Controlling Documents
S. No. Document Rev
1. Tender Documents.
2. Technical Specifications.
3. Various Method Statements
4.
OBSERVATIONS
Positive/
S. Specific Negative/
Description Action required/ taken
No. Location NCR
required
Page 2 of 6
Neither date of casting mentioned nor curing observed in
newly casted retaining wall.
Page 3 of 6
Adequate side support found for formwork found for Repair
bay pile cap.
Page 4 of 6
Curing work in progress for brick masonary work.
.
Do Curing in the same way and keep the
surface moist for seven days regularly.
Stabling
Shed Grid- Positive
3. E
TOTAL 03