CONSTRUCTION SURVEILLANCE REPORT (CSR)

Contract No.: MPMRCL IN-07 Department: QA/QC


Contractor’s Name: KSMB Report No: IN-07-KSMB-QMS-CSR-0066
Surveillance Report Details
Date 24.05.2023 Day Friday
Location MPMRCL IN-07 Start Time: 03:00PM Finish Time 05:00 PM
Teams QA/QC

1. Mr. Anupam Vijay (SRE)


Attendees: 2. Mr. Virendra Verma (QA Manager)
3. Mr. Santosh Sahu (QA/QC Eng.)
4. Mr. Siraj Ahamad (QA/QC Engineer)

Surveillance on activity- Date of casting, Formwork & Curing.

Page 1 of 6
Controlling Documents
S. No. Document Rev
1. Tender Documents.
2. Technical Specifications.
3. Various Method Statements
4.

OBSERVATIONS
Positive/
S. Specific Negative/
Description Action required/ taken
No. Location NCR
required

Page 2 of 6
Neither date of casting mentioned nor curing observed in
newly casted retaining wall.

 Do mention date of casting and curing at the


earliest.
Boundary
wall pile Negative
area near
loading-
1. unloading
way

Page 3 of 6
Adequate side support found for formwork found for Repair
bay pile cap.

 Do provide adequate side support same as to


avoid bulging of structure.
Repair bay
pile cap Positive
2.

Page 4 of 6
Curing work in progress for brick masonary work.

.
 Do Curing in the same way and keep the
surface moist for seven days regularly.
Stabling
Shed Grid- Positive
3. E

TOTAL 03