3.

Attempt any two : (10) Printed Pages—2 AR605


(a) State different types of estimate and explain any two.
(Following Paper ID and Roll No. to be filled in your Answer Book)
(b) What are the documents required for preparing detailed
estimate of a building ? Explain each in brief. PAPER ID : 181605 Roll No.

(c) Prepare approximate estimate of a building having Plinth


Area of 1550 sqm using the following data :
B.Arch.
(SEM. VI) THEORY EXAMINATION 2013-14
(i) Plinth area rate Rs. 8,000 per sqm
SPECIFICATION AND ESTIMATION
(ii) Contigencies 5%
(iii) Work Charged Estb 2% Time : 3 Hours Total Marks : 50
(iv) Water supply and sanitary arrangements 15% Note :– (1) Attempt four questions in all, including Q. No. 1 which
(v) Electrification 8% is compulsory.

(vi) Architectural Fee 1.5%. (2) Assume any missing data.

4. Attempt any two parts of the following : (10) 1. Estimate the quantities of any three of the following items of
two roomed building from the given plan and section : (20)
(a) What do you understand by “analysis of rates and its
purpose” ? (a) Earthwork in excavation.

(b) What are the principles of writing detailed specifications ? (b) Masonry work in foundation.

(c) Explain contract bond and labour contract. (c) 2.5 cm Damp proof course.

5. Describe and distinguish any two of the following : (10) (d) Masonry work in superstructure.

(a) Carpet Area and Plinth Area. (e) Interior white washing.

(b) Measurement book and muster roll. (f) 25 mm thick cement concrete flooring.
2. Write detailed specification of any two of the following : (10)
(c) Analysis of rates and schedule of rates.
(a) Brick work in foundation.
(b) Reinforced Cement Concrete (R.C.C.).
(c) First Class Brick.
(d) D.P.C.

AR605/DQJ-21246 (Diagram printed in a separate sheet) 2 875 AR605/DQJ-21246 (Diagram printed in a separate sheet) 1 [Turn Over
3. Attempt any two : (10) Printed Pages—2 AR605
(a) State different types of estimate and explain any two.
(Following Paper ID and Roll No. to be filled in your Answer Book)
(b) What are the documents required for preparing detailed
estimate of a building ? Explain each in brief. PAPER ID : 181605 Roll No.

(c) Prepare approximate estimate of a building having Plinth


Area of 1550 sqm using the following data :
B.Arch.
(SEM. VI) THEORY EXAMINATION 2013-14
(i) Plinth area rate Rs. 8,000 per sqm
SPECIFICATION AND ESTIMATION
(ii) Contigencies 5%
(iii) Work Charged Estb 2% Time : 3 Hours Total Marks : 50
(iv) Water supply and sanitary arrangements 15% Note :– (1) Attempt four questions in all, including Q. No. 1 which
(v) Electrification 8% is compulsory.

(vi) Architectural Fee 1.5%. (2) Assume any missing data.

4. Attempt any two parts of the following : (10) 1. Estimate the quantities of any three of the following items of
two roomed building from the given plan and section : (20)
(a) What do you understand by “analysis of rates and its
purpose” ? (a) Earthwork in excavation.

(b) What are the principles of writing detailed specifications ? (b) Masonry work in foundation.

(c) Explain contract bond and labour contract. (c) 2.5 cm Damp proof course.

5. Describe and distinguish any two of the following : (10) (d) Masonry work in superstructure.

(a) Carpet Area and Plinth Area. (e) Interior white washing.

(b) Measurement book and muster roll. (f) 25 mm thick cement concrete flooring.
2. Write detailed specification of any two of the following : (10)
(c) Analysis of rates and schedule of rates.
(a) Brick work in foundation.
(b) Reinforced Cement Concrete (R.C.C.).
(c) First Class Brick.
(d) D.P.C.

AR605/DQJ-21246 (Diagram printed in a separate sheet) 2 875 AR605/DQJ-21246 (Diagram printed in a separate sheet) 1 [Turn Over