PROJECT
JAIPUR METRO RAIL PROJECT
STAGE-1 (JP/EW/C2)
CODE IRC,IS
SUBJECT
COMMENTS
DESIGNED CHD
REV PARTICULARS Date
Balsara House 3rd Flr 41-45 Nagindas Master Road, Mumbai – 400 001 Tel : 022 2265 5039/2265 5079/2265 5138/2265 3079/2265 4235
Fax : 91-22-2265 2011 e-mail:spacpl@vsnl.com Website : www.spacpl.com
Shirish Patel and Associates DELHI RAIL CORPORATION LTD.
Consultants Private Limited JAIPUR METRO RAIL PROJECT
STAGE-1 (JP/EW/C2)
Table Of Content
3.0 References 3
5.0 Assumption 5
6.0 Calculations 6
10.0 Summary 28
This submission contains the design of substructure with MONO PILE foundation for Pier group Containing piers LP1 to
LP4 on North side towards Ajmer region at proposed Widening of Ajmer Pulia of Contract JP/EW/C2.
Each piers from LP1 to LP4 consists of two piers in transverse direction.
The columns at road level and ground level are connected with each other with road level beam and plinth beam respectively.
The super-structure consists of 450mm thick solid slab supported on Road level beams of size 1200mm x 1000mm and
existing retaining towards south side.
The size of plinth beam is 750mm x 900mm in Longitudinal direction and 750mm x 750mm in Transverse direction.
Monopile of 1000mm dia is proposed with 1.3 x 1.3 m Pilecap above pile and column of 900mm x 900mm over pilecap.
Details as Follows,
The pier supports the proposed widening of the solid approach at the ajmer pulia region, to incorporate additional
2 lane (Width 8.40m). Maximum deck slab width = 10.235m
2.1 ) The design has been carried generally in accordance with the design loadings as per IRC 6.2010.
2.2 ) The columns are connected with road level beam and plinth beam at road level and ground level respectively in
Longitudinal direction & in transverse direction, hence the mono pile is restrained in both direction.
Hence the pile is considered as fixed head pile in both Longitudinal and Transverse direction.
2.3 ) Depth of fixity for fixed head pile are done as per (IS 2911/Part I/Sec-2/Ament.3/Appendix-C/Cl.5.5.2)
presented in Appendix C.
2.4 ) The design approach is to consider substructure subjected to both static loading ( due to dead loads, SIDL,
loads due to live load etc. and dynamic loads due to siemic activity.
2.5) The seismic analysis is carried as per IRC :6 -2000 / Modified cl. 222.
2.6 ) The piles & column & beam are modelled as line element.
2.7 ) The structure with column & mono pile with fixed support at pile fixity level is analysed in 'STAAD-Pro' software
The DL & SIDL over deck are applied over Longitudinal beam per metre and LL are applied as point load
at column top.
The loads are combined in the software to get the SLS loads. This is explained in detail at respective place in
STAAD file.
2.8 ) The time period and spectral acceleration Sa/g value for calculating the Earthquake force is obtained
from STAAD Analysis which is shown in Appendix F.
2.10) The earthquake forces for all members are calculated individually and are lumped on member as member force
for DL & SIDL and for LL, forces are lumped at column top .
2.11) The piles are then designed for all load combinations in the ' OASYS' software.
2.12) Concrete grade M45 for pier & Road level beam & M35 for Piles & pilecap.
2.13) Pile lengths are calculated as per soile investigation test report no .SR-38_11-12 (Pat 7) near NRP-111.
prepared by CEG Test house, Jaipur.
2.14) Due to slenderness of column, stresses of concrete and steel are reduced as per IRC21-2000 which is
presented in Appendix D.
3.0) REFERENCES
3.1) Soil Investigation test Report no. SR-38_11-12 (Part 7), Borehole no. BH 17, report prepared by “CEG Test house, Jaipur “
3.2) IRC-6:2000
3.3) IRC-21:2000
5.0 ) Assumptions :
Following assumption are made in this submission which will be updated as per detailed design
of these elements.
6.4) Loading :
6.4.1Dead Loads
Load of slab on Beam B1 = 29 kN/m (Ref Appendix A)
Load of slab on Beam B2 = 76 kN/m (Ref Appendix A)
Load of slab on Retaining wall = 10 kN/m (Ref Appendix A)
Wt. of Pilecap +soil (RHS Pilecap) = Area = 1.69 x 1.50 x 25 = 80 kN
+ Area = 1.69 x 0.50 x 20
Wt. of Pilecap +soil (LHS Pilecap) = 1.30 x 1.30 x 1.50 x 25 = 80 kN
+ 1.30 x 1.30 x 0.50 x 20
Beam size = 1.20 x 1.00
Self weigth of portal girder = 1.20 x 1.00 x 25 = 30 kN/m
6.4.2Super-Imposed dead load ( SIDL ) SIDL is due to wearing coat of thickness of = 106 mm
Load of wearing coat over slab on Beam B1 = 6 kN/m (Ref Appendix A)
Load of wearing coat over slab on Beam B2 = 16 kN/m (Ref Appendix A)
Load of wearing coat over slab on retaining wall = 2 kN/m (Ref Appendix A)
2
Area of Crash barrier = 0.33 mm /m
SIDL Load due to crash barrier on Beam B1 ( 0.330 x 25.00 ) = 8 kN/m
SIDL Load due to crash barrier on Beam B2 ( 0.330 x 25.00 ) x 2 = 17 kN/m
The precast slab is resting on beam frame in longitudinal and transverse direction. The slab is considered spanning in transverse direction.
The Live Load on slab will be tranferred to longitudinal beam i.e. B1 & B2.
Since the live load has been applied directly over the column arrangement in the staad model, there is a need for reduction of the reaction &
moment due to live load, since the vehicle axle will actually be placed at a distance from the crash barrier, as shown in Fig 1A to 1D.
The Live Load with reduction factor for design of Longitudinal beam, column, pilecap and monopile will be applied in STAAD Pro.
The Load on beam B1 (Towards North side) can be maximum when the vehicle will be at minimum distance from North side parapet wall.
The Load on beam B2 (Towards South side) can be maximum when the c.g. of load of vehicle will be on beam.
Deck Slab
1.75 3.0
Deck Slab
1.75 3.0
Deck Slab
2.08 1.93
Deck Slab
2.07 2.05
2.475
2 475 10 5
10.5 10 5
10.5 9 069
9.069 1 25
1.25
LP4 LP3 LP2 LP1
1 Lane Class -
A 412 (LC454) 412 (LC396) 394 (LC495) 337 (LC441) App- B /TABLE B1
2 Lane Class -
A 824 (LC454) 824 (LC396) 788 (LC495) 674 (LC441)
1 Lane Class -
70R(W) 880 (LC24) 942 (LC40) 909 (LC147) 633 (LC166) App- B /TABLE B1
1 Lane Class -
70R(T) 794 (LC204) 723 (LC226) 719 (LC247) 685 (LC264) App- B /TABLE B1
6.4.3 (f) Maximum Longitudinal moment at Road lvl beam bottom (on Column LP1 to LP4) :-
1 Lane Class -
A 174 (LC467) 131 (LC488) 125 (LC431) 158 (LC434) App- B /TABLE B3
2 Lane Class -
A 348 (LC467) 262 (LC488) 250 (LC431) 316 (LC434)
1 Lane Class -
70R(W) 420 (LC118) 309 (LC117) 260 (LC73) 297 (LC73) App- B /TABLE B3
1 Lane Class -
70R(T) 454 (LC214) 365 (LC217) 306 (LC308) 357 (LC258) App- B /TABLE B3
6.4.3 (g) Maximum Longitudinal moment at Pier bottom (on Column LP1 to LP4) :-
1 Lane Class -
A 69 (LC390) 65 (LC411) 72 (LC431) 64 (LC435) App- B /TABLE B2
2 Lane Class -
A 138 (LC390) 130 (LC411) 144 (LC431) 128 (LC435)
1 Lane Class -
70R(W) 169 (LC31) 172 (LC30) 138 (LC73) 125 (LC73) App- B /TABLE B2
1 Lane Class -
70R(T) 180 (LC215) 195 (LC215) 159 (LC326) 145 (LC326) App- B /TABLE B2
6.4.3 (h) Maximum LL reaction on Column LP1 to LP4 (North side) after applying reduction factor:
1 Lane Class -
A 366 (LC454) 366 (LC396) 350 (LC495) 300 (LC441)
2 Lane Class -
A 513 (LC454) 513 (LC396) 491 (LC495) 420 (LC441)
1 Lane Class -
70R(W) 580 (LC24) 621 (LC40) 599 (LC147) 417 (LC166)
1 Lane Class -
70R(T) 559 (LC204) 509 (LC226) 506 (LC247) 482 (LC264)
6.4.3 (i) Maximum Longitudinal moment at Road lvl beam bottom on Column LP1 to LP4 (North side) after applying reduction factor:
1 Lane Class -
A 155 (LC454) 116 (LC396) 111 (LC495) 140 (LC441)
2 Lane Class -
A 217 (LC454) 163 (LC396) 156 (LC495) 197 (LC441)
1 Lane Class -
70R(W) 277 (LC24) 204 (LC40) 171 (LC147) 196 (LC166)
1 Lane Class -
70R(T) 319 (LC204) 257 (LC226) 215 (LC247) 251 (LC264)
6.4.3 (j) Maximum Longitudinal moment at Pier bottom on Column LP1 to LP4 (North side) after applying reduction factor:
1 Lane Class -
A 61 (LC454) 58 (LC396) 64 (LC495) 57 (LC441)
2 Lane Class -
A 86 (LC454) 81 (LC396) 90 (LC495) 80 (LC441)
1 Lane Class -
70R(W) 111 (LC24) 113 (LC40) 91 (LC147) 82 (LC166)
1 Lane Class -
70R(T) 127 (LC204) 137 (LC226) 112 (LC247) 102 (LC264)
On south side, cg of load can come on beam directly. Hence consider 100% LL on South side beam
6.4.3 (k) Maximum LL reaction on Column LP1 to LP4 (South side) after applying reduction factor:
1 Lane Class -
A 412 (LC454) 412 (LC396) 394 (LC495) 337 (LC441)
2 Lane Class -
A 824 (LC454) 824 (LC396) 788 (LC495) 674 (LC441)
1 Lane Class -
70R(W) 880 (LC24) 942 (LC40) 909 (LC147) 633 (LC166)
1 Lane Class -
70R(T) 794 (LC204) 723 (LC226) 719 (LC247) 685 (LC264)
6.4.3 (l) Maximum Longitudinal moment at Road lvl beam bottom on Column LP1 to LP4 (South side) after applying reduction factor:
1 Lane Class -
A 174 (LC454) 131 (LC396) 125 (LC495) 158 (LC441)
2 Lane Class -
A 348 (LC454) 262 (LC396) 250 (LC495) 316 (LC441)
1 Lane Class -
70R(W) 420 (LC24) 309 (LC40) 260 (LC147) 297 (LC166)
1 Lane Class -
70R(T) 454 (LC204) 365 (LC226) 306 (LC247) 357 (LC264)
6.4.3 (m) Maximum Longitudinal moment at Pier bottom on Column LP1 to LP4 (South side) after applying reduction factor:
1 Lane Class -
A 69 (LC454) 65 (LC396) 72 (LC495) 64 (LC441)
2 Lane Class -
A 138 (LC454) 130 (LC396) 144 (LC495) 128 (LC441)
1 Lane Class -
70R(W) 169 (LC24) 172 (LC40) 138 (LC147) 125 (LC166)
1 Lane Class -
70R(T) 180 (LC204) 195 (LC226) 159 (LC247) 145 (LC264)
The maximum vertical load and maximum braking force from all live load case is considered for earthquake and
substructure calcuation. From above, governing live load case is 1 Lane Class - 70R(W)
In order to get time period, the pier with loads at portal girder top is modelled in STAAD. The analysis is presented in APPENDIX-F.
From the analysis, the time period obtained in longitudinal & transverse direction are as follows :
Time period in longitudinal direction = 0.37 sec => Sa/g = 2.50
Time period in transverse direction = 0.55 sec => Sa/g = 2.50
The slab is resting on beam in longitudinal directon on North side and simply resting on existing retaining wall .
The vertical load from slab will be tranferred to both ends. i.e. on Longitudinal beam on North side and retaining wall.
But the lateral forces will be resisted by beam (B2) on north side.
Additional Dead load on pier top = = 10 kN/m
Additional SIDL (due to wearing coat) on pier top = = 2 kN/m
6.4.4.1 Lateral Load summary due to Earthquake in both Longitudinal Direction & Transverse direction : -
404
3 10
304
804
2 9 403
6
204 704
303
8 5 803
1
402
23 30
11 104 604 703
203
7 4 302
22 29 802
26
103 12 504 603
202 702
28 25 301
21
503
102 602 701
Y 27 24
201
X
Z 101 502 601
501
Load 0
Bending
Sr Load Shear Force
Beam No. Location Moment Reference
No. Case (kN)
(kNm)
1) Road Level Beam (B1) Staad Member No. '1'
TOP @ Support LC106 456 818 App - G Pg No. 217
Live Load 532 667 App - B Pg No. 74
Total 988 1485
BOTTOM @ Midspan LC106 407 594 App - G Pg No. 207
Live Load 246 923 App - B Pg No. 64
Total 653 1517
2) Road Level Beam (B2) Staad Member No. '4'
TOP @ Support LC102 792 1369 App - G Pg No. 219
Live Load 532 667 App - B Pg No. 73
Total 1324 2036
BOTTOM @ Midspan LC106 405 939 App - G Pg No.
No 207
Live Load 246 923 App - B Pg No. 63
Total 651 1862
3) Road Level Beam (B3) Staad Member No. '7'
TOP @ Support LC103 240 403 App - G Pg No. 220
BOTTOM @ Support LC103 76 464 App - G Pg No. 219
10.0 Summary :
Ties
confining reinforcement Y12 @ 100 c/c
Non confining zone reinf. Y10 @ 200 c/c
Ref: DRG:18.DJ.11105.R0
Ref:- DRG:18 DJ 11105 R0 COLUMN REINFORCEMENT DETAIL FOR LP1 to LP4
LP4.
Plinth level beam & Road Level beam are deisgned taking maximum moment and maximum
shear force at face of support and midspan.
The section is check for flexure, shear and torsion as per IRC 21:2000.
Pli th Beam
Plinth B :-
Beam GB 1
Beam Size : - 750 mm x 900 mm
Top Reinf :- 5 Nos. Y 28 Bar
Bottom Reinf :- 5 Nos. Y 32 Bar
Stirrups :- 4 Legs Y 10 @ 150 c/c
Beam GB 2
Beam Size : - 750 mm x 900 mm
Top Reinf :- 5 Nos. Y 28 Bar
Bottom Reinf :- 5 Nos. Y 28 Bar
Stirrups :- 4 Legs Y 10 @ 150 c/c
Beam GB 3
Beam Size : - 750 mm x 750 mm
T Reinf
Top R i f :- 5N
Nos. Y 28 Bar
B
Bottom Reinf :- 5 Nos. Y 28 Bar
Stirrups :- 4 Legs Y 10 @ 150 c/c
APPENDIX –A
DEAD LOAD ANALYSIS
31 of 226
Dead load and SIDL forces on Road level Longitudinal beam for 2-LANE Cast in situ deck are calculated by model of
6.38m - 3.82m spans (Ref:FIG:A2) in STAAD Pro Software.
2
DL on beam top consists of self weight of 450mm thk precast slab = 0.45 x 25 = 11.25 kN/m
TABLE NO A1
6.38 3.82
B1 B2 RE
Wall
DL (kN/m) 29 76 10 Ref:-FIG:A3
SIDL (kN/m) 6 16 2 Ref:-FIG:A4
By Date20-Feb-12 Chd
1 2 3 4
6.38m 3.82m
Y
Z X
Load 2
By Date20-Feb-12 Chd
1 2 3 4
Y
Z X Y = 29.128 kN Y = 75.517 kN
Y = 10.162 kN
Load 1
By Date20-Feb-12 Chd
1 2 3 4
Y
Z X Y = 6.038 kN Y = 15.654 kN
Y = 2.106 kN
Load 2
****************************************************
* *
* STAAD.Pro *
* Version 2007 Build 05 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= APR 12, 2012 *
* Time= 16:50: 8 *
* *
* USER ID: *
****************************************************
P R O B L E M S T A T I S T I C S
-----------------------------------
NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS = 4/ 3/ 3
39. FINISH
APPENDIX –B
LIVE LOAD ANALYSIS
40 of 226
The axle load in STAAD are converted into ‘kN’ and Multiplied by the Respective values of
impact factor as per IRC:6-2000/Cl.211.2 and IRC:6-2000/Cl.211.3 (b) (I)
Moving Load is define using an external file IRCLOAD1
IRCLOAD1
IRC70R
17 17 17 17 12 12 8
1.37 3.05 1.37 2.13 1.52 3.96
IRCA (DEFINITION OF MOVING LOAD FILE IRCLOAD1)
2.7 2.7 11.4 11.4 6.8 6.8 6.8 6.8
1.1 3.2 1.2 4.3 3 3 3
IRC70T
17.5 17.5 17.5 17.5
1.1425 1.1425 1.1425
1 Lane Class - A
(kN) 412 (LC454) 412 (LC396) 394 (LC495) 337 (LC441) Ref:-FIG:B11 to 14
2 Lane Class - A
(kN) 824 (LC454) 824 (LC396) 788 (LC495) 674 (LC441) Ref:-FIG:B11 to 14
1 Lane Class -
70R(W) - (kN) 880 (LC24) 942 (LC40) 909 (LC147) 633 (LC166) Ref:-FIG:B3 to 6
1 Lane Class -
70R(T) - (kN) 794 (LC204) 723 (LC226) 719 (LC247) 685 (LC264) Ref:-FIG:B7 to 10
TABLE NO B2 : MAXIMUM LONGITUDINAL MOMENT DUE TO LL AT PILECAP TOP LEVEL (REF FIG B: 15)
1 Lane Class - A
(kN) 69 (LC390) 65 (LC411) 72 (LC431) 64 (LC435) Ref:-Staad output
2 Lane Class - A
(kN) 138 (LC390) 130 (LC411) 144 (LC431) 128 (LC435) Ref:-Staad output
1 Lane Class -
70R(W) - (kN) 169 (LC31) 172 (LC30) 138 (LC73) 125 (LC73) Ref:-Staad output
1 Lane Class -
70R(T) - (kN) 180 (LC215) 195 (LC215) 159 (LC326) 145 (LC326) Ref:-Staad output
TABLE NO B3 : MAXIMUM LONGITUDINAL MOMENT DUE TO LL AT ROAD LEVEL BEAM BOTTOM LEVEL (REF FIG: B15)
1 Lane Class - A
(kN) 174 (LC467) 131 (LC488) 125 (LC431) 158 (LC434) Ref:-Staad output
2 Lane Class - A
(kN) 348 (LC467) 262 (LC488) 250 (LC431) 316 (LC434) Ref:-Staad output
1 Lane Class -
70R(W) - (kN) 420 (LC118) 309 (LC117) 260 (LC73) 297 (LC73) Ref:-Staad output
1 Lane Class -
70R(T) - (kN) 454 (LC214) 365 (LC217) 306 (LC308) 357 (LC258) Ref:-Staad output
By Date17-Feb-12 Chd
1 2 3 4 5 6
2.47m 20 10.50m 30 10.50m 40 9.07m 50 1.25m
6.53m
21 31 41 51
Y
Z X 22 32 42 52
Load 441
By Date17-Feb-12 Chd
Y
Z X
Y = 879.552 kN Y = 374.818 kN Y = -31.081 kN Y = 2.711 kN
MAXIMUM REACTION @ PILECAP FOR COLUMN LP4 UNDER 70R WHEELED VEHICLE Load 24
By Date17-Feb-12 Chd
Y
Z X Y = 124.436 kN Y = 938.953 kN Y = 177.855 kN Y = -15.244 kN
Load 40
MAXIMUM REACTION @ PILECAP FOR COLUMN LP3 UNDER 70R WHEELED VEHICLE
By Date17-Feb-12 Chd
Y
Z X Y = -18.541 kN Y = 186.946 kN Y = 906.214 kN Y = 151.381 kN
Load 147
MAXIMUM REACTION @ PILECAP FOR COLUMN LP2 UNDER 70R WHEELED VEHICLE
By Date17-Feb-12 Chd
Y
Z X Y = 4.620 kN Y = -25.966 kN Y = 221.876 kN Y = 633.150 kN
Load 166
MAXIMUM REACTION @ PILECAP FOR COLUMN LP1 UNDER 70R WHEELED VEHICLE
By Date17-Feb-12 Chd
Y
Z X Y = 792.818 kN Y = -37.324 kN Y = 9.347 kN Y = -9.471 kN
Load 204
MAXIMUM REACTION @ PILECAP FOR COLUMN LP4 UNDER 70R TRACKED VEHICLE
By Date17-Feb-12 Chd
Y
Z X Y = 23.223 kN Y = 722.478 kN Y = 11.742 kN Y = -2.073 kN
Load 226
MAXIMUM REACTION @ PILECAP FOR COLUMN LP3 UNDER 70R TRACKED VEHICLE
By Date17-Feb-12 Chd
Y
Z X Y = -3.506 kN Y = 30.430 kN Y = 718.170 kN Y = 10.276 kN
Load 247
MAXIMUM REACTION @ PILECAP FOR COLUMN LP2 UNDER 70R TRACKED VEHICLE
By Date17-Feb-12 Chd
Y
Z X Y = 3.144 kN Y = -11.686 kN Y = 78.995 kN Y = 684.917 kN
MAXIMUM REACTION @ PILECAP FOR COLUMN LP1 UNDER 70R TRACKED VEHICLE Load 264
By Date17-Feb-12 Chd
Y
Z X Y = 411.956 kN Y = 213.087 kN Y = 4.163 kN Y = -5.306 kN
Load 454
MAXIMUM REACTION @ PILECAP FOR COLUMN LP4 UNDER 1 LANE CLASS A VEHICLE
By Date17-Feb-12 Chd
Y
Z X Y = 79.462 kN Y = 410.852 kN Y = 204.825 kN Y = -3.858 kN
Load 396
MAXIMUM REACTION @ PILECAP FOR COLUMN LP3 UNDER 1 LANE CLASS A VEHICLE
By Date17-Feb-12 Chd
Y
Z X Y = -7.695 kN Y = 90.134 kN Y = 393.235 kN Y = 130.757 kN
Load 495
MAXIMUM REACTION @ PILECAP FOR COLUMN LP2 UNDER 1 LANE CLASS A VEHICLE
By Date17-Feb-12 Chd
Y
Z X Y = 183.083 kN Y = 76.849 kN Y = 9.271 kN Y = 337.228 kN
MAXIMUM REACTION @ PILECAP FOR COLUMN LP1 UNDER 1 LANE CLASS A VEHICLE Load 441
By Date17-Feb-12 Chd
Y
Z X
****************************************************
* *
* STAAD.Pro *
* Version 2007 Build 05 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= APR 10, 2012 *
* Time= 23: 5:42 *
* *
* USER ID: *
****************************************************
P R O B L E M S T A T I S T I C S
-----------------------------------
96. ***CLASS-A
97. LOAD LIST 351 TO 535
98. PRINT MAXFORCE ENVELOPE LIST 1 TO 5 20 30 40 50
106. FINISH
APPENDIX –C
PILE CAPACITY CALCULATION
76 of 226
BORE HOLE DATA
77 of 226
TEST - REPORT
S O IL IN V EST I G A T IO N N EA R RP3 , L P5 2 ,
L P5 6 , N RP -1 1 1 , W 3 B , W5 A &
N R P-1 0 9 AT A JME R P ULIY A UN D ER
PA S S , J A I P U R & P 2 0 C A T A M A N I S A H
NA L A , J A I P U R ( R A J A S T H A N )
CUSTOMER
ITD-ITD-CEM JV
PROGRAMME
From
CEG TEST HOUSE AND RESEARCH CENTRE PVT. LTD. SR NO. 38_11-12
-------------------------------------------------------------------------------------------------------------------------------------
CONTENTS
Items
S. No. Page
1. Introduction 3
3. Scope of Work 3
5. Field Investigation 5
9. Conclusions 9
10. Recommendations 9
1
79 of 226
CEG TEST HOUSE AND RESEARCH CENTRE PVT. LTD. SR NO. 38_11-12
-------------------------------------------------------------------------------------------------------------------------------------
‘N’ Value observation and strata
8. Fig.-2(b) 17
information for BH-15 (LP52)
‘N’ Value observation and strata
9. Fig.-2(c) 18
information for BH-16 (LP56)
‘N’ Value observation and strata
10. Fig.-2(d) 19
information for BH-17 (NRP-111)
‘N’ Value observation and strata
11. Fig.-2(e) 20
information for BH-18 (W3B)
‘N’ Value observation and strata
12. Fig.-2(f) 21
information for BH-19 (W5A)
‘N’ Value observation and strata
13. Fig.-2(g) 22
information for BH-20 (NRP-109)
‘N’ Value observation and strata
14. Fig.-2(h) 23
information for BH-21 (P20C)
Field & Laboratory Test Results BH-14 to
15. Table-1 to 8 24-31
BH-21
17. Pile Load Carrying Capacity for BH-20 Annexure –II 34-35
18. Pile Load Carrying Capacity for BH-21 Annexure –III 36-37
Annexure-
19. Shear Calculation 38-47
IV(a) to VIII(a)
Annexure-
20. Settlement Calculation 48-52
IV(b) to VIII(b)
2
80 of 226
CEG TEST HOUSE AND RESEARCH CENTRE PVT. LTD. SR NO. 38_11-12
-------------------------------------------------------------------------------------------------------------------------------------
1. INTRODUCTION
The Location of Boreholes for the proposed Metro Rail Project site is
situated Near RP3, LP52, LP56, NRP-111, W3B, W5A, NRP-109 at
Ajmer Puliya Under Pass, Jaipur & P20C at Amani Sah Nala, Jaipur
(Rajasthan).
Fig. 01(a) to Fig. 01(f) shows the locations of the boreholes during field
investigation.
3. SCOPE OF WORK
(b) To obtain and interpret the relevant soil parameter for safe and
economical design of foundations for the proposed construction
and
3
81 of 226
CEG TEST HOUSE AND RESEARCH CENTRE PVT LTD. SR NO. 38_11-12-
------------------------------------------------------------------------------------------------------------------------------------
4. SOIL EXPLORATION PLAN
(i) Boreholes were proposed to be driven to a depth not lesser than the
depth of zone of influence of the foundation below ground level with
the help of standard equipment.
• Grain size distribution for fine and coarse grained fraction of the
soil.
(v) The data thus obtained were to be analyzed for obtaining the allowable
bearing pressure at various depths.
4
82 of 226
CEG TEST HOUSE AND RESEARCH CENTRE PVT LTD. SR NO. 38_11-12-
------------------------------------------------------------------------------------------------------------------------------------
5. FIELD INVESTIGATIONS
Borehole
6. LABORATORY TESTS
5
83 of 226
CEG TEST HOUSE AND RESEARCH CENTRE PVT LTD. SR NO. 38_11-12-
------------------------------------------------------------------------------------------------------------------------------------
• Shear strength • -
• Grain size distribution • Grain size distribution
• Plastic limit and liquid • Plastic limit and liquid
limit limit
• Specific Gravity • -
• pH Values, Sulphates and
• -
Chlorides of Soil
The salient features of the soil strata at different boreholes as inferred from
field and laboratory tests are indicated below:
6
84 of 226
CEG TEST HOUSE AND RESEARCH CENTRE PVT LTD. SR NO. 38_11-12-
------------------------------------------------------------------------------------------------------------------------------------
21.00 - 22.50 Silty Sand Very Dense
22.50 - 27.50 Silty Sand with Gravels Very Dense
0.00 - 1.50 Filled up material Loose
1.50 - 4.50 Fine Sand Medium Dense
BH-18 (W3B)
4.50 - 9.00 Silty Sand Medium Dense
(Table -5 and
9.00 - 10.50 Silty Sand Dense
Fig. 2(e) ) 10.50 - 11.00 Fine Sand Dense
At 11.00 Silty Sand Dense
0.00 - 1.50 Filled up Material Loose
BH-19 (W5A)
1.50 - 6.50 Fine Sand Medium Dense
(Table -6 and
Fig. 2(f) ) 6.50 - 11.00 Fine Sand Dense
The pH value of the soil samples collected from boreholes is varying from
7.81 to 9.00 which is within the range of permissible limit. The sulphate and
chloride content of soil are less than 0.005 %.
WATER TABLE
Water table was not encountered during the field investigation.
8. ALLOWABLE BEARING PRESSURE
Allowable bearing pressure is the minimum of the safe net bearing capacity
(determined from considerations of shear failure) and safe bearing pressure
(determined from considerations of permissible settlement).
7
85 of 226
CEG TEST HOUSE AND RESEARCH CENTRE PVT LTD. SR NO. 38_11-12-
------------------------------------------------------------------------------------------------------------------------------------
capacity using shear failure criterion as per IS:6403-1981 for checking
the safety of the foundations against shear failure.
The Axial load carrying capacity of Pile is determined as per IRC- 78: 2000
appendix-5. The safe load carrying capacity of piles has been worked out on
as per clause 709.3.2 of IRC 78: 2000. The final design of pile foundations, the
conducting actual initial load tests on these piles caste in the respective area.
8
86 of 226
CEG TEST HOUSE AND RESEARCH CENTRE PVT LTD. SR NO. 38_11-12-
------------------------------------------------------------------------------------------------------------------------------------
Pile Load
Pile Pile Length in mtr
Carrying
BH. NO. Diameter (Below 2.50m
Capacity in
in mtr cutoff level)
Tonne
9. CONCLUSIONS
• The soil is predominantly Loose to very dense having non plastic
nature.
• Rock was not encountered during the field investigation.
• pH of soil is within the safe limit for construction purpose.
• Sulphate and chloride contents of Soil are within the safe limits for
construction purpose.
10. RECOMMENDATIONS
• Under the given conditions, an open foundation is
recommended for boreholes BH-14, BH-15, BH-16, BH-18 and
BH-19 as shown in Table-A. The depth of foundation can be
chosen depending upon the allowable bearing pressure.
• Under the given conditions, pile foundation considering length
of 26.00 mtr for borehole BH-17 and 25.00 mtr for borehole BH-
20 & BH-21 is recommended below cut off level.
9
87 of 226
12
88 of 226
19
TABLE-4 : LABORATORY TEST RESULTS SHOWING SOIL CHARACTERISTICS OF BH-17
Date of Testing BH. No. Depth of Water Table Termination Depth Ref. Code
Filled Up Meterial
0.00 - - - - #VALUE! - - - - - - - - - - - - - -
Boulders & Gravels and Soil
1.50 14 1.41 19.74 Silty Sand 0.00 7.46 91.75 0.39 0.11 0.29 0.00 25 Nil Np - - - - - -
3.00 UDS - 25.00 Silty Sand 0.00 7.98 89.61 1.28 0.73 0.40 0.00 24 Nil Np 1.94 13.73 1.71 2.68 0.00 28.00
4.50 16 1.05 16.80 Silty Sand 0.00 15.38 82.97 0.83 0.60 0.22 0.00 25 Nil Np - - - - -
6.00 UDS - - Silty Sand 0.00 11.27 86.09 1.08 0.63 0.93 0.00 22 Nil Np 1.92 14.44 1.68 2.70 0.00 29.00
7.50 25 0.88 22.00 Silty Sand 0.00 9.20 89.49 0.87 0.00 0.44 0.00 24 Nil Np - - - - - -
9.00 UDS - - Silty Sand 0.00 6.25 91.64 1.20 0.39 0.52 0.00 24 Nil Np 2.03 11.52 1.82 2.68 0.00 28.00
10.50 44 0.75 33.00 Silty Sand 0.00 14.45 84.31 0.76 0.23 0.25 0.00 26 Nil Np - - - - -
27
12.00 UDS - - Silty Sand 0.00 5.30 94.28 0.24 0.18 0.00 0.00 25 Nil Np 1.89 11.43 1.70 2.69 0.00 28.00
13.50 69 0.71 48.99 Silty Sand 0.00 8.80 90.69 0.37 0.14 0.00 0.00 23 Nil Np - - - - - -
15.00 - - - Silty Sand 0.00 16.14 83.07 0.41 0.18 0.20 0.00 25 Nil Np - - - - - -
16.50 74 0.64 47.36 Silty Sand 0.00 37.09 59.54 1.90 0.91 0.56 0.00 24 Nil Np - - - - - -
18.00 56 0.61 34.16 Silty Sand with Clay 8.75 22.23 67.64 0.95 0.32 0.11 0.00 25 18 7 - - - - - -
19.50 62 0.58 35.96 Silty Sand with Clay 7.68 19.71 71.45 0.81 0.29 0.06 0.00 23 17 6 - - - - - -
21.00 67 0.56 37.52 Silty Sand 0.00 6.57 92.26 1.08 0.09 0.00 0.00 21 Nil Np - - - - - -
22.50 71 0.54 38.34 Silty Sand with Gravels 0.00 12.13 36.34 2.65 0.76 48.12 0.00 22 Nil Np - - - - - -
24.00 73 0.51 37.23 Silty Sand with Gravels 0.00 38.96 47.75 1.64 0.61 10.55 0.49 24 Nil Np - - - - - -
25.50 75 0.49 36.75 Silty Sand with Gravels 0.00 12.21 74.17 3.14 1.16 2.47 6.85 23 Nil Np - - - - - -
27.50 80 0.47 37.60 Silty Sand with Gravels 0.00 18.48 68.39 2.06 1.02 1.94 8.11 26 Nil Np - - - - - -
89 of 226
90 of 226
ANNEXURE-I
δ Angle of wall friction between pile and soil (may be taken equal to φ)
α Reduction factor depends upon type of pile and SPT value (Table 25 IS:2911)
32
91 of 226
ANNEXURE-I
∑= 871.35 ∑= 1.98
33
92 of 226
APPENDIX –C1
CAPACITY
93 of 226
Appendix - C-1
C-1 Calculation of Vertical compression load carrying capacity of pile : BH- 17 (Near NRP111)
for Pile of LP1 to LP4 Towards retaining wall side :
Pile capacity is calculated as per IS:2911-1979 (Part1/Sec 2) & as per Geotechnical investigation
report prepared by “CEG Test House, Jaipur"
As per the report, GWT is not observed at BH-13 at this location. However, for pile capacity calculation
GWT is considered as 20m below GL
Effective unit wt. of soil is considered as 1.68 T/m^3
Pile Data :
Pile dia 1m area 0.7854 m2
Cut off below ground 2.0 m Perimeter 3.1416 m2
Ground Water Table 20.0 m Inertia 0.0491 m4
At toe C= 0.00 kg/cm2 28 Nc= 9.00 Nq= 15.3 Nr= 17.8
0.8 t/m3 Pde @ 15 m 26.77 t/m2 K = 1
Layer Layer SPT C Pd Pdi K*Pdi*tan *Asi
no thickness kg/cm2
0.0
1 1.5 0.0 5 0 0.4 28 1.94 0.00
2 2.0 0.5 9 0 0.3 28 1.94 0.00 0.00 0.00
3 4.5 2.5 19 0 0.3 28 1.94 4.85 4.85 10.13
4 6.0 1.5 24 0 0.3 28 1.94 2.91 7.76 15.80
5 7.5 1.5 32 0 0.3 28 1.94 2.91 10.67 23.09
6 10.5 3.0 40 0 0.3 28 1.94 5.82 16.49 68.05
7 12.0 1.5 47 0 0.3 28 1.94 2.91 19.40 44.96
8 13.5 1.5 66 0 0.3 28 1.94 2.91 22.31 52.25
9 15.8 2.3 80 0 0.3 28 1.94 4.46 26.77 94.29
10 17.0 1.2 0 0.3 28 1.94 0.00 26.77 53.66
11 18.0 1.0 0 0.3 28 1.94 0.00 26.77 44.72
12 19 0
19.0 10
1.0 0 03
0.3 28 1 94
1.94 0 00
0.00 26 77 44.72
26.77 44 72
13 20.0 1.0 0 0.3 28 0.94 0.00 26.77 44.72
14 21.0 1.0 0 0.3 28 0.94 0.00 26.77 44.72
15 22.0 1.0 0 0.3 28 0.94 0.00 26.77 44.72
16 23.0 1.0 0 0.3 28 0.94 0.00 26.77 44.72
17 24.0 1.0 0 0.3 28 0.94 0.00 26.77 44.72
18 25.0 1.0 0 0.3 28 0.94 0.00 26.77 44.72
19 26.0 1.0 0 0.3 28 0.94 0.00 26.77 44.72
20 26.0 0.0 0 0.3 28 0.94 0.00 26.77 0.00
21 26.0 0.0 0 0.3 28 0.94 0.00 26.77 0.00
22 26.0 0.0 0 0.3 28 0.94 0.00 26.77 0.00
23 26.0 0.0 0 0.3 28 0.94 0.00 26.77 0.00
24 26.0 0.0 0 0.3 28 0.94 0.00 26.77 0.00
25 26.0 0.0 0 0.3 28 0.94 0.00 26.77 0.00
26 26.0 0.0 90 0 0.3 28 0.94 0.00 26.77 0.00
Qs Total skin friction component 765 MT
Qp End Bearing 328 MT
C-2 Calculation of Vertical compression load carrying capacity of pile : BH- 17 (Near NRP111)
for Pile of LP1 to LP4 Away from retaining wall side :
Pile capacity is calculated as per IS:2911-1979 (Part1/Sec 2) & as per Geotechnical investigation
report prepared by “CEG Test House, Jaipur"
As per the report, GWT is not observed at BH-13 at this location. However, for pile capacity calculation
GWT is considered as 20m below GL
Effective unit wt. of soil is considered as 1.68 T/m^3
Pile Data :
Pile dia 1m area 0.7854 m2
Cut off below ground 2.0 m Perimeter 3.1416 m2
Ground Water Table 20.0 m Inertia 0.0491 m4
At toe C= 0.00 kg/cm2 28 Nc= 9.00 Nq= 15.3 Nr= 17.8
0.8 t/m3 Pde @ 15 m 27.16 t/m2 K = 1
Layer Layer SPT C Pd Pdi K*Pdi*tan *Asi
no thickness kg/cm2
0.0
1 1.6 0.0 5 0 0.4 28 1.94 0.00
2 2.0 0.4 9 0 0.3 28 1.94 0.00 0.00 0.00
3 4.5 2.5 19 0 0.3 28 1.94 4.85 4.85 10.13
4 6.0 1.5 24 0 0.3 28 1.94 2.91 7.76 15.80
5 7.5 1.5 32 0 0.3 28 1.94 2.91 10.67 23.09
6 10.5 3.0 40 0 0.3 28 1.94 5.82 16.49 68.05
7 12.0 1.5 47 0 0.3 28 1.94 2.91 19.40 44.96
8 13.5 1.5 66 0 0.3 28 1.94 2.91 22.31 52.25
9 16.0 2.5 80 0 0.3 28 1.94 4.85 27.16 103.29
10 17.0 1.0 0 0.3 28 1.94 0.00 27.16 45.37
11 17.2 0.2 0 0.3 28 1.94 0.00 27.16 9.07
12 17 5
17.5 03
0.3 0 03
0.3 28 1 94
1.94 0 00
0.00 27 16 13.61
27.16 13 61
13 17.8 0.3 0 0.3 28 0.94 0.00 27.16 13.61
14 18.0 0.2 0 0.3 28 0.94 0.00 27.16 9.07
15 18.3 0.3 0 0.3 28 0.94 0.00 27.16 13.61
16 18.5 0.2 0 0.3 28 0.94 0.00 27.16 9.07
17 20.0 1.5 0 0.3 28 0.94 0.00 27.16 68.05
18 20.0 0.0 0 0.3 28 0.94 0.00 27.16 0.00
19 20.0 0.0 0 0.3 28 0.94 0.00 27.16 0.00
20 20.0 0.0 0 0.3 28 0.94 0.00 27.16 0.00
21 20.0 0.0 0 0.3 28 0.94 0.00 27.16 0.00
22 20.0 0.0 0 0.3 28 0.94 0.00 27.16 0.00
23 20.0 0.0 0 0.3 28 0.94 0.00 27.16 0.00
24 20.0 0.0 0 0.3 28 0.94 0.00 27.16 0.00
25 20.0 0.0 0 0.3 28 0.94 0.00 27.16 0.00
26 20.0 0.0 90 0 0.3 28 0.94 0.00 27.16 0.00
Qs Total skin friction component 499 MT
Qp End Bearing 333 MT
APPENDIX –C2
LATERAL LOAD CAPACITY
96 of 226
APPENDIX-C2
T = 307.9 cm
L1 = 0.000 m (IS 2911/Part I/Sec-2/Ament.3/Appendix-C/Cl.5.5.2) (From Fig -2 of code)
L1/T = 0.0 => Lf /T = 2.2
Depth of fixity below cut-off (Lf ) = 2.2 x 307.9 = 677 = 6.8 m
5 12 EI
Lateral load Capacity Q = 70 kN = 7 MT
Lf 3
APPENDIX-D
COLUMN DESIGN
98 of 226
A P
As Per
IRC:21-2000/Cl.303.1/Table:9
Permissible stress in concrete for grade M-45= 15.00 N/mm2
IRC:21-2000/Cl.303.2/Table:10
Permissible stress in Steel for grade fe-500= 240 N/mm2
As Per
IRC:21-2000/Cl.306.4.3
l
eff
Reduction Coefficient 1.50
100 r
min
r
min = the least readius of gyration.
l
eff = the effective length of column
= the stress reduction factor
As Per
IRC:78-2000 / Cl. 706.1.2
Stress increasing factor for Temperature Combination= 1.10
Stress increasing factor for Seismic Combination= 1.50
PIER designing for LOAD summary @ Road level beam bottom (Mmeber 504) obtained From Cl.7.13
The stresses in material is checked in oasys as per codal permissible stresses provission
Observed Stresses results are tabulated and attached in following pages.
Seismics Loading
Oasys Ld. Concrete stresses Permissible stresses
Load Case
Case
Mpa Mpa
103 3 8 801
8.801 22 50
22.50 Safe
Temperature Loading
Oasys Ld. Concrete stresses Permissible stresses
Load Case
Case
Mpa Mpa
107 7 12.9 16.50 Safe
PIER designing for LOAD summary @ Road level beam bottom (Mmeber 604) obtained From Cl.7.14
The stresses in material is checked in oasys as per codal permissible stresses provission
Observed Stresses results are tabulated and attached in following pages.
Seismics Loading
Oasys Ld. Concrete stresses Permissible stresses
Load Case
Case
Mpa Mpa
103 3 9.018 22.50 Safe
Oasys Ld.
Ld Reinf stresses
Reinf. Permissible stresses
Load Case
Case
Mpa Mpa
103 3 78.84 360.00 Safe
Temperature Loading
Oasys Ld. Concrete stresses Permissible stresses
Load Case
Case
Mpa Mpa
106 6 6.182 16.50 Safe
APPENDIX – D-1
(MEMBER 504 )
102 of 226
Job No. Sheet No. Rev.
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-Col 504-Rd Beam Bot AAM 11-Apr-2012
Key
1.45% reinforcement
Reference Point
Section 1 - Sqr-900x900mm
No Results
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-Col 504-Rd Beam Bot AAM 11-Apr-2012
20.0
15.0
Axial Force [kN] (x 1E3)
10.0
5.00
0
-3000. -2000. -1000. 0 1000. 2000. 3000.
-5.00
-10.0
Moment [kNm]
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-Col 504-Rd Beam Bot AAM 11-Apr-2012
History
Date Time Name Note
Specification
General Specification
Code of Practice BS5400
Country United Kingdom
Bending Axes Biaxial
Section 1 Details
Definition
Name Sqr-900x900mm
Type Concrete
Material C45-m10
Origin Centre
Dimensions
Depth 900.0mm
Width 900.0mm
Section Area 810000.mm2
Reinforcement Area 11780.mm2
Reinforcement 1.454%
Section Nodes
Node Y Z
[mm] [mm]
1 450.0 450.0
2 450.0 -450.0
3 -450.0 -450.0
4 -450.0 450.0
Bars
Bar Y Z Diameter Material Type Pre-stress Pre-stress Appl. loads
Force Strain include/exclude
pre-stress
[mm] [mm] [mm] [kN]
1 -375.3 375.3 25.00 500 Steel
2 375.3 375.3 25.00 500 Steel
3 375.3 -375.3 25.00 500 Steel
4 -375.3 -375.3 25.00 500 Steel
5 -377.5 -250.2 25.00 500 Steel
6 -377.5 -125.1 25.00 500 Steel
7 -377.5 -14.90E-6 25.00 500 Steel
8 -377.5 125.1 25.00 500 Steel
9 -377.5 250.2 25.00 500 Steel
10 -250.2 377.5 25.00 500 Steel
11 -125.1 377.5 25.00 500 Steel
12 -14.90E-6 377.5 25.00 500 Steel
13 125.1 377.5 25.00 500 Steel
14 250.2 377.5 25.00 500 Steel
15 377.5 -250.2 25.00 500 Steel
16 377.5 -125.1 25.00 500 Steel
17 377.5 -14.90E-6 25.00 500 Steel
18 377.5 125.1 25.00 500 Steel
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-Col 504-Rd Beam Bot AAM 11-Apr-2012
Bar Y Z Diameter Material Type Pre-stress Pre-stress Appl. loads
Force Strain include/exclude
pre-stress
[mm] [mm] [mm] [kN]
19 377.5 250.2 25.00 500 Steel
20 -250.2 -377.5 25.00 500 Steel
21 -125.1 -377.5 25.00 500 Steel
22 -14.90E-6 -377.5 25.00 500 Steel
23 125.1 -377.5 25.00 500 Steel
24 250.2 -377.5 25.00 500 Steel
Elastic Properties
Reinforcement Properties
Name 500
fy 500000.kPa
Modulus 200.0E+6kPa
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-Col 504-Rd Beam Bot AAM 11-Apr-2012
Bar Y Z Diameter Material Type Pre-stress Pre-stress Appl. loads
Force Strain include/exclude
pre-stress
[mm] [mm] [mm] [kN]
Partial Safety Factor ms,ULS 1.150
ms,SLS 1.000
Maximum Strain 0.05000[-]
Stress/Strain Curve Fig 2
Loading
Reference Point
All loading acts through the Reference Point.
All strain planes are defined relative to the Reference Point.
Definition Geometric
Centroid
Reference Point Coordinates y 0.0mm
z 0.0mm
Applied loads
Load N Myy Mzz
Case
[kN] [kNm] [kNm]
1 1983. 59.00 757.0
2 1555. 190.0 242.0
3 1675. 453.0 326.0
4 1123. 191.0 35.00
5 1243. 455.0 120.0
6 1488. 22.00 276.0
7 1616. 143.0 923.0
Section 1 Details
1.45% reinforcement in section 1 (Sqr-900x900mm). Check this against code requirements.
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-Col 504-Rd Beam Bot AAM 11-Apr-2012
Case Eff. Centroid N M Mu M/Mu Mcr Note
y z
[mm] [mm] [kN] [kNm] [kNm] [kNm]
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-Col 504-Rd Beam Bot AAM 11-Apr-2012
History
Date Time Name Note
Loading
Reference Point
All loading acts through the Reference Point.
All strain planes are defined relative to the Reference Point.
Definition Geometric
Centroid
Reference Point Coordinates y 0.0mm
z 0.0mm
Applied loads
Load N Myy Mzz
Case
[kN] [kNm] [kNm]
1 1983. 59.00 757.0
2 1555. 190.0 242.0
3 1675. 453.0 326.0
4 1123. 191.0 35.00
5 1243. 455.0 120.0
6 1488. 22.00 276.0
7 1616. 143.0 923.0
Section 1 Details
1.45% reinforcement in section 1 (Sqr-900x900mm). Check this against code requirements.
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-Col 504-Rd Beam Bot AAM 11-Apr-2012
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-Col 504-Rd Beam Bot AAM 11-Apr-2012
History
Date Time Name Note
Loading
Reference Point
All loading acts through the Reference Point.
All strain planes are defined relative to the Reference Point.
Definition Geometric
Centroid
Reference Point Coordinates y 0.0mm
z 0.0mm
Applied loads
Load N Myy Mzz
Case
[kN] [kNm] [kNm]
1 1983. 59.00 757.0
2 1555. 190.0 242.0
3 1675. 453.0 326.0
4 1123. 191.0 35.00
5 1243. 455.0 120.0
6 1488. 22.00 276.0
7 1616. 143.0 923.0
Section 1 Details
1.45% reinforcement in section 1 (Sqr-900x900mm). Check this against code requirements.
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-Col 504-Rd Beam Bot AAM 11-Apr-2012
Case Eff. Centroid N M Mu M/Mu Mcr Note
y z
[mm] [mm] [kN] [kNm] [kNm] [kNm]
Maxima
7 1.006E-6 -1.006E-6 1616. 934.0 2322. 0.4022 222.7
7 1.006E-6 -1.006E-6 1616. 934.0 2322. 0.4022 222.7
7 1.006E-6 -1.006E-6 1616. 934.0 2322. 0.4022 222.7
Minima
6 1.006E-6 -1.006E-6 1488. 276.9 2314. 0.1196 217.5
6 1.006E-6 -1.006E-6 1488. 276.9 2314. 0.1196 217.5
6 1.006E-6 -1.006E-6 1488. 276.9 2314. 0.1196 217.5
$33(1',;±'2
&2/801'(6,*1)25
0$;,080AXIAL FORCE$752$'/9/
%($0%27720
0(0%(56
113 of 226
Job No. Sheet No. Rev.
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-Col 604-Rd Beam Bot AAM 11-Apr-2012
Key
1.45% reinforcement
Reference Point
Section 1 - Sqr-900x900mm
No Results
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-Col 604-Rd Beam Bot AAM 11-Apr-2012
History
Date Time Name Note
Specification
General Specification
Code of Practice BS5400
Country United Kingdom
Bending Axes Biaxial
Section 1 Details
Definition
Name Sqr-900x900mm
Type Concrete
Material C45-m10
Origin Centre
Dimensions
Depth 900.0mm
Width 900.0mm
Section Area 810000.mm2
Reinforcement Area 11780.mm2
Reinforcement 1.454%
Section Nodes
Node Y Z
[mm] [mm]
1 450.0 450.0
2 450.0 -450.0
3 -450.0 -450.0
4 -450.0 450.0
Bars
Bar Y Z Diameter Material Type Pre-stress Pre-stress Appl. loads
Force Strain include/exclude
pre-stress
[mm] [mm] [mm] [kN]
1 -375.3 375.3 25.00 500 Steel
2 375.3 375.3 25.00 500 Steel
3 375.3 -375.3 25.00 500 Steel
4 -375.3 -375.3 25.00 500 Steel
5 -377.5 -250.2 25.00 500 Steel
6 -377.5 -125.1 25.00 500 Steel
7 -377.5 -14.90E-6 25.00 500 Steel
8 -377.5 125.1 25.00 500 Steel
9 -377.5 250.2 25.00 500 Steel
10 -250.2 377.5 25.00 500 Steel
11 -125.1 377.5 25.00 500 Steel
12 -14.90E-6 377.5 25.00 500 Steel
13 125.1 377.5 25.00 500 Steel
14 250.2 377.5 25.00 500 Steel
15 377.5 -250.2 25.00 500 Steel
16 377.5 -125.1 25.00 500 Steel
17 377.5 -14.90E-6 25.00 500 Steel
18 377.5 125.1 25.00 500 Steel
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-Col 604-Rd Beam Bot AAM 11-Apr-2012
Bar Y Z Diameter Material Type Pre-stress Pre-stress Appl. loads
Force Strain include/exclude
pre-stress
[mm] [mm] [mm] [kN]
19 377.5 250.2 25.00 500 Steel
20 -250.2 -377.5 25.00 500 Steel
21 -125.1 -377.5 25.00 500 Steel
22 -14.90E-6 -377.5 25.00 500 Steel
23 125.1 -377.5 25.00 500 Steel
24 250.2 -377.5 25.00 500 Steel
Elastic Properties
Reinforcement Properties
Name 500
fy 500000.kPa
Modulus 200.0E+6kPa
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-Col 604-Rd Beam Bot AAM 11-Apr-2012
Bar Y Z Diameter Material Type Pre-stress Pre-stress Appl. loads
Force Strain include/exclude
pre-stress
[mm] [mm] [mm] [kN]
Partial Safety Factor ms,ULS 1.150
ms,SLS 1.000
Maximum Strain 0.05000[-]
Stress/Strain Curve Fig 2
Loading
Reference Point
All loading acts through the Reference Point.
All strain planes are defined relative to the Reference Point.
Definition Geometric
Centroid
Reference Point Coordinates y 0.0mm
z 0.0mm
Applied loads
Load N Myy Mzz
Case
[kN] [kNm] [kNm]
1 2583. 18.00 465.0
2 2199. 122.0 590.0
3 2291. 356.0 459.0
4 1725. 124.0 371.0
5 1816. 358.0 239.0
6 2170. 57.00 464.0
7 2047. 98.00 337.0
Section 1 Details
1.45% reinforcement in section 1 (Sqr-900x900mm). Check this against code requirements.
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-Col 604-Rd Beam Bot AAM 11-Apr-2012
Case Eff. Centroid N M Mu M/Mu Mcr Note
y z
[mm] [mm] [kN] [kNm] [kNm] [kNm]
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-Col 604-Rd Beam Bot AAM 11-Apr-2012
History
Date Time Name Note
Loading
Reference Point
All loading acts through the Reference Point.
All strain planes are defined relative to the Reference Point.
Definition Geometric
Centroid
Reference Point Coordinates y 0.0mm
z 0.0mm
Applied loads
Load N Myy Mzz
Case
[kN] [kNm] [kNm]
1 2583. 18.00 465.0
2 2199. 122.0 590.0
3 2291. 356.0 459.0
4 1725. 124.0 371.0
5 1816. 358.0 239.0
6 2170. 57.00 464.0
7 2047. 98.00 337.0
Section 1 Details
1.45% reinforcement in section 1 (Sqr-900x900mm). Check this against code requirements.
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-Col 604-Rd Beam Bot AAM 11-Apr-2012
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-Col 604-Rd Beam Bot AAM 11-Apr-2012
History
Date Time Name Note
Loading
Reference Point
All loading acts through the Reference Point.
All strain planes are defined relative to the Reference Point.
Definition Geometric
Centroid
Reference Point Coordinates y 0.0mm
z 0.0mm
Applied loads
Load N Myy Mzz
Case
[kN] [kNm] [kNm]
1 2583. 18.00 465.0
2 2199. 122.0 590.0
3 2291. 356.0 459.0
4 1725. 124.0 371.0
5 1816. 358.0 239.0
6 2170. 57.00 464.0
7 2047. 98.00 337.0
Section 1 Details
1.45% reinforcement in section 1 (Sqr-900x900mm). Check this against code requirements.
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-Col 604-Rd Beam Bot AAM 11-Apr-2012
Case Eff. Centroid N M Mu M/Mu Mcr Note
y z
[mm] [mm] [kN] [kNm] [kNm] [kNm]
Maxima
6 1.006E-6 -1.006E-6 2170. 467.5 2451. 0.1907 306.3
6 1.006E-6 -1.006E-6 2170. 467.5 2451. 0.1907 306.3
6 1.006E-6 -1.006E-6 2170. 467.5 2451. 0.1907 306.3
Minima
7 1.006E-6 -1.006E-6 2047. 351.0 2372. 0.1479 259.8
7 1.006E-6 -1.006E-6 2047. 351.0 2372. 0.1479 259.8
7 1.006E-6 -1.006E-6 2047. 351.0 2372. 0.1479 259.8
APPENDIX –E
PILE DESIGN
123 of 226
Pile is designed in Oasys for Maximum and minimum forces in CL.8.0 for piles.
As Per
IRC:21-2000/Cl.303.1/Table:9
Permissible stress in concrete for grade M-35= 11.67 N/mm2
IRC:21-2000/Cl.303.2/Table:10
Permissible stress in Steel for grade fe-500= 240 N/mm2
S" CONDITION
As Per
IRC:78-2000 / Cl. 706.1.2
Stress increasing factor for wind Combination= 1.10 Mpa
Stress increasing factor for Seismic Combination= 1.50 Mpa
FOR "SLS
permissible stress in concrete and steel will be
SR.NO. COMBINATION CONCRETE STEEL
1 Normal 11.67 240.00
2 Temperature 12.83 264.00
3 Seismic 17.50 360.00
Thus for Pile design, permissible stress in concrete and Steel will be
TABLE:E1
SR.NO. COMBINATION CONCRETE STEEL
1 Normal 11.67 240.00
2 Temperature 12.83 264.00
3 Seismic 17.50 360.00
TABLE:E2
OASYS LOAD PILE LOAD Pmax (kN) M RES (kN/m) REMARKS
FOR NORMAL LOAD
1 101 3116 230
COMBINATION
Seismics Loading
Oasys Ld. Concrete stresses Permissible stresses Safe
Load Case
Case
Mpa Mpa
102 2 5.423
5 423 17.50
17 50
T
Temperature
t Loading
L di
Oasys Ld. Concrete stresses Permissible stresses Safe
Load Case
Case
Mpa Mpa
106 6 5.101 12.83
Seismics Loading
Oasys Ld. Concrete stresses Permissible stresses Safe
Load Case
Case
Mpa Mpa
102 2 4.963 17.50
Oasys
O Ld.
Ld R i f stresses
Reinf. t P
Permissible
i ibl stresses
t S
Safe
f
Load Case
Case
Mpa Mpa
102 2 42.01 360.00
Temperature Loading
Oasys Ld. Concrete stresses Permissible stresses Safe
Load Case
Case
M
Mpa Mpa
M
106 6 6.718 12.83
MAXIMUM FORCE
127 of 226
Job No. Sheet No. Rev.
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-LP1 to LP4-Pile Max AAM 11-Apr-2012
Key
0.64% reinforcement
Reference Point
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-LP1 to LP4-Pile Max AAM 11-Apr-2012
14.0
12.0
Axial Force [kN] (x 1E3)
10.0
8.00
6.00
4.00
2.00
0
-2000. -1500. -1000. -500. 0 500. 1000. 1500. 2000.
-2.00
-4.00
Moment [kNm]
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-LP1 to LP4-Pile Max AAM 11-Apr-2012
History
Date Time Name Note
Specification
General Specification
Code of Practice BS5400
Country United Kingdom
Bending Axes Biaxial
Section 1 Details
Definition
Name CIR- 1.0m Dia
Type Concrete
Material C35-m10
Origin Centre
Dimensions
Diameter 1000.mm
Section Area 785400.mm2
Reinforcement Area 5027.mm2
Reinforcement 0.6400%
Section Nodes
Node Y Z
[mm] [mm]
1 0.0 501.3
2 87.04 493.7
3 171.4 471.0
4 250.6 434.1
5 322.2 384.0
6 384.0 322.2
7 434.1 250.6
8 471.0 171.4
9 493.7 87.04
10 501.3 -44.32E-6
11 493.7 -87.05
12 471.0 -171.4
13 434.1 -250.6
14 384.0 -322.2
15 322.2 -384.0
16 250.6 -434.1
17 171.4 -471.0
18 87.04 -493.7
19 -88.64E-6 -501.3
20 -87.05 -493.7
21 -171.4 -471.0
22 -250.6 -434.1
23 -322.2 -384.0
24 -384.0 -322.2
25 -434.1 -250.6
26 -471.0 -171.4
27 -493.7 -87.04
28 -501.3 133.0E-6
29 -493.7 87.05
30 -471.0 171.4
31 -434.1 250.6
32 -384.0 322.2
33 -322.2 384.0
34 -250.6 434.1
35 -171.4 471.0
36 -87.04 493.7
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-LP1 to LP4-Pile Max AAM 11-Apr-2012
Node Y Z
[mm] [mm]
Bars
Bar Y Z Diameter Material Type Pre-stress Pre-stress Appl. loads
Force Strain include/exclude
pre-stress
[mm] [mm] [mm] [kN]
1 405.0 0.0 20.00 500 Steel
2 374.2 155.0 20.00 500 Steel
3 286.4 286.4 20.00 500 Steel
4 155.0 374.2 20.00 500 Steel
5 40.33E-6 405.0 20.00 500 Steel
6 -155.0 374.2 20.00 500 Steel
7 -286.4 286.4 20.00 500 Steel
8 -374.2 155.0 20.00 500 Steel
9 -405.0 80.66E-6 20.00 500 Steel
10 -374.2 -155.0 20.00 500 Steel
11 -286.4 -286.4 20.00 500 Steel
12 -155.0 -374.2 20.00 500 Steel
13 -38.28E-6 -405.0 20.00 500 Steel
14 155.0 -374.2 20.00 500 Steel
15 286.4 -286.4 20.00 500 Steel
16 374.2 -155.0 20.00 500 Steel
Elastic Properties
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-LP1 to LP4-Pile Max AAM 11-Apr-2012
Bar Y Z Diameter Material Type Pre-stress Pre-stress Appl. loads
Force Strain include/exclude
pre-stress
[mm] [mm] [mm] [kN]
term)
Poisson's Ratio 0.2000
Coeff. Thermal Expansion 12.00E-6/°C
Partial Safety Factor mc,ULS 1.500
mc,SLS 1.000
Maximum Strain 0.003500[-]
ULS Compression Curve Recto-parabolic
ULS Tension Curve No-tension
SLS Compression Curve Linear
SLS Tension Curve No-tension
Aggregate Size 20.00mm
Reinforcement Properties
Name 500
fy 500000.kPa
Modulus 200.0E+6kPa
Partial Safety Factor ms,ULS 1.150
ms,SLS 1.000
Maximum Strain 0.05000[-]
Stress/Strain Curve Fig 2
Loading
Reference Point
All loading acts through the Reference Point.
All strain planes are defined relative to the Reference Point.
Definition Geometric
Centroid
Reference Point Coordinates y 0.0mm
z 0.0mm
Applied loads
Load N Myy Mzz
Case
[kN] [kNm] [kNm]
1 3116. 230.0 0.0
2 2793. 217.0 0.0
3 2974. 192.0 0.0
4 2316. 114.0 0.0
5 2497. 110.0 0.0
6 2723. 192.0 0.0
7 2555. 142.0 0.0
Section 1 Details
0.64% reinforcement in section 1 (CIR- 1.0m Dia). Check this against code requirements.
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-LP1 to LP4-Pile Max AAM 11-Apr-2012
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-LP1 to LP4-Pile Max AAM 11-Apr-2012
History
Date Time Name Note
Loading
Reference Point
All loading acts through the Reference Point.
All strain planes are defined relative to the Reference Point.
Definition Geometric
Centroid
Reference Point Coordinates y 0.0mm
z 0.0mm
Applied loads
Load N Myy Mzz
Case
[kN] [kNm] [kNm]
1 3116. 230.0 0.0
2 2793. 217.0 0.0
3 2974. 192.0 0.0
4 2316. 114.0 0.0
5 2497. 110.0 0.0
6 2723. 192.0 0.0
7 2555. 142.0 0.0
Section 1 Details
0.64% reinforcement in section 1 (CIR- 1.0m Dia). Check this against code requirements.
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-LP1 to LP4-Pile Max AAM 11-Apr-2012
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-LP1 to LP4-Pile Max AAM 11-Apr-2012
History
Date Time Name Note
Loading
Reference Point
All loading acts through the Reference Point.
All strain planes are defined relative to the Reference Point.
Definition Geometric
Centroid
Reference Point Coordinates y 0.0mm
z 0.0mm
Applied loads
Load N Myy Mzz
Case
[kN] [kNm] [kNm]
1 3116. 230.0 0.0
2 2793. 217.0 0.0
3 2974. 192.0 0.0
4 2316. 114.0 0.0
5 2497. 110.0 0.0
6 2723. 192.0 0.0
7 2555. 142.0 0.0
Section 1 Details
0.64% reinforcement in section 1 (CIR- 1.0m Dia). Check this against code requirements.
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-LP1 to LP4-Pile Max AAM 11-Apr-2012
Case Eff. Centroid N M Mu M/Mu Mcr Note
y z
[mm] [mm] [kN] [kNm] [kNm] [kNm]
Maxima
6 467.5E-9 305.9E-9 2723. 192.0 1489. 0.1290 345.3
6 467.5E-9 305.9E-9 2723. 192.0 1489. 0.1290 345.3
6 467.5E-9 305.9E-9 2723. 192.0 1489. 0.1290 345.3
Minima
7 467.5E-9 305.9E-9 2555. 142.0 1462. 0.09713 324.0
7 467.5E-9 305.9E-9 2555. 142.0 1462. 0.09713 324.0
7 467.5E-9 305.9E-9 2555. 142.0 1462. 0.09713 324.0
0,1,080)25&(
138 of 226
Job No. Sheet No. Rev.
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-LP1 to LP4-Pile Min AAM 11-Apr-2012
Key
0.64% reinforcement
Reference Point
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-LP1 to LP4-Pile Min AAM 11-Apr-2012
History
Date Time Name Note
Specification
General Specification
Code of Practice BS5400
Country United Kingdom
Bending Axes Biaxial
Section 1 Details
Definition
Name CIR- 1.0m Dia
Type Concrete
Material C35-m10
Origin Centre
Dimensions
Diameter 1000.mm
Section Area 785400.mm2
Reinforcement Area 5027.mm2
Reinforcement 0.6400%
Section Nodes
Node Y Z
[mm] [mm]
1 0.0 501.3
2 87.04 493.7
3 171.4 471.0
4 250.6 434.1
5 322.2 384.0
6 384.0 322.2
7 434.1 250.6
8 471.0 171.4
9 493.7 87.04
10 501.3 -44.32E-6
11 493.7 -87.05
12 471.0 -171.4
13 434.1 -250.6
14 384.0 -322.2
15 322.2 -384.0
16 250.6 -434.1
17 171.4 -471.0
18 87.04 -493.7
19 -88.64E-6 -501.3
20 -87.05 -493.7
21 -171.4 -471.0
22 -250.6 -434.1
23 -322.2 -384.0
24 -384.0 -322.2
25 -434.1 -250.6
26 -471.0 -171.4
27 -493.7 -87.04
28 -501.3 133.0E-6
29 -493.7 87.05
30 -471.0 171.4
31 -434.1 250.6
32 -384.0 322.2
33 -322.2 384.0
34 -250.6 434.1
35 -171.4 471.0
36 -87.04 493.7
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-LP1 to LP4-Pile Min AAM 11-Apr-2012
Node Y Z
[mm] [mm]
Bars
Bar Y Z Diameter Material Type Pre-stress Pre-stress Appl. loads
Force Strain include/exclude
pre-stress
[mm] [mm] [mm] [kN]
1 405.0 0.0 20.00 500 Steel
2 374.2 155.0 20.00 500 Steel
3 286.4 286.4 20.00 500 Steel
4 155.0 374.2 20.00 500 Steel
5 40.33E-6 405.0 20.00 500 Steel
6 -155.0 374.2 20.00 500 Steel
7 -286.4 286.4 20.00 500 Steel
8 -374.2 155.0 20.00 500 Steel
9 -405.0 80.66E-6 20.00 500 Steel
10 -374.2 -155.0 20.00 500 Steel
11 -286.4 -286.4 20.00 500 Steel
12 -155.0 -374.2 20.00 500 Steel
13 -38.28E-6 -405.0 20.00 500 Steel
14 155.0 -374.2 20.00 500 Steel
15 286.4 -286.4 20.00 500 Steel
16 374.2 -155.0 20.00 500 Steel
Elastic Properties
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-LP1 to LP4-Pile Min AAM 11-Apr-2012
Bar Y Z Diameter Material Type Pre-stress Pre-stress Appl. loads
Force Strain include/exclude
pre-stress
[mm] [mm] [mm] [kN]
term)
Poisson's Ratio 0.2000
Coeff. Thermal Expansion 12.00E-6/°C
Partial Safety Factor mc,ULS 1.500
mc,SLS 1.000
Maximum Strain 0.003500[-]
ULS Compression Curve Recto-parabolic
ULS Tension Curve No-tension
SLS Compression Curve Linear
SLS Tension Curve No-tension
Aggregate Size 20.00mm
Reinforcement Properties
Name 500
fy 500000.kPa
Modulus 200.0E+6kPa
Partial Safety Factor ms,ULS 1.150
ms,SLS 1.000
Maximum Strain 0.05000[-]
Stress/Strain Curve Fig 2
Loading
Reference Point
All loading acts through the Reference Point.
All strain planes are defined relative to the Reference Point.
Definition Geometric
Centroid
Reference Point Coordinates y 0.0mm
z 0.0mm
Applied loads
Load N Myy Mzz
Case
[kN] [kNm] [kNm]
1 1679. 267.0 0.0
2 1154. 305.0 0.0
3 1006. 250.0 0.0
4 839.0 194.0 0.0
5 691.0 142.0 0.0
6 1277. 396.0 0.0
7 1450. 207.0 0.0
Section 1 Details
0.64% reinforcement in section 1 (CIR- 1.0m Dia). Check this against code requirements.
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-LP1 to LP4-Pile Min AAM 11-Apr-2012
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-LP1 to LP4-Pile Min AAM 11-Apr-2012
History
Date Time Name Note
Loading
Reference Point
All loading acts through the Reference Point.
All strain planes are defined relative to the Reference Point.
Definition Geometric
Centroid
Reference Point Coordinates y 0.0mm
z 0.0mm
Applied loads
Load N Myy Mzz
Case
[kN] [kNm] [kNm]
1 1679. 267.0 0.0
2 1154. 305.0 0.0
3 1006. 250.0 0.0
4 839.0 194.0 0.0
5 691.0 142.0 0.0
6 1277. 396.0 0.0
7 1450. 207.0 0.0
Section 1 Details
0.64% reinforcement in section 1 (CIR- 1.0m Dia). Check this against code requirements.
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-LP1 to LP4-Pile Min AAM 11-Apr-2012
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-LP1 to LP4-Pile Min AAM 11-Apr-2012
History
Date Time Name Note
Loading
Reference Point
All loading acts through the Reference Point.
All strain planes are defined relative to the Reference Point.
Definition Geometric
Centroid
Reference Point Coordinates y 0.0mm
z 0.0mm
Applied loads
Load N Myy Mzz
Case
[kN] [kNm] [kNm]
1 1679. 267.0 0.0
2 1154. 305.0 0.0
3 1006. 250.0 0.0
4 839.0 194.0 0.0
5 691.0 142.0 0.0
6 1277. 396.0 0.0
7 1450. 207.0 0.0
Section 1 Details
0.64% reinforcement in section 1 (CIR- 1.0m Dia). Check this against code requirements.
18DJ
DELHI METRO RAIL CORPORATION LTD. Drg. Ref.
JAIPUR METRO RAIL PROJECT
Made by Date Checked
STAGE-1 (JP/EW/C2)-LP1 to LP4-Pile Min AAM 11-Apr-2012
Case Eff. Centroid N M Mu M/Mu Mcr Note
y z
[mm] [mm] [kN] [kNm] [kNm] [kNm]
Maxima
7 467.5E-9 305.9E-9 1450. 207.0 1240. 0.1670 183.9
6 467.5E-9 305.9E-9 1277. 396.0 1199. 0.3304 161.9
7 467.5E-9 305.9E-9 1450. 207.0 1240. 0.1670 183.9
Minima
6 467.5E-9 305.9E-9 1277. 396.0 1199. 0.3304 161.9
7 467.5E-9 305.9E-9 1450. 207.0 1240. 0.1670 183.9
6 467.5E-9 305.9E-9 1277. 396.0 1199. 0.3304 161.9
APPENDIX –F
SUBSTRUCTURE STIFFNESS
CALCULATION
148 of 226
Member no. 101 201 301 401 501 601 701 801 represents the pile, member 102 202 302 402 502 602 702 802 represents
pilecap depth, member 103 203 303 403 503 603 703 803 represents column, member 104 204 304 404 504 604 704 804
represents the half Road level beam depth, member 1 to 10 represents road level beam connecting pier at pier top level and
member 21 to 30 represents plinth beam connecting piers at pilecap top level.
The Soil type considered is medium.
The Time Period and Spectral acceleration Sa/g is calculated as per Dynamic analysis and is done in STAAD only.
The Dead Load and SIDL is applied for finding the time period in Longitudinal direction.
The Dead load, SIDL and Live load is applied for finding the time period in Transverse direction.
APPENDIX F -1
Load 1 (SELF X)
****************************************************
* *
* STAAD.Pro *
* Version 2007 Build 05 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= APR 10, 2012 *
* Time= 8:15:54 *
* *
* USER ID: *
****************************************************
P R O B L E M S T A T I S T I C S
-----------------------------------
The following Frequencies are estimates that were calculated. These are for
information only and will not be used. Remaining values are either above
the cut off mode/freq values or are of low accuracy. To use these
frequencies, rerun with a higher cutoff mode (or mode + freq) value.
CALCULATED FREQUENCIES FOR LOAD CASE 1
NOTE : FOR SOFT STORY CHECKING WRITE "CHECK SOFT STORY" AFTER "SOIL TYPE"
3 594.59 0.00
2 657.06 0.00
1 662.43 0.00
3 594.59 0.00
2 657.06 0.00
1 662.43 0.00
ZPA 0.10197
ZPAFREQ 33.00000
121. FINISH
APPENDIX F -2
Load 1 (SELF Z)
****************************************************
* *
* STAAD.Pro *
* Version 2007 Build 05 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= APR 10, 2012 *
* Time= 8:20:47 *
* *
* USER ID: *
****************************************************
P R O B L E M S T A T I S T I C S
-----------------------------------
The following Frequencies are estimates that were calculated. These are for
information only and will not be used. Remaining values are either above
the cut off mode/freq values or are of low accuracy. To use these
frequencies, rerun with a higher cutoff mode (or mode + freq) value.
CALCULATED FREQUENCIES FOR LOAD CASE 1
NOTE : FOR SOFT STORY CHECKING WRITE "CHECK SOFT STORY" AFTER "SOIL TYPE"
3 0.00 428.76
2 0.00 501.60
1 0.00 513.41
3 0.00 428.76
2 0.00 501.60
1 0.00 513.41
ZPA 0.10197
ZPAFREQ 33.00000
127. FINISH
APPENDIX –G
SUBSTRUCTURE ANALYSIS
166 of 226
The piles & columns & beams are modelled as line element.
Member no. 101 201 301 401 501 601 701 801 represents the pile, member 102 202 302 402 502 602 702 802 represents
pilecap depth, member 103 203 303 403 503 603 703 803 represents column, member 104 204 304 404 504 604 704 804
represents the half Road level beam depth, member 1 to 10 represents road level beam connecting pier at pier top level and
member 21 to 30 represents plinth beam connecting piers at pilecap top level.
Concrete grade M50 for pier & M35 for Piles & pilecap.
Load due to self wt of U-girder/I-girder, SIDL and liveload is applied on the respective nodes and members.
Self wt. of Beams, pier & pile will be calcualted by the software.
The structure with column & mono pile with fixed support at pile fixity level is analysed in 'STAAD-Pro' software.
Load case 2 specify SIDL, which are applied at respective node and member.
Load case 3 specify Live loads (vehicle load) i.e. vertical load including impact factor, braking force when both lane & all
span are loaded. The reaction found in Appendix B and braking force are applied as point load at pier top nodes.
The loads are then combined in Staad file with appropriate load factors for SLS conditions.
404
3 10
304
804
2 9 403
6
204 704
303
8 5 803
1
402
23 30
11 104 604 703
203
7 4 302
22 29 802
26
103 12 504 603
202 702
28 25 301
21
503
102 602 701
Y 27 24
201
X
Z 101 502 601
501
Load 0
Y
X
Z
Y
X
Z
LIVE LOAD
Y
X
Z
EQ LOAD IN
LONGITUDINAL
DIRECTION
Y
X
Z
EQ LOAD IN
TRANSVSERSE
DIRECTION
TEMPERATURE LOAD
****************************************************
* *
* STAAD.Pro *
* Version 2007 Build 05 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= APR 11, 2012 *
* Time= 18:18: 6 *
* *
* USER ID: *
****************************************************
257. * 50% VALUES CONSIDERED BECAUSE OF LONG TERM EFFECT = 36.5 X 50% = 18.25 'C
258. 1 TO 12 TEMP 18.25
260. *SLS LOAD COMBINATION
261. *NORMAL
262. LOAD COMB 101 DL+SIDL+LL
263. 1 1 2 1 3 1
264. *SEISMIC
265. LOAD COMB 102 DL+SIDL+0.5LL+EQL+0.33EQT+SLC
266. 1 1 2 1 3 0.5 6 1 7 0.33 8 1
267. LOAD COMB 103 DL+SIDL+0.5LLA+0.33EQL+EQT+SLC
268. 1 1 2 1 3 0.5 6 0.33 7 1 8 1
269. LOAD COMB 104 DL+SIDL+EQL+0.33EQT+SLC
270. 1 1 2 1 6 1 7 0.33 8 1
271. LOAD COMB 105 DL+SIDL+0.33EQL+EQT+SLC
272. 1 1 2 1 6 0.33 7 1 8 1
273. *TEMPERATURE
274. LOAD COMB 106 DL+SIDL+0.5LL+SLC+TLC
275. 1 1 2 1 3 0.5 8 1 9 1
276. LOAD COMB 107 DL+SIDL+0.5LL-SLC+TLE
277. 1 1 2 1 3 0.5 8 -1 10 1
280. PERFORM ANALYSIS
P R O B L E M S T A T I S T I C S
-----------------------------------
285. PRINT MEMBER FORCE LIST 101 201 301 501 601 701
322. FINISH