KIPL/QA/DT/23-24/12/03960
Issue Section Date of Issue Report to NC Type
KIPL-QA 12/19/2023 N119-SAMRAJ ENGINEERING CONTROLS PRIVATE LTD Local
3. KIPL Requirement
Issues
Substitute Parts
Required Qty 01
KIPL comments : Delivery Mode Yes
1. Need CAPA for this issue. Due date
2. Revise the inspection report by adding this point with visual
3. Revise the SOP with visual
GM Dy.Manager Engineer
Refer photos in the next sheet
A.K.Rao Rajesh poomandalam_p
Photo Attached Yes
Responsible section
N119-SAMRAJ ENGINEERING CONTROLS PRIVATE LTD Mandatory Information
Accept KIPL Requirement
Refuse KIPL Requirement
Reason
Fill up the required details and return the same within 7 days from the date of N.C report receipt.
3. Permanent measures
1. Parts correction schedule; On and after shipping.
2. Process Change Supplier;
Due Date KIPL Check
1 Work standard
2 Inspection standard
3 Process Cheek sheet
4 Tool
5 Jig
6 Others;
Pl. append improved standards/ photos wherever applicable.
PROBLEM :
Dimension issue
Dimension issue
Therefore
System
Therefore
Why?
Therefore
Why?
Dimension issue
Why?
Therefore
Process
Why?
Therefore
See the drawing dim they
are imaginged wrongly
As per drawing required
4nos -concentricity & 03
nos -M10*1.5 thread
obsevation :
4nos -concentricity & 03
See the drawing dim they
are imaginged wrongly
As per drawing required
4nos -concentricity & 03
nos -M10*1.5 thread
obsevation :
4nos -concentricity & 03
nos -M10*1.5 thread
Why?
Why?
Inspection
CTQ dimension not
added in checksheet Therefore
Why?
Self inspection skipped
during operation process Therefore
Why?
Why?
Fill up the required details and return the same within 7 days from the date of N.C report receipt.
No
CAPA NO:
first time issue Remarks:
Therefore
Therefore
Why?
Stage -1 drilling
operation
stage-2 operation
sequence changed
Why?
Orientation changed
Therefore
Root cause
Therefore
Why?
Check point not
added in check sheet
Root cause
e of N.C report receipt.