You are on page 1of 1

DOC NO : JP / HWI /01

MATERIAL LOADING WORK INSTRUCTION FOR HOPPER


REV /DATE : 11.04.2022

PROCESS

Clean the Hopper without Get the Rawmaterial from Ensure the Hopper dryer
Attach the vaccum pipe
any moisture or foreign the store and fill it in the valve closed if it not close the
with Bucket
particles Bucket valve manually

Switch on the blower for Then Switch on the Hopper. Set the pre-heating
Switch on the Pre-Heating
tranfering the material Red switch for heater and temperature in the panel by
Sensor
from bucket to hopper green switch for fan using pre-heating standard

Machine Photo

If temperature reached it Set the Vaccum time in


Set the pre-heating time in
gives visual alarm in the the blower for automatic
the panel by using pre-
hopper the open the hopper sucking from bucket to
heating standard
valve and use the material hopper

BEFORE STARTING THE PROCESS PREPARED BY :


1.Clean the Machine Perfectly
REVIEWED BY :
2. To check the all points in the prventive maintenance check sheet regularly

ACCEPTED BY :