Professional Documents
Culture Documents
Timesheet 23
Timesheet 23
DAILY TIMESHEET
Date:__________________ Day:_________________
Status
Activity Time- Signature Activity Time-
No. Name Position A – Absent Time-In Time-In Signature
(A.M.) Out (P.M.) Out
P - Present
1
2 3pm painiting
4. painiting concreting
5. concreting painiting
6. Steel works concreting
chb
____________________________
Approved by: Project Engineer
DAILY TIMESHEET
Date:__________________ Day:_________________
Status
Activity Time- Signature Activity Time-
No. Name Position A – Absent Time-In Time-In Signature
(A.M.) Out (P.M.) Out
P - Present
1. painiting Skim coat
3. tiling
5. concreting
6. laying
____________________________
Approved by: Project Engineer