Daqing Petroleum Iraq Branch HSE-MS/Doc. No.

22

JOB SAFETY ANALYSIS 工作安全分析

Rig: Well: Date:


Associated Permit No(IF required).:
工作许可号(如果需要)
Loacation/Area: Date Of Elaboration:
位置/区域
Work/Job/Project : Crew:
工作/工程名称 WORKING AT STABBING BOARD 人员:
DURING CASING
Description For the job: Estimated Time Hours
工作描述: 预计时间: 小时
N0. Work Sequence Hazards or Potential Incidents Recommendations to Eliminate or
(Job Steps) Reduce Hazards
CONDUCT SAFETY
PINCH POINTS / PPE / TEAM WORK/ PAY
MEETING WITH
ATTENTION ON THE JOB BEEN DONE &
1 CREW & JSA TO BE RISK ASSIGMENTS.
STOP ALL UNSAFE ACTS AND WORK AT A
FOLLOWED BEFORE
NORMAL SPEED
STARTING THE JOB
STABBER BEFORE
CLIMBING LADDER
MUST ALWAYS USE
HARDNESS AND
2 RIDDING BELT, WEARS AND TEARS,CRACKS AND BENDS
CHECK AND
INSPECT, HARDNESS
AND ECT BEFORE
USE.
AFTER LANDING ON
STABBING BOARD
FIX HARDNESS TO
FALL ARRESTOR, REPORT ALL INCIDENTS &
3 CHECK ARRESTOR, ACCIDENTS AND NEAR MISS
STABBING BOARD IMMEDIATELY.
AND ALSO THE
POSITIONING OF
BOARD.
STABBER MUST BE A
TRAINED PERSON IN
THE WORK AND
SAFETY PROCEDURE
AND HOW TO
4
OPERATOR THE
STABBING BOARD
AND CONTROLS AND
WORKING AT
HEIGHTS.
5 SINGLE JOINT PROPER
ELEVATOR PICK'S UP SIGNALS/COMMUNICATION/FALLING
Daqing Petroleum Iraq Branch HSE-MS/Doc. No.22

A JOINT FROM V
DOOR THEN THE
JOINT IS STABBED
AND SET ON THE
RIGHT THREAD
SPINNER TONGE IS
PUT ON STARTS TO
OBJECTS
MAKE UP A COUPLE
OF THRADS,
STABBER RELEASE
THE SINGLE JOINT
ELEVATOR AND
THEN CONNECT THE
MAIN ELEVATOR.

Executor Personnel 执行人员


Company/RIG Position Signature Company/RIG Position Signature
公司/队伍 岗位 签字 公司/队伍 岗位 签字

Elaborated By: HSE Supervisor.: Rig Manager:

Name: Name: Name:


Signature:_________________ Signature: ____________ Signature: ____________

Observations: Personnel Understood And Assumed Risk Associated With The Work To Be Done.