You are on page 1of 2

Daqing Petroleum Iraq Branch HSE-MS record No.

22

JOB SAFETY ANALYSIS 工作安全分析

Rig:DQ012 Well:RU 400 Date:24-06-2012


Associated Permit No.: 124690
工作许可号
Loacation/Area: Date Of Elaboration:
位置/区域 Cat walk to rig floor 24-06-2012

Work/Job/Project (Contract No. ) Crew: DAY SHIFT


合同号:cementing plug
Brief Descriptión (Work/Operation) Estimated Time Hours
工作描述 预计时间: 小时

N0. Activities Risk * Reason Of The Risk Prevention And Control Actions
序号 活动 风险 风险产生原因 预防和控制措施
1 PUNCH BE AWARE OF BODY POSITION
HOLD PRE JOB MEETING MASHED FINGERS
POINT
2 TIDY DRILLING TOOLS FROM RIG INJURY STAY IN SAFE AREA
BODILY INJURY
FLOOR
3 DROP FALLING OBJECTS FROM WEAR HARNESS AND SECURE
HANG SHEAVE IN ELEVATORS AND
DERRICK, WORKING AT ALL EQUIP
CHAIN OFF FLOOR SHEAVE
HEIGHT IN SUB
4 RUN BLOCKS UP THE DERRICK TRIPPING TANGLED IN WIRE LINE STAY CLEAR OF MOVING LINE
5 CHAIN BRAKE DOWN SECURELY DROP DROPPING BLOCKS TO FLOOR OBSERVE SURROUNDINGS
6 READ AND RECORD HOLE FILL LOSS LOSS OF FLUID OR GAIN OF MONITOR WELL AT ALL TIMES
MONITOR WELL FLUID
7 PINCH USING APPROPERATE HAND WEARING PPE, EXCLUD NON
RIG UP EQUIPMENT POINT TOOLS,ENSURE SAFETY PINS ESSENTIAL PERSONNEL TO
IN PLACE WORK AROUND THE AREA.
Daqing Petroleum Iraq Branch HSE-MS record No. 22

Executor Personnel 执行人员


Name I.D. N0. Signature Client Contr. Name I.D. N0. Signature Client Contr.
姓名 卡号 签字 甲方 乙方 姓名 卡号 签字 甲方 乙方

HSE Supervisor. Rig Manager:


Name: Name:
Signature: ____________ Signature: ____________

You might also like