DURATION:3 Hours
REQUIREMENTS
INSTRUCTIONS TOCANDIDATE
QUESTION 1
b) Give two (2) advantages of using corner blocks over line and pins.
(2 marks)
e) List any four (4) tools used when setting out a building.
(4 marks)
QUESTION 2
Aggregate (1 mark)
ii Concrete (1 mark)
ii) Foundation (1 mark)
iv) Manhole (1 mark)
v) Soil vent pipe (1 mark)
QUESTION 4
QUESTION 5
a) State any two (2) reasons why it is important to clear top soil where a
structure is to be constructed. (2 marks)
b) What are the colour codes for the following when wiring a three (3) pin
plug.
i) Live (1 mark)
ii Neutral (1 mark)
iii) Earth (1 mark)
c), i) Illustrate by means of adiagram a reinforced concrete lintel and
show the direction of forces. (5 marks)
ii) Give any three (3) reasons for plastering walls. (3 marks)
3
THEORY
BRICK AND BLOCKLAYING
PAPER NO: 106/15/SO1 -
damp prooi
difference between damp proof courseand (2 marks)
c) i) What is the
membrane.
(2 marks)
foundation.
ii) Give any 2loads carried by a
QUESTION 9
on site?
a) How are the following materials kept
(2 marks)
i) Timber (2 marks)
ii) Wall tiles (2 marks)
iii) Reinforcement rods