Assignment-1
3. Estimate the Quantities of the following items of work for a given two-roomed building with
front verandah as per the plan and section shown in the figure
a) Earthwork Excavation in Foundation
b) Lime concrete in foundation (1:1.5:3)
c) 1st class Brick work with (1:6) cement mortar in foundation and Plinth
d) 2 cm Thick DPC (1:2:3) in lime concrete
e) 1st class Brick work in super structure with (1:4) cement mortar
f) Inside Plastering of (1:6) cement mortar
g) RCC work in Slab with a projection of 500mm on all sides (Excluding verandah)