Daqing Petroleum Iraq Branch HSE-MS/Doc. No.

22

JOB SAFETY ANALYSIS 工作安全分析

Rig: Well: Date:


Associated Permit No(IF required).:
工作许可号(如果需要)
Loacation/Area: Date Of Elaboration:
位置/区域
Work/Job/Project : Crew:
工作/工程名称 PRESSURE TESTING BOP’S 人员:

Description For the job: Estimated Time Hours


工作描述: 预计时间: 小时
N0. Work Sequence Hazards or Potential Incidents Recommendations to Eliminate or
(Job Steps) Reduce Hazards

READY ALL
1 EQUIPMENT NEEDED SLIP & INJURE YOURSELF DON’T GET IN A HURRY
FOR THE JOB
MAKE SURE TIE DOWN
BOLTS ON CASING
DAMAGE THE TEST PLUG OR CASING BOWL
2 BOWL ARE ALL THE DOUBLE CHECK TIE DOWN BOLTS
WAY OUT
INSTALL TEST PLUG
ON JOINT OF DRILL
PRESSURING UP THE CASING BELOW THE DOUBLE CHECK THAT THE CSG BOWL
PIPE. RUN IT INTO THE
3 TEST PLUG VALVE IS OPEN.
BOP’s & OPEN VALVE
ON CSG BOWL.

HOOK UP CHART
4
RECORDER
FILL UP BOP’S WITH
STAY BACK AWAY FROM THE
FUID – CLOSE BAG – GETTING HIT WITH MUD BLOWING UP
EQUIPMENT BEING TESTED
5 OPEN KILL LINE AND THROUGH THE STACK
START TESTING
BLEED OFF PRESURE
AT PUMP AND CLOSE
VALVES TO BE WEAR SAFETY GOGGLES AND BLEED
6 TESTED – REPEAT EYE INJURY OFF PRESSURE SLOWLY
WITH STACK &
MANIFOLD

DISCONECT TEST
7 EQUIPMENT AND PUT SLIP & INJURE YOURSELF DON’T GET IN A HURRY
AWAY

PUT ALL VALVES IN


8 THERE CORRECT PINCH POINTS USE COMMON SENSE
POSITION
Executor Personnel 执行人员
Company/RIG Position Signature Company/RIG Position Signature
公司/队伍 岗位 签字 公司/队伍 岗位 签字
Daqing Petroleum Iraq Branch HSE-MS/Doc. No.22

Elaborated By: HSE Supervisor.: Rig Manager:

Name: Name: Name:


Signature:_________________ Signature: ____________ Signature: ____________

Observations: Personnel Understood And Assumed Risk Associated With The Work To Be Done.