DNO IRAQ AS KU-PR-QS-HSE

TOOLBOX MEETING REPORT DATE:

TOOLBOX MEETING TOPIC: PTW NUMBER:

SN JOB STEPS IDENTIFIED HAZARDS CONTROL MEASURES


Provide list of valve to ensure proper
01 Closed the valves. Possible to close wrong valve.
valves will be closed. Inform TL.
02 Drain the flow lines. Presence of H2S, exposed to chemicals Do gas test and wear appropriate PPE.
Damage hose may use, or incorrect Use correct connector and ensure to
03 Purge the line with nitrogen.
connection to utility e.g. air or water line connect to nitrogen line utility.
Use fire blanket to contain spark.
Sparks come out
Only certified welder do the task.
Operator do the welding job
Use PPE
04 Weld the flow line. Exposed to heat, H2S etc.
Provide fire extinguisher at site
Fire hazard
Check power tools before use and
Electrical hazard
ensure lock out tag out on switch board.
Do proper housekeeping to ensure
05 Housekeeping Dirty work place.
clean work area.

Team Members:
1. 5. 9.
2. 6. 10.
3. 7. 11.
4. 8. 12.

Conducted by Verified by
Name Name
Position Position
Date Date
Signature Signature