CE 404:CAPSTONE PROJECT
o GROUP:03
o 1704003
o 1704006
o 1704007
o 1704011
o 1704030
o 1704031
o 1604011
Pool Details:
Pool Type: Gunite Pool:It is one of the oldest and popular pool building method in the world. It’s a
stable concrete structure typical build to last for a longer time. The average cost of building such a
pool system is Tk 2000 per square feet of the floor area.
Total Cost:27000000
Category: An Olympic-size swimming pool is usually built to international standards of pool sizes.
These pools are usually 50mts long, also referred to as “Long course” pools.These are not so popular
for residential applications, but used in Public sports complexes and stadiums.
Accessories:
This system helps to keep your pool clean. The water pump sucks water from the pool and push it
through the filter and then returns the clean water through the jet. The skimmer consists of the
plastic box which ensures that debris floating in the pool does not enter the pump.
Pool Features & Accessories you can have for your pool
Fountains – 50,000 – 2,50,000 =150000
Chlorination: =140700
Total Estimation:
Construction=2,70,00,000
Accessrories: =99,35,000
Heating System:5,00,000
Total Area:23130x3=69392 sq ft
Total:13,50,00,000
Buiding 02:
Total Size:5380 sq ft
Total:5380000
Gallery:
Cost:1000 sq ft
Total:1,74,80,000
Gym Facilities And equipment:
Treadmill =65000x4
Bi Cycle =15000x4
Bench= 10x20000
Cage Machine:=250000x2
Dumble Set:=800x25
Barbell Set:80000x2
Pull Up Frame:1600x4
Rowing Machine:13000x4
Weight Measurement:5000x2
Other:200000
TOTAL:1534000
Game Facilities:
Table Tennnis: 3x40000
Chess: 2000x4
Badmintion:75000 ( 4 bat,net,feather,lighting)
Basket Ball:75000
Others:100000
Total:378000 tk
TOTAL PROJECT COST:
Pool:3,85,85,700
Gym:1534000
Building:140380000
Gallery:17480000
Games:378000
Parking: 1000000