You are on page 1of 2

Daqing Petroleum Iraq Branch HSE-MS/Doc. No.

22

JOB SAFETY ANALYSIS 工作安全分析

Rig: Well: Date:


Associated Permit No(IF required).:
工作许可号(如果需要)
Loacation/Area: Date Of Elaboration:
位置/区域
Work/Job/Project :CHECK PUMPS WHILE LOGGING Crew:
人员:
工作/工程名称
Description For the job: Estimated Time Hours
工作描述: 预计时间: 小时
N0. Work Sequence Hazards or Potential Incidents Recommendations to Eliminate or
(Job Steps) Reduce Hazards
ACCIDENTAL OPERATION OF PUMPS
1 LOCK OUT PUMPS IN RESULTING IN CRUSHED BODY PARTS MAKE SURE PUMPS ARE LOCKED OUT
SCR

2 GET THE PROPER WRONG TOOLS RESULT IN PINCHED FINGERS


WATCH PINCH POINTS
TOOLS FOR THE JOB
OPEN PUMP AND
3 CHECK VALVES,
WORN PARTS COULD RESULT IN RIG DOWN
SEATS , PISTONS , PREVENTIVE MAITANENCE
TIME.
LINERS. REPLACE
WORN PARTS
CLEAN UP SPILLED MUD & BE
4 CLEAN UP MESS AND
SLIPPERY SURFACE CAREFULL MOVEING AROUND
PUT AWAY TOOLS

5 UNLOCK PUMP AND CLEAR EVERYONE AWAY FROM PUMP


TEST THROUGH WHEN START UP
BLEEDER LINE

Executor Personnel 执行人员


Company/RIG Position Signature Company/RIG Position Signature
公司/队伍 岗位 签字 公司/队伍 岗位 签字

Elaborated By: HSE Supervisor.: Rig Manager:


Daqing Petroleum Iraq Branch HSE-MS/Doc. No.22

Name: Name: Name:


Signature:_________________ Signature: ____________ Signature: ____________

Observations: Personnel Understood And Assumed Risk Associated With The Work To Be Done.

You might also like