of filtration system
 Accommodation of laborers during installation
 Drainage Plan, Site Development Plan, Elevation Plan and Plant Lay Out of the
establishment needed for Discharge Permit.
 Provision of Pipes and Fittings from Effluent pipe to drainage beyond 20 meters from the
wastewater treatment facility
 Provision of Source Lines/Electrical Lines
 Siphoning
 Collection/Equalization Tank from the manufacturing process

Page 5 of 8
ATTACHMENT:
ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL
I GENERAL REQUIREMENTS
Mobilization and
Demobilization
  1 lot 30,000.00 30,000.00
(Including meals and
transportation of laborers)
        SUB TOTAL  30,000.00
II. DISCHARGE PERMIT
Application of Discharge
  Permit, Process Design and 1 lot 150,000.00 150,000.00
shop drawings/ as built plans
        SUB TOTAL  150,000.00
III. MECHANICAL & SANITARY WORKS
Filter Press Unit

Capacity:
Brand: 1 unit/s 600,000.00 600,000.00
Origin:
Power: 230/380/480V

Piston Type Air Compressor


With Piping/Valves

Capacity:
1 lot 50,000.00 50,000.00
Brand:
Origin:
Power: 3 HP, 230/380/480V

Submersible Transfer Pump


Type: NON CLOG
SUBMERSIBLE
Brand:
2 unit/s 35,000.00 70,000.00
Origin:
Capacity:
Head:
Power: 1.5 KW, 3P, 230,440
Diaphragm Pump

Capacity: 1-3 m3/hour


1 unit/s 30,000.00 30,000.00
Brand:
Origin:
Power: 230/380/480V
Coagulant Dosing System 1 set 80,000.00 80,000.00

Type: FEED PUMP


Brand: Seko
Capacity: 9-15 liters/hour
Power: 600w

Page 6 of 8
200LITERS
S/S MIXER
NaOH Dosing System

Type: FEED PUMP


Brand: Seko
1 set 80,000.00 80,000.00
Capacity: 9-15 liters/hour
Power: 600w
200LITERS
S/S MIXER
Compressed Air Receiving
Tank With Air Pressure
Regulator and Air/Water
Separator
1 lot 120,000.00 120,000.00
Tank Volume: 0.2-0.5 m3
Material: GI
Origin:
Origin:
Booster Pump

Brand:
2 unit/s 10,000.00 20,000.00
Origin:
Power: 1 HP, 1P,
230/380/480V
Sand Filtration System

Model: 1665 FRP tank


Dimension: 400 mm D
1 unit/s 50,000.00 50,000.00
x 1625 mm H

(With Sand Media Included)

Pipes and Fittings


UPVC PIPES SCHED 40,
1"-3” DIAMETER for Water
  1 lot 140,000.00 140,000.00
GI PIPES SCHED 40, ¼” and
Pneumatic Hoses, 10-12 mm
DIAMETER for Air

IBC Tote Tank

Capacity: 260 gallons


2 unit/s 10,000.00 20,000.00
Material: Plastic

        SUB TOTAL 1,260,000.00


IV ELECTRICAL WORKS
Control Panel 1.00 lot 50,000.00 50,000.00

Page 7 of 8
  Wirings & Conduit 1.00 lot 100,000.00 100,000.00
        SUB TOTAL 150,000.00
V TRAINING AND COMMISIONING
1.00 lot 10,000.00 10,000.00
SUB TOTAL 10,000.00
        TOTAL PRICE (VAT INC) Php1,660,000.00

Thank you very much and best regards.

Very truly yours,

_________________________
Krisuelle Escanela
Sales and Marketing Officer

APPROVED BY:

_________________________
Gregorio Villacorta
General Manager

Page 8 of 8