You are on page 1of 1

PROJECT TITLE & LOCATION: PROPOSED 2-STOREY RESIDENTIAL BUILDING

DAILY TIMESHEET
Date:__________________ Day:_________________
Status
Activity Time- Signature Activity Time-
No. Name Position A – Absent Time-In Time-In Signature
(A.M.) Out (P.M.) Out
P - Present
1
2 painiting painiting

3 painiting concreting concreting

4. concreting painiting painiting

5. concreting concreting
6.

____________________________
Approved by: Project Engineer
DAILY TIMESHEET
Date:__________________ Day:_________________
Status
Activity Time- Signature Activity Time-
No. Name Position A – Absent Time-In Time-In Signature
(A.M.) Out (P.M.) Out
P - Present
1. Excavation Skim coat

2. painiting Cutting of rsb

3. concreting tiling

4. painiting Steel works Masonry works

5. concreting chb
6. laying

____________________________
Approved by: Project Engineer