Tooling Tag system tracker Directions

1. Decide which category current Tool condition to be Ensure and Provide the Tag:
• RED TAG - Used when the mold must be repaire / Cleaning required other tool related issue must provide this tag and Correct the tool within time bound
• BLUE TAG - Used when the mold has repaired / cleaning completed it could be validated by tooling incharge and release to production run

• GREEN TAG - Used when the mold ready to pick-up with all check points are ensure and found ok / After production plan completed Drop with No
issues or has not reached maximum shot count.

2. Open the corresponding worksheet tab.

a. Enter the data whenever your provide the tag system, Red, Blue, Green the reason bhind details need to address in the
tracker has defined following sheet.

b. In Tag number must be provide and track _ Tag no followed in - 0001 it must be followed and traceability for no of tag used
and data history to be back-up
Green Tag Tracking Summary Doc.No :
Rev.No :
Rev Date :
Jayashree Polymers Pvt. Ltd.
Last PicK-up Current shot Mold Mold Verification
S.No Date Tag No. Mold No. P/Number P/Name Drop Date Remarks
Date Count. Staus status

1 ### 0001 1100459 Rubber strap Battery 02.04.2024 09.04.2024 13000 0 OK

Page 2 of 4
Blue Tag Tracking Summary
Jayashree Polymers Pvt. Ltd.
Last PicK-up Current shot Correction Verification
S.No Date Tag No. Mold No. P/Number P/Name Drop Date Corrective Action Taken Completion Date Remarks
Date Count. Command

1 ### 0001 1100459 Rubber strap Battery 02.04.2024 09.04.2024 13000

Page 3 of 4
Red Tag Tracking Summary
Jayashree Polymers Pvt. Ltd.
Last PicK-up Current shot Mold Mold Verification
S.No Date Tag No. Mold No. P/Number P/Name Drop Date Root Cause Correction Plan Target Date Remarks
Date Count. Staus status

1 ### 0001 1100459 Rubber strap Battery 02.04.2024 09.04.2024 13000 1 OK