3.

Draw construction detail of the following (any two) : Printed Pages—2 AR602
(7.5×2=15)
(Following Paper ID and Roll No. to be filled in your Answer Book)
(a) Timber form work for a rectangular column
PAPER ID : 181602 Roll No.
(b) Timber Centering for an arch opening size 1.5 mtrs.

(c) Expansion joint at slab level B.Arch.


(SEM. VI) THEORY EXAMINATION 2013-14
(d) Cross section of pile cap
CONSTRUCTION AND MATERIALS–VI
4. Differentiate between the utilities of the following (any two) :
(5×2=10) Time : 2 Hours Total Marks : 50
(a) Pile and raft foundation Note :– (i) Attempt all the questions.
(b) Simply supported and End restrained slab (ii) Marks are indicated against each question.
(c) Single layer and Double layer scaffolding. (iii) Assume any missing data.
(iv) Use appropriate scales.

1. Write short notes on any two of the following : (2×5=10)


(i) Earthenware
(ii) Lead
(iii) Polyurethane
2. Draw plan, elevation, section and construction details of a Steel
Rolling Shutter for an opening of 3000 m width and 2400 mm in
height. (15)
OR
Explain the importance of basement tanking in building
construction and support your answer with construction
details. (15)

AR602/DQJ-21243 875 AR602/DQJ-21243 [Turn Over


3. Draw construction detail of the following (any two) : Printed Pages—2 AR602
(7.5×2=15)
(Following Paper ID and Roll No. to be filled in your Answer Book)
(a) Timber form work for a rectangular column
PAPER ID : 181602 Roll No.
(b) Timber Centering for an arch opening size 1.5 mtrs.

(c) Expansion joint at slab level B.Arch.


(SEM. VI) THEORY EXAMINATION 2013-14
(d) Cross section of pile cap
CONSTRUCTION AND MATERIALS–VI
4. Differentiate between the utilities of the following (any two) :
(5×2=10) Time : 2 Hours Total Marks : 50
(a) Pile and raft foundation Note :– (i) Attempt all the questions.
(b) Simply supported and End restrained slab (ii) Marks are indicated against each question.
(c) Single layer and Double layer scaffolding. (iii) Assume any missing data.
(iv) Use appropriate scales.

1. Write short notes on any two of the following : (2×5=10)


(i) Earthenware
(ii) Lead
(iii) Polyurethane
2. Draw plan, elevation, section and construction details of a Steel
Rolling Shutter for an opening of 3000 m width and 2400 mm in
height. (15)
OR
Explain the importance of basement tanking in building
construction and support your answer with construction
details. (15)