PROJECT TITLE & LOCATION: PROPOSED 2-STOREY RESIDENTIAL BUILDING

DAILY TIMESHEET
Date:__________________ Day:_________________
Status
Activity Time- Signature Activity Time-
No. Name Position A – Absent Time-In Time-In Signature
(A.M.) Out (P.M.) Out
P - Present
1 painiting
2 concreting concreting

3 Steel works painiting


concretin
4.
g
5. Cutting of rsb
6. tiling painiting
concreting

____________________________
Approved by: Project Engineer
DAILY TIMESHEET
Date:__________________ Day:_________________
Status
Activity Time- Signature Activity Time-
No. Name Position A – Absent Time-In Time-In Signature
(A.M.) Out (P.M.) Out
P - Present
1. Excavation Skim coat

2. painiting

3. painiting

4. concreting Masonry works

5. chb
6. laying painiting
concreting

____________________________
Approved by: Project Engineer