You are on page 1of 1

Daqing Petroleum Iraq Branch HSE-MS/Doc. No.

22

JOB SAFETY ANALYSIS 工作安全分析

Rig: Dq-011 Well: RU-398 Date:


Associated Permit No(IF required).:
工作许可号(如果需要)
Loacation/Area: Date Of Elaboration:
位置/区域
Work/Job/Project : Crew:
工作/工程名称 Electrical Job / 人员:

Description For the job: Estimated Time Hours


工作描述: Welding Job 预计时间: 小时
N0. Work Sequence Hazards or Potential Incidents Recommendations to Eliminate or
(Job Steps) Reduce Hazards
Equipments May be damage Check all Equpments
Electric Cable Check Cable before Cable & Isolate all
Damage / Electric Shock
joints.
PPE Rubber Gloves, Rubber Isolated Tools
Fire Fire Extinguisher
Fire Hazards

Electrical Shocks Never touch naked cables Isolate all cables / follow LOTO
Watch Man For watching on work

Executor Personnel 执行人员


Company/RIG Position Signature Company/RIG Position Signature
公司/队伍 岗位 签字 公司/队伍 岗位 签字

Elaborated By: HSE Supervisor.: Rig Manager:

Name: Name: Name:


Signature:_________________ Signature: ____________ Signature: ____________

Observations: Personnel Understood And Assumed Risk Associated With The Work To Be Done.

You might also like