You are on page 1of 1

PROJECT TITLE & LOCATION: PROPOSED 2-STOREY RESIDENTIAL BUILDING

DAILY TIMESHEET
Date:__________________ Day:_________________
Status
Activity Time- Signature Activity Time-
No. Name Position A – Absent Time-In Time-In Signature
(A.M.) Out (P.M.) Out
P - Present
1
painiting painiti
2
ng
painiting concreting concre painiting
3
ting
4. concreting chb concreting

5. laying
6. tiling
Masonry works

____________________________
Approved by: Project Engineer
DAILY TIMESHEET
Date:__________________ Day:_________________
Status
Activity Time- Signature Activity Time-
No. Name Position A – Absent Time-In Time-In Signature
(A.M.) Out (P.M.) Out
P - Present
1. painiting Excavation Skim coat

2. concreting painiting Cutting of rsb

3. concreting

4. Steel works

5. painiting
6. concreting

____________________________
Approved by: Project Engineer

You might also like