Associated Permit No(IF required).: 工作许可号(如果需要) Loacation/Area: Date Of Elaboration: 位置/区域 Work/Job/Project :CHECK PUMPS WHILE LOGGING Crew: 人员: 工作/工程名称 Description For the job: Estimated Time Hours 工作描述: 预计时间: 小时 N0. Work Sequence Hazards or Potential Incidents Recommendations to Eliminate or (Job Steps) Reduce Hazards ACCIDENTAL OPERATION OF PUMPS 1 LOCK OUT PUMPS IN RESULTING IN CRUSHED BODY PARTS MAKE SURE PUMPS ARE LOCKED OUT SCR
2 GET THE PROPER WRONG TOOLS RESULT IN PINCHED FINGERS
WATCH PINCH POINTS TOOLS FOR THE JOB OPEN PUMP AND 3 CHECK VALVES, WORN PARTS COULD RESULT IN RIG DOWN SEATS , PISTONS , PREVENTIVE MAITANENCE TIME. LINERS. REPLACE WORN PARTS CLEAN UP SPILLED MUD & BE 4 CLEAN UP MESS AND SLIPPERY SURFACE CAREFULL MOVEING AROUND PUT AWAY TOOLS
5 UNLOCK PUMP AND CLEAR EVERYONE AWAY FROM PUMP
TEST THROUGH WHEN START UP BLEEDER LINE
Executor Personnel 执行人员
Company/RIG Position Signature Company/RIG Position Signature 公司/队伍 岗位 签字 公司/队伍 岗位 签字