You are on page 1of 3

Daqing Petroleum Iraq Branch HSE-MS record No.

22

Rig: Well: Date:

Associated Permit No.: 工作许可号


Loacation/Area:
Date Of Elaboration:
位置/区域
Work/Job/Project (Contract No. )
合同号: Crew:
Brief Descriptión (Work/Operation): Estimated Time Hours
工作描述: 预计时间: 小时

Activities Risk * Reason Of The Risk Prevention And Control Actions


N0. 活动 风险 风险产生原因 预防和控制措施
序号
Review the work procedure and the safety issues Confusion Not knowing all steps of the job, confusion. Read and understand all steps of the job.PJSM,
which will be presented by the third party Follow the safety precaution.
company, best Practice Weld permit needed.
1
Gather all tools and equipment and inspect. Injury Injury due to faulty tools or equipment. Good inspect for the tools and don’t work with
damaged or home made tools or not fit for the
propose.
2
Assisting third party in Welding job. Personal To many people involved in the place. Pinch Clear the rig floor from the worker and stop all the
Injury points, dropped objects in the well, fire hazards, job in the floor,know what is needed and make sure
serious injury or death. it is in good working condition. Experienced
operators only. Good communication.Clear the
location from the unnecessary peoples.
3
Welding the casing in the cellar. Fire Ignition source can cause fire exposure, dropped Inspect the fire fighting equipment and Fire Ext.
explosion objects inside the well, Damage equipment. function test, use adequate NO. from fire
extinguisher in the place, Fire watcher must be
stand by and alert,inspect the fire fitting water line
and make it ready,Competent person to be fire
watcher.
4
Eyes damage by the flying burned sparks. Eyes injury Wear appropriate eye protection, (Clear face shield).
Standing behind the grinder and with the wind
5 direction.
Burns caused by contact with hot surfaces of Burns During Taching the welding area directly. Don’t touch the hot area, use proper welding gloves,
welding area. Injury Cooling the area that may damage by heat.
6
Working in confined space. AsphyxiationAsphyxiation. Gas testing must be carried out periodically, make
sure there is a good ventilation available in the work
place.
7
Working with the electricity. Electric shoke, electric injury. Inspect all the cables before use, use the proper
cable, use the loss proof connection, drain the cellar
and the working area don’t wash or work with the
water in the rig floor.
8

Executor Personnel 执行人员

Name 姓名 Signature Name 姓名 Signature 签字


签字

Elaborated By: Drilling Supervisor. Rig Manager:


Name: Name: Name:
Signature:_________________ Signature: ____________ Signature: ____________

You might also like