PROJECT TITLE & LOCATION: PROPOSED 2-STOREY RESIDENTIAL BUILDING

DAILY TIMESHEET
Date:__________________ Day:_________________
Status
Activity Time- Signature Activity Time-
No. Name Position A – Absent Time-In Time-In Signature
(A.M.) Out (P.M.) Out
P - Present
1
2 painting
3 none painiting
painiting concreting painiti
4.
ng
concreting concre
5.
ting
6. hollowblocks

____________________________
Approved by: Project Engineer
DAILY TIMESHEET
Date:__________________ Day:_________________
Status
Activity Time- Signature Activity Time-
No. Name Position A – Absent Time-In Time-In Signature
(A.M.) Out (P.M.) Out
P - Present
1. Excavation

2.
Skim coat painiti painiti
3.
ng ng
Cutting of rsb Steel works concre Masonry works concre
4.
ting ting
5. tiling chb
6. laying

____________________________
Approved by: Project Engineer