JOB SAFETY ANALYSIS(JSA)

Daqing Petroleum Iraq Branch Date: 22-Jul-11

Country & Location Rig: DQ019

Work Activity: TRIPPING, RIH DRILL PIPE JSA # 3

IS A PERMIT TO WORK REQUIRED YES ü NO PRE JOB SAFETY MEETING HELD YES ü NO

Work Sequence (Job Steps) Hazards or Potential Incidents Recommendations to Eliminate or


Reduce Hazards

1 RUN BLOCKS TO MONKEY BOARD HOSES CATCHING BREAKOUT TONG ENSURE TONG CLEAR

2 P/U STAND WITH BLOCKS STAND STRIKING FLOORMEN USE TAILING ROPE

3 SPIN IN AND M/U STAND STRUCK BY SPINNER OR TONGS KEEP BEHIND TONGS

4 RIH AND SETTING SLIPS PINCH POINTS REDUCE RUNNING SPEED

DRILLERS TO STOP BLOCKS AND WAIT FOR


5
DERRICKMEN TO CHANGE OVER DURING SHIFT CHANGE

10

List Below the Personal Protective Equipment,Special Tools and Other Safety Equipment Required to do this Job

NORMAL PPE, SAFETY AWARENESS


NORMAL PPE, SAFETY AWARENESS