Defect
1 QIC No. Oral complaint informed by Saurabh & Naki san
Qty
2 Problem Description Flash noticed in O Ring 43.5 X 2.3 (91301-K0N-D020-M2
Flash noticed in outer & inner diameter - NG
3 Analysis
Inspection Method & Inspection parameter not enough
No rule defined in procedure for flash projection.
4 Root Cause Analysis
Less awareness of part criticality to Jayashree team.
Occurrence:
1. Flash projection level is included in the deflashing work instruction.
2. Implementing the automatic deflashing process for tear trim mould.
Outflow:
5 Countermeasure 1.OPL is displayed in the visual inspection table.
2.Defect check point (Flash thickness & Flash projection) added in the final inspectio
instruction.
3.Part was twisted by hand from outer to inner side and do the visual inspection for c
areas.
1.For establishing Inspection method, New process, New Development scientific me
Risk assessment / process characteristics study etc. will be followed & Management
done.
2.Daily work Management for Supervisor, Department manager prepared & Manage
will be done on periodic basis.
6 Reoccurrence Prevention 3.Relook into all process for process guarantee & identify gaps as per SQM. Improve
gap points plan will be made.
4.Structured & Layered process audit by management started to capture all process v
gaps.
-M2
work instruction.
ear trim mould.
in parts periodically.
1. Process flow with block diagram – mark with red color where the flash is generated
2. Process wise gap to be identified where the flash generation and the controls on that stage
3. Same as 2 deflashing staging – on the basis of control , why it is not removed , gaps
4. Same as 2 at inspection stage – on the basis of why it is not noticed and control , gaps
5. Mould maintenance activity as per format shared earlier
6. Moulding stage flash addressed or not why
7. Make report for flash thickness and height , as the drawing calls for both
8. Is there any check points available at the molding stage
9. Is loose flash addressed in the process or not , if addressed in which stage
10. Mould bend check report to be added
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Particular Area #1 Area #2 Area #3
Depth of Short fill 0.26 0.32 0.41
Length of short fill 1.83 2.46 5.23
All dimn. are in mm
Slide No.
4
5.1
5.2
5.3
7.1
7.2
9.1
9.2
9.3
11.1
11.2
11.3
11.4
13
14
Open points
Oral complaint to be removed
Have you verified any mould offset , ie guide pin worn out, maintenance of mould is it OK, check
sheet to be made as per the previous RPC check sheet
Add mould pictures in the ppt – to know any damages in the flash groove ( if it is tear trim then why
flash not completely removed by hand
Where is the our inspection report – to be added in the ppt – you shared the work instruction for
flash measurement
Mould maintenance check sheet – this is horizontal deployment of previous RPC issue
Since previous PRC is related to flash and this is also flash we have to check the mould flatness
( bend)
As per our process the flash will generate, but to be controlled thru deflashing and inspection
process.What and why gap in the deflashing process ( explain) where is the simulation study report
Have you defined what is proper, improper deflashing, why it is not differentiated
In drawing the allowable flash thickness and projection are provided, how it is get transformed in
the inspection process, check method – if not why this was not addressed
Do not provide third party name here – is it possible to add the check method here
Why there are few cavities showing you the flash, and rest you are saying zero flash, why you could
not able to maintain the zero flash in few cavities. What is the reason, when it will reach the
alaram limit , how do you monitor the same and detection method
Evidendces for all the countermeasure which has to be closed ( to be filled format)
Do you have DWM sheet , product audit check sheet and the observation you made till now , plan
for the same
Immediate deployment of action for all other parts supplying to HMSI
Status
Completed
Avaialable &
updated
Updated the flash
projection
Tool preventive
maintenance report
attached
Modified &
Updated
Removed &
updated
0.1 - 0.2paise
Yes.
Yes.
Ealrier is wrongly
enter the data. Now
corrected
We have doubt,
Need to update