Professional Documents
Culture Documents
Rating : 40 KVA
Service
2
Problem Description
What : Problem 1:- Short Supply of external maunal bypass switch cable.
Problem 2:- In Maual bypass switch, battery postive & negative sticker paste insted of R,Y,B & N.
Problem 3:- .In Battery breaker, 2pole(3pole breaker but in actual 1 pole short) with postive & negative sticker provided inste
negative & centre for centre tap battery bank.
When: In Installation
3 Actions taken on suspected inventory.Sorting Results (Time, Date, Total Number Sorted and Quantity Rejected)
Check all current unit
Sorted Qty : Defect Qty :
30 0 -
ROOT CAUSE
Why Made
Problem 1:- Short Supply of external maunal bypass switch cable.
Why 1:- External bypass required in SO.
Why 2:- Their cables details and qty not reflect in any document.
Why 3:- In drawing their details not mentioned.
Problem 2:- In Maual bypass switch, battery postive & negative sticker paste insted
of R,Y,B & N.
Why 1:- We brought switch box for batteries in which only postive & negative pole required.
Why 2:- For this case we divert our std switch without changes.
Problem 3:-.In Battery breaker, 2pole(3pole breaker but in actual 1 pole short) with
postive & negative sticker provided instead of 3 pole with postive, negative & centre
for centre tap battery bank.
Why 1:- We brought breaker box for batteries in which only postive & negative 2 pole
required. but for centre tap batteries required 3 pole.
Why 2:- We forget to open the short link of one pole and convert into 3pole with proper
stickering.
Root Cause Obtained from Why Why Analysis:
Problem 2:- We not checked physically Switch box to comply their requirments.
Problem 3:- We not checked physically Breaker box to comply their requirments.
Fish Bone
Man Method Material
Permanent
Verification Corrective
Corrective Action
Action
5 1) Service engg closed the issue on site.
2)Awarness traning provided to operater for Problem 2 & 3.
6 NA
Preventive action :
Problem 1:- In Next lot if any extra requirments( i.e manual bypass switch required
externally) then engg team update in basic text with power & control cable
Problem 2 & 3) As per requirment, we open the box and checked physically if required
chnages then change the sticker before dispatch.
Prevention
7 Affected Document
Workmanship Std.
Owner for Update
-
Work Instructions / SOP -
Has the necessary documentation QAP / ML -
been updated?
Process Flow -
Drawing -
Risk Assessment Register -
Closure Statement (Validation)
Closure
8
Closure
8 Above P.A verifed by OQA .
Doc No. QA.FQ.FO03
Rev. No. 0
Email
e insted of R,Y,B & N.
ort) with postive & negative sticker provided instead of 3 pole with postive,
d Quantity Rejected)
Why missed-
Problem 1:- Short Supply of external maunal bypass switch
cable.
Why 1:- External bypass required in SO.
Why 2:- Physicall we not verified the cable requirement with their
length.
Why 3:- In drawing their details not mentioned.
Problem 2:- In Maual bypass switch, battery postive & negative
sticker paste insted of R,Y,B & N.
Why 1:- We divert our std Switch box without changes.
Measurement Environment
Responsible /Target Status