Professional Documents
Culture Documents
Work Instruction for Hopper
Work Instruction for Hopper
PROCESS
Clean the Hopper without Get the Rawmaterial from Ensure the Hopper dryer
Attach the vaccum pipe
any moisture or foreign the store and fill it in the valve closed if it not close the
with Bucket
particles Bucket valve manually
Switch on the blower for Then Switch on the Hopper. Set the pre-heating
Switch on the Pre-Heating
tranfering the material Red switch for heater and temperature in the panel by
Sensor
from bucket to hopper green switch for fan using pre-heating standard
Machine Photo
ACCEPTED BY :