IRF No. :
Project :
1. CADANGAN MEROBOHKAN BANGUNAN PODIUM SEDIADA DAN MEMBINA BANGUNAN HOTEL 50 TINGKAT AZ/PNB/IRF-S/13.2.1/Vol.____
BESERTA 6 TINGKAT BESMEN YANG MENGANDUNGI TEMPAT LETAK KERETA DAN SERVIS MEKANIKAL / /_________
ELEKTRIKAL, DAN 1 BLOK PODIUM 5 TINGKAT YANG MENGANDUNGI TEMPAT LETAK KERETA, PENCAWANG
ELEKTRIK UTAMA TNB DAN KEMUDAHAN HOTEL YANG AKAN DISAMBUNG DENGAN PEJABAT SEDIADA.
2. MENAIK TARAF BANGUNAN PEJABAT 35 TINGKAT YANG SEDIADA DI ATAS LOT 1194 JALAN SULTAN ISMAIL,
SEKSYEN 57, BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN UNTUK TETUAN PERMODALAN NASIONAL
BERHAD
Type of Work : Drawing No .: Date:
Location : Page: 1 of 1
Status Of Inspection:√ =
Acceptable X = Not Acceptable, Remarks
No. Items To Be Checked After Concreting - = Not Applicable
Subcont’s Consultant’s
AZSB Rep.
Rep. Rep.
1 SAFETY
PPE Compliance
Proper supervision on props and scaffolding
Stacking and storage of material
2 STRIKING OFF FORMWORK
Minimum period of formwork obtained before
striking off
- Vertical faces of beams, wall, column, pilecap,
foundation plinths and precast items – 3 days
- Underside of - slabs – 14 days
- Underside of beams – 28 days
3 PROPS
Props are provided after dismantling of
formwork
4 CONCRETE FINISH
Cleanliness
Finished surface (±10mm)
Alignment (3mm / 1m)
Bulging / twist
Cracks (Shrinkage, Structural, etc)
Honeycomb
Segregation
No exposed rebar
Cold joint & formwork smooth
Formwork, nails, zinc strips, etc removed
5 M/E OPENING AND PIPE SLEEVES
Opening size (+10mm for size)
Position (±25mm for location)
Comments :
We have carried out all necessary inspections and verify that the above items/activities conform to the contract
specifications/document.
Signature
Name
Designation
Company
Date
Note : This Inspection Checklist need to be submitted with the Inspection Request Form (IRF)