Ground Engineering:

The elevation of our location is 15.27 m. The whole area is a plain land. So, there will be no issue with
cutting and filling. And also, there is no obstacle in this area.
Geological and Geotechnical Information:
(Source: Geotechnical Characterization of Dhaka Metropolitan area-By Abul Bashar)

Number Of Borehole: B1
Technical Design:
The location has public road 3 of its side. And the other side it has couple of building. So,there is no
issue with its foundation design as we have enough space around it. And also there will be no privacy
issue while using the pool.

Design:01

This proposed design is ok with foundation and space allocation. But, as we have a dormitory building
inside our location, there is problem with the privacy while using the pool.
Design:02

This is our final selection. This design has_

1. Best utlization of space


2. No issue with foundation design accoriding to BNBC2020 Code
3. No privacy issue using the pool
4. Proper arrange mate of pool,gym ,main gate

Our project constitutes of four major components:


 Multipurpose Indoor Complex (with Gymnasium)
 Swimming Pool with water treatment and filtration (Standard Olympic Size
25x50 m^2)
 Gallery
 Parking Facility
The engineering technologies that can be adopted related to project are:
Name of Component Required Technological Knowledge

Multipurpose Indoor Complex i) Concrete Structure


ii) Composite Structure
Swimming Pool Complex Concrete Structure (ISPSC Code)

Gallery Concrete Structure

Parking Facility Concrete Flooring

Designing method of various components are conducted based on the provisions of BNBC
2020, Chapter 2, Volume 2.
For pool Design: ISPSC -2018 (Chapter 2,3,4,5,6)
For Safety Protocol: ANSI/APSP/ICC-7-2-2013
Regarding the Indoor Complex, we’ve selected the following provisions:
Occupancy Category: II
Importance Factor: 1
Seismic Zone: 2 (Moderate Risk, Z=0.20)
From SPT Value of Bore Hole 1 (Lalbag (SPT-10-27) (Site Class: SD)
For Occupancy Category II, Seismic Zone 2, Site Class SD, seismic category of building is D
Possible structural system based on the aforementioned provision are shown below:
Seismic Force-Resisting System Height Limit
MOMENT RESISTING FRAME (No Shear Wall)
a) Special steel moment frames a) No Limit
b) Intermediate steel moment frames b) 35m
c) Special reinforced concrete moment frames c) No Limit

DUAL SYSTEMS: INTERMEDIATE MOMENT FRAMES CAPABLE


OF RESISTING AT LEAST 25% OF PRESCRIBED SEISMIC FORCES
(With bracing or shear wall) a) 50m

a) Special reinforced concrete shear walls


Key Output

Swimming Pool:
25m x50m
Water Recirculation and treatment System

Building Dimension

Plot area 12000 [ft²]


3 Storied Building
Building height 45 [ft]
Floor-to-floor height 15 [ft]
Total growth area 36000 [sq ft]

Gallery

Height:20 ft
Row:10
Capacity: 500

Output Plan

Expected Utilization Rate:


7 Shift in day (Weekly 6 days)
Around 40-60 People in a shift
Gymnasium and indoor games facility

Resource Consumption (Approx. Estimation)

Electricity 630000 [kWh]


Water 1789000 [L]