What : Wrong setting-During parameter change value put 100 instead of 1000 in nominal setting. Due to this system rating changed fr
Problem Description
Rated current value & KW value is properly set.
How Many: 1
Mr.Swapnil G
On Site Service engg changed count as per System rating.
3
Actions taken on suspected inventory.Sorting Results (Time, Date, Total Number Sorted and Quantity Rejected)
We cheked all unit on shop floor & dispatched system (advance setting file) after complaint received. Found 1 defect as per recvived
Why 4: Typing error by engineer. Why 3: Advance setting file not compare
Why 5: Why 4:
Fish Bone
Man Method Material Measurement
Root Cause Obtained from Fish Bone:
ROOT CAUSE :
Permanent Corrective
Corrective Action
Corrective Action Responsible /Target
Action
5 1) After rating changed get advance setting of particular system & compare with Master
file(changes done through DC source as discussed with Desgin Team).
2) OQA engg verified the Master file PDF comparison file.
1) Amol G. 23-06-20
2) Suraj S. 23-06-20
3) Test report - Output current need to mention for both rating i.e. 100/120, 250/300kVA, 3)Mukund Gavate/Amol G.
60/80kVA(7K) no tick mark. 4)Mukund Gavate/Amol G.
4) Manual - No tick mark on rating for MSL system
6 Above corrective action stated filled and verified. For current systems only Specification and Engrave name plate stickers will be chang
Preventive action :
Preventive Action Responsible /Target
n
1) All Stickers i.e. Engrave name plate/QR code/Specification Sticker - Remove kVA rating.
1)Atul Gawande - 01-08-20
2)Warranty certificate is now generated from SAP, Remove from Manual & Test report(We
2)Sagar Bari - 01-08-20
provide test reports on demand.)
3)Amol Kulkarni
Prevention
7
Affected Document Owner for Update Completion status
Workmanship Std. Mr.Atul Gawande Open
Work Instructions / SOP Mr.Amol Kulkarni Open
Has the necessary documentation QAP / ML
been updated?
Process Flow
Drawing Mr.Sagar Bari Open
Aspect Impact / HIRA
Risk Assessment Register Mr. Atul Gawande Open
Closure Statement (Validation)
Closure
8 Containtment actions are already taken at site and system made operational and same is working in normal condition , corrective actio
closed as per Target date mentioned above.
QA.FQ.FO03
0
6/11/2020
6/11/2020
6/16/2020
Mr.Amol Kulkarni
Service
Contact No.
em rating changed from 100KVA to 10KVA.
Status
Closed.
Environment
Status
1) Closed
2) Closed
3)Immediate for MSL
4)Immediate for MSL
Status
1 & 2) Open
3) 20-07-20
Date
1-Aug-20
1-Aug-20
1-Aug-20