PROJECT: DMRC PHASE-III, CE10 & 11 Lot-1 ECS & TVS works

QA/QC DEPARTMENT
NON CONFORMANCE REPORT
CONSORTIUM SCTI
& SCTC
REFERENCE # NCR-037 DATE: 14 December,2016

PACKAGE: BMS work Contractor: GEIP


LOCATION :Jama Masjid Work : Cable Termination & Protection
Description of defective works:

Cables are not dessed properly in the cable trays , also the cable tray bends and cable trays itself found missing at some places.Photos are attached
for reference.

Issued by: Feeroz Ahmed


Date : 14 December,2016
Corrective Action:

Cables should be dressed properly inside the cable trays and cable trays and including its bends should be provided at required areas to presrve its
confirmity.

Date :
Preventive Action :

To preserve the confirmity of cables,it should be dressed properly inside the cable trays and should not be left loose, also the cable trays and bends
should always be provided as per cable tray drawing and avoid these type non confirmance in future.

Date :

Approved Approved as Noted Resubmit

QA/QC Comments

QA/QC Manager Signature & Date :


Received by Name & Sign :
Designation/Post :
Company Name :
Date :