Surveillance Report Details: Surveillance On Activity-Dead Mortar, Covers & Curing
Surveillance Report Details: Surveillance On Activity-Dead Mortar, Covers & Curing
Page 1 of 6
Controlling Documents
S. No. Document Rev
1. Tender Documents.
2. Technical Specifications.
3. Various Method Statements
4.
OBSERVATIONS
Positive/
S. Specific Negative/
Description Action required/ taken
No. Location NCR
required
Page 2 of 6
Dead mortar found over PCC bed and for some location
cover not found as per requirement.
Page 3 of 6
Curing observed for newly casted grade slab.
2. Admin
Building Negative
Part-C Do curing in same way for at least 14 days.
Page 4 of 6
Curing work for column is in progress by covering gunny
bags.
.
Do curing in same way for at least 14 days.
Stabling
Shed Grid-
3. E
Positive
TOTAL 03
Page 5 of 6