I Answer a// questions in one or two sentences. Each question carries 2 marks.
1. calculate the length of common rafter in terms of eave to eave span,
rise is l/3 span.
2. Distinguish between bridge and culvert.
3. Write the total length of straight bar hooked at both ends.
4. State ttre overlapping length of joint of sfraight bars.
5. Define the term sinking firrd (5x2 = l0)

PART B
-
(Maximum marks: 30)
I Answer five of the following questions. Each question carries 6 marks.
any

1. Calculate the earth filling in foundation for the figure - I.


2. A shed of inside dimersion 9.9x6m is provided with gabled roof. Wall thickness
20cm, eaves projection 60cm, rise l/3 span. Calculate the quantity of common rafter
assuming the spacing between common rafter is 50cm and size of common rafter is
50 x 125mm.
3. Calculate the quantity of RCC work l:2:4 nominal size in slab and wearing coat of
slab culvert shown in figure - III
4. Write the detailed specification for pointing
5. Calculate the quantity of staight bars with hooks at both ends in a RCC beam of
clear span 3.4m, wall thickness 20cm, the beam is completely inserted into walls at
both ends. The straight bars are 16mm dia 4 number with cover 2.5cm.
6. State the purpose of valuation.
7. The cost of a building at present market rate is { 6,25,000. The rate of
depreciaton as 2o/o. Determine the value of the building after 10 years. (5x6 = 30)
[04] [r.r.o.
Marks
PART c
-
(Maximum marks: 60)
(Answer one full question from each unit. Each full question carries 15 :rrarks.)

UNrr I
-
quantity of painting doors and windows for the given fig - I
III (a) Compute the 7

(b) Calculate the quantity of brickwork in cement mortar 1:5 for walls in figure -1. 8

On

[V Compute the quantities of the following items for the given figure - II of septic tank.
(, Precast RCC work for tank and soak pit.
(ii) Dry brickwork in soak pit.
(iii) Cement plastering with CM 1:3 for tank and floor.
(rO 50mm aggregate and coarse sand on outer side of soakpit. 15

UNrr II
-
V Compute the quantities of the following items from the given figure-lll of RCC slab culverl.
(l) Earth work excavation and plain cement concrete for foirndation.
(ii)First class brickwork in CM 1:4.
(ur) Steel bars including bending in RCC work. 15

On

VI Calculate the quantities of following items from the given figure-IV of pipe culvert.
(l) Earth work excavation in foundation. ,

(ii) Cement concrete l:4:8 in foundation. 15

UNrr III
-
VII Prepare the detailed estimateof a RCC beam shown in figure -V of 5.5m clear span
size of beam 250 x 550rnm, the side cover 40mm and top and bottom is 3(lmm each.
The wall thickness is ,150mm and the beam has 300 mm bearing over the wtll on both
sides. Also prepare bar bending schedule. 15

On.

VIU Write the detailed specification of the following.


(, Brick masonry work.
(ii) Cement concrete 1:2:4 for RCC. 15

UNrr IV
-
D( (a) Distinguish staight line method and constant percentage method of calculating

depreciation.
  8

O) Explain different methods of valuation.


On
X (a) Define scrap value, salvage value, book value. 7

O) The built up area of a building on 450m2 land near a city is 250m2. The'rlinth area
rate is {
2500/rd including water supply, sanitary and electrification ctrrges. The
age of the building may be taken as 20 years. The cost of the land is< 1200/nf.
The rate of depreciation as 2oh. Calculate the present value of the property. 8
∬ED(15)-5o14
0M創 (N一 節り 仙
、(P'
l^lOR k
AREA Krr cl"tur*
2.oox
29oxz5o

= D00R_100X210
D' H ALL
D: DooR_90X210
因 _憫 IN DO国 _150ス 15o
レJl‐ lt _150ス lろ 〇
z90x5?.O
IN 2- 嗜 ―12ox150
、 PA Nじ LL Eじ

Ct』
職∬

SOtt plT

c!c。 悧
1[ 5omm oia c. I ve{iladng iipe 2'nm High
ヽ ヽ 15Cn R C C Sab
0し “

lnlot

ゴFヨ =J慨 岸 三
,oo mm =r■
・ CC IL
S W Pipe
︱ ﹁覇 就

3∞ Cm● Onl
:緊
lran F6ot Sl€P3

COarSe

[104] Pぃ 、Fl G■
10 crnc c Woanng Colt
20$,F Oia SaraaO<c-

: -c.C- J 3i6. . ..
t{ LF SECTTONAL ELEVATTON



ξR ぉ■礎︺

T き〓 B2 ∈8 ●



肇おい59

ξ
.I


量ョ:
ξ 1遍 いr SECTO― ―
「 IG雨

22h“ ″ HAtド STRAヽ (■ ■ A、 D
' Bc、 T● P 2ャ λ・ 4 NoS
16 um9 8lt,t'9 5.T IRR U PS 3""′ lRRoPS
'■
Ar{cHo(. BA (lC
e NoJ lI(:ξ P Cr「 Ar l5crD I


8"ぃ ,sTrRRυ Pξ ■ 15c"CIこ 13ヽ OS_

5・ 50b.

RC c BEAM-
Fre li-
20 cm
T
協.50

こ ‐ JL.・
L 30

L50

CROSS SKπ 10N XYI ' 310


OFW“ WALL HAT"F SECilOr{At E'EvATh ON ABCO

wall
'
FaWalwfiParaPetabow
一ZO F Ou∽ ”≦‘一



SECT!ONAL PLAN

担一

0っL OZOコ

Collar」 dm
●● ●‘﹂ 0 一 ︰︱︱︰︰

﹃ 

― ・
‐ FOUNDAT10N PLAN


1■
1111
4 一
ユ ・

昨n

fr G \v

You might also like