Project : Abid Residence ,Cumilla
Supply of PVC & uPVC "E" Class pipe and Imported pipe 1 job L/s 45,000.00
fittings of threaded / Socket type such as Socket, Elbow, Tee,
Union, Ball Valve, Reducer, Off-Set, etc. Requird for pump,
under water lighting system, & other equipment from installed
at macine room including supply of PVC conduit all complete
as per drawing, design & instruction of Supply as per Model /
Approval / Accepted by the Engineer
Electrical Components [approx.]
Supply of Control Panel with Electrical Cable required for pump, 1 job L/s 30,000.00
under water lighting system, & other equipment from SDB
installed at plant room including supply of conduit all complete
as per drawing, design & instruction of Supply as per Model /
Approval / Accepted by the Engineer
INSTALLATION & OPERATION
Filtration Unit Installation & Commission
Supervision & Execution, Electrical & Plumbing work L/s 60,000.00
with Testing & Commission of Swimming Pool
Sub Total = 396,025.00
5 supervation charge will be 13% of total cost 50,073.00
Grand Total= 446,098.00
Not Included:
Walk and Deck Area
Balance Tank
Wash Area
Filter Room
Pool Area
Note:
Supply of tiles are excluded with quoted price
Warranty dose not claim due to defects arising from water quality, electricity supply deficiencies, misshandling or lack of maintenance
This filtration unit will only works for water cleaning & make suitable for Swimming. This can not be use as iron / Hard
Particles removingtest
Water laboratory & must
dechemicalising systemfrom BUET or Equivalent institute before finalized the Swimming Pool filtration system.
be done properly
Schedule of Works
Min. 90 days required to complete the work, import the equipment and supply at site with Plumbing & electrical work
Min. 20 days required for commissioning
Min. 10 days required for trial basis operation
Mode of Payment:
50% advanced would be provided with the working order / approval to import the material.
20% after completion of electric work & plumbing work.
15% after materials at Chittagong Port
15% after handover the project
Cash / cheque would be provided by you in favor
Responsibilities
Free Train-up your one people about filtration system during the installation time
Necessary chemicals & spares parts are available in local stock.
Monthly Maintenance / Supervision with negotiable cost.
To be provided by You
Water supply and drain out connections in filter room
Necessary Electricity connection to our Control panel.
Proper Storage of materials at site after supply & during installation Time
Yours sincerely,