You are on page 1of 27

Region/

S.N Region Dep Section Group Contact Person


Zone

1 HQ P&E O&M power and Air conditonal O&M AC G2 EER

Demeke Mengesha

2 HQ P&E O&M power and Air conditonal O&M AC G2 EER


Demeke Mengesha

3 HQ P&E O&M power and Air conditonal O&M AC G2 EER


Demeke Mengesha

4 HQ P&E O&M power and Air conditonal O&M AC G2 EER

Demeke Mengesha

5 HQ P&E O&M power and Air conditonal O&M AC G2 EER

Demeke Mengesha

HQ P&E O&M power and Air conditonal O&M AC G2 EER

6 Demeke Mengesha

HQ P&E O&M power and Air conditonal O&M AC G2 EER


7 Demeke Mengesha

HQ P&E O&M power and Air conditonal O&M AC G2 CNR

8 Tekalgn Temeselew
HQ P&E O&M power and Air conditonal O&M AC G2 CNR
9 Tekalgn Temeselew
HQ P&E O&M power and Air conditonal O&M AC G2 CNR
10 Tekalgn Temeselew
HQ P&E O&M power and Air conditonal O&M AC G2 CNR
11 Tekalgn Temeselew
HQ P&E O&M power and Air conditonal O&M AC G2 Tolina EAAZ
12

HQ P&E O&M power and Air conditonal O&M AC G2 Tolina EAAZ


13

HQ P&E O&M power and Air conditonal O&M AC G2 Tolina EAAZ


14

HQ P&E O&M power and Air conditonal O&M AC G2 Tolina EAAZ


15

HQ P&E O&M power and Air conditonal O&M AC G2 Tolina EAAZ


16

HQ P&E O&M power and Air conditonal O&M AC G2 Tolina EAAZ


17

HQ P&E O&M power and Air conditonal O&M AC G2 Tolina EAAZ


18

HQ P&E O&M power and Air conditonal O&M AC G2 Berhanu NNWR

19
Site ID Site Name Air Conditioner Model &
Capacity

151007 Denlmat KFR-48W/01TFE, 4.8KW

151001 Ketemalmat KFR-48W/01TFE, 4.8KW

KF-80W/T12SE-N1, 8KW
151421 Togochale KFR-48W/01TFE, 4.8KW

151569 Obasha KFR-48W/01TFE, 4.8KW

151404 Fik KFR-48W/01TFE, 4.8KW

151572 Fafum KFR-48W/01TFE, 4.8KW

151565 Bombas KF-80W/T12SE-N1, 8KW

161044 Mehal meda KFR-48W/01TFE, 4.8KW

161145 Arerti

161149 Meteh bila KFR-48W/01TFE, 4.8KW


CSD91A,9kw
161345 shewarobit tele transmition room
CSU81A,8kw

111092 Mihret church KFR-48W/01TDE, 4.8KW

111409 Summit 2 KFR-48W/01TDE, 4.8KW

111102 Ethio Saudi KFR-48W/01TDE, 4.8KW

111103 CMC Meri KFR-48W/01TDE, 4.8KW

KF-80W/T12SE-N1, 8KW
111086 CMC Tele

KF-80W/T12SE-N1, 8KW
111085 Zerfeshal

111088 Totot

121267 Humera Tele CCD91A,9KW


KFR-48W/01TFE,4.8KW
AC Room
AC Type Temperatu Problems of AC
Quantty re
A/C#1 - Need Transformer ,
loose Power conection and
Hisense 2 24 Need PM
A/C#2 -Need
Compreser start CAP. and PM
A/C#1 - Need, Blower,
drainage hose dropped wtter in
to the rooms and need PM
Hisense 2 24
A/C#1 - Incorect settinig and
need PM
A/C#2-Needpower
A/C#2-Totally PM-
Hisense 2 25 disconected , need codesor fan
CAP. and need PM.

A/C#2- Additonal AC relocated


Hisense 1 24 from Gumbuskare (151419-
Sheknur)

Need new A/C , relocated from


Hisense 1 25 Kurkura (151062)or from west
Emi

A/C#1- Drainage hose problem


and need PM
Hisense 2 25
A/C#2-Need
Compressor

Display module disconected


Hisense 1 24 from controll module and need
PM

Hisense 2 21

36

Hisense 1 21
stulz 2
23

Hisense 21 2

Hisense 20 2

Hisense 22 2

Hisense 21 2

Hisense 20 2

Hisense 20 1

21 2
As you Know Humera
area is very hot and the room has
STULZ many
network equipment in the site
Hisense
two Stulz it needs good capacity air
44 two hisense conditioner
Action Taken Week-14 Challeneges

A/C#1-We change new transformer,Tighten the loose connection or


we conected directly with out soket.Then Set the right temperature
in related to existing actual heat load. Tset=23 oc,Tsup = 7oC , Tret =
22oC, ,Psuc = 6.5bar A/C#2- We
change new start CAP. and PM done.Then Set the right temperature
in related to existing actual heat load. Tset=23 oc,Tsup =9oC , Tret =
A/C#1-We
23oC, ,Psucchange new blower,we fix drainage hose that leaks water
= 6.3bar
into the room and PM done.Then Set the right temperature in related
to existing actual heat load. Tsup14oC,Set T=24oC , Tret=24oC,sup=6
bar,
A/C#1-We adjust corect A/C#2-We doen
setting PM PM only.Then
done.Then Set theSet the right
right
temperature
temperature in related
in related to existing actual heat load. Set T=23 o
C,
to existing actual heat load. Tset=24oc,Tsup =
supT=12 o
C,Tret=22 o
C,sup=6.2bar,
14oC , Tret = 24oC, ,Su p= 7.5bar
We conect power from PDB, CAP.changed and PM done.Then Set
the right temperature in related to existing actual heat load.
Tset=24oc,Tsup = 8oC , Tret = 24oC, ,Psuc = 6 bar.

A/C#2- As I reported early, unit one is maintened and unit two


evaporeter damaged, so instead of unit two we done move(installed)
indoor unit from site 151419(Shehnur) because its compresor
faulty .Then Set the right temperature in related to existing actual
heat load. Tset=24oc,Tsup = 8oC , Tret = 24oC, ,Psuc = 6 bar

We done move indoor and out door unit from site 151062(Kurkura) to
Fik Exchange because new 8kw A/C is instaled in kurkura site.
Then Set the right temperature in related to existing actual heat load.
Tset=24oc,Tsup = 8oC , Tret = 25oC, ,Psuc = 7.3 bar

We fix drainage hose that leaks water into the room and we done
PM.Then Set the right temperature in related to existing actual heat
load. Tset=24oc,Tsup = 11 oC, Tret = 25oC, ,Psuc = 6 bar
A/C#2-Only fault
identified due to lak of spare

We conect display with control card and PM done . Then Set the
right temperature in related to existing actual heat load.
Tset=24oc,Tsup = 10oC , Tret = 23oC, ,suc p= 7.4 bar
AC#1 - Foulty control card changed.Performance of the unit checked;
PM done on Indoor unit, cooling efficency increased.

AC#2 - Performance of the unit checked; PM done on


Indoor unit, cooling efficency increased.

This site need AC,but It has no Air conditioner so room temperature is


high.
AC#1 - Performance of the unit checked; PM done on Indoor unit,
cooling efficency increased.
AC#1 - There were seting problem,comperossor was disactive. Now
the problem is solved.
AC#1 - Comperossor winding short cks.

AC#1-Is functional,dirty air filter cleaned AC#2-


Compressor short ckted.
AC#1- Is Functional, dirty air filter cleaned
AC#2- No control card,Compressor open ckted and power supply
disconnected
AC#1-Is functional,dirty air filter cleaned-
AC#2- Is functional,dirty air filter cleaned
AC#1-Is functional
AC#2- Control card faulty.

AC#1-Is functional,dirty air filter cleaned


AC#1-Is functional,dirty air filter cleaned

AC#1-Is functional,Condensor Leakage and Evaporator Joint leakage


welded
AC#1-Is functional,dirty air filter cleaned,
Stulz/AC#1-expansion
AC#2-Compressor open valve
cktedfaulty

AC#2 IOC card faulty and


Expansion
valve faulty
Hisense/AC#1-compressor overheating
AC#2-Indoor fan motor faulty and Indoor blower
faulty
Week-15 Plan (Next week Plan) Remark

closed

closed

closed

closed

closed

closed

closed

closed

closed

closed
closed

closed

closed

closed

closed

closed

closed

closed

closed
S.N Region Dep Section Group

power and envroment O&M


1 HQ P&E,O&M power and Air conditonal O&M
Group 2

power and envroment O&M


2 HQ P&E,O&M power and envroment O&M
Group 2

power and envroment O&M


3 HQ P&E,O&M power and envroment O&M
Group 2

power and envroment O&M


4 HQ P&E,O&M power and envroment O&M
Group 2

power and envroment O&M


5 HQ P&E,O&M power and envroment O&M
Group 2

power and envroment O&M


6 HQ P&E,O&M power and envroment O&M
Group 2

power and envroment O&M


7 HQ P&E,O&M power and envroment O&M
Group 2

power and envroment O&M


8 HQ P&E,O&M power and envroment O&M
Group 2

power and envroment O&M


9 HQ P&E,O&M power and envroment O&M
Group 2

power and envroment O&M


10 HQ P&E,O&M power and envroment O&M
Group 2

power and envroment O&M


11 HQ P&E,O&M power and envroment O&M
Group 2
power and envroment O&M
12 HQ P&E,O&M power and envroment O&M
Group 2

power and envroment O&M


13 HQ P&E,O&M power and envroment O&M
Group 2

power and envroment O&M


14 HQ P&E,O&M power and envroment O&M
Group 2

power and envroment O&M


15 HQ P&E,O&M power and envroment O&M
Group 2

power and envroment O&M


HQ P&E,O&M power and envroment O&M
16 Group 2
power and envroment O&M
HQ P&E,O&M power and envroment O&M
17 Group 2
power and envroment O&M
HQ P&E,O&M power and envroment O&M
18 Group 2
power and envroment O&M
HQ P&E,O&M power and envroment O&M
19 Group 2
Contact Person Region/Zone Site ID Others

Ayalew WAAZ 111062 Leze sefer

Ayalew & Amanuel SAAZ 167002 Sululta

Balderas
Ayalew & Amanuel NAAZ
Condominium
111006

Melaku SAAZ Ras Biru


111134

Ras mekonen
Melaku NAAZ
bridge
111146

Melaku WAAZ Sheger Menafesha


1111068

Eshetu& Getahun CNR


161011 Sheno

Eshetu& Getahun CNR


Sendafa tele Sendafa tele

Eshetu& Belay CWH CWH CWH

Ashenafi and shenkute EER Jijiga

151417

Ashenafi and shenkute EER kurkura

151062
Ashenafi and shenkute EER Jijiga

151556

EER Hargele

Tesfaye 156011

EER Hargele

Tesfaye 151199

EER Hargele
Tesfaye 151265

EER Hargele
Tesfaye 151200

EER Hargele
Tesfaye 151417

EER Hargele
Tesfaye 151090A

EER Hargele
Tesfaye 151090B
Work Break Down Activity Details

30KVA coelmo AVR problem

50KVA old cummins Under Frequency and injection pump problem

Smart Gen Controle Module, C2002 Actuator and


40KVA ZN-D40S/Benin generator
KH180,YL-120-12,12V-120A DC relay

1#.Power system supervision unit (PSU board) replaced by


new one
DC and Monitoring 2#.CSU display board replaced by new one

Signal Transfer Board (SCB) replaced


DC and Monitoring

CSU display board replaced by new one


DC and Monitoring

ATS Modgule replacement,Contactor type ATS replaced


Cummins 50KVA by motorized AB type ATS

ATS modgule replacement


Cummins 50KVA

Inspaction DC power rectifier cabinat inspaction

as you know this generator hass been replaced by anther


turbo charger but nothing has changed .so this DG big
problem , high oil consmpion problem ,cylinder head valve
seals damage and turbo charger failed! Then after we change
valve seal , we repaired cylinder head ande turbo charger .so
20 kva pramac now DG working properly

over speed problem!! then we repaired and cheked . now DG


30kva pramac working poperly
this DG high oil consmpion and high oil leakge problem!! so
30kva pramac we need a time

monitoring

The power rack alrady changed to ZTE power rack

monitoring

The power rack alrady changed to ZTE hybrid rack

monitoring
The power rack alrady changed to ZTE hybrid rack

monitoring
The power rack alrady changed to ZTE hybrid rack

monitoring
Generator problem

monitoring
port configration problem

monitoring
port configration problem
Budget Used/Cost
Division Objectives UoM Date Begin Date End
Incurred

3/31/2022 3/31/2022

4/5/2022 4/5/2022

4/5/2022 4/7/2022

5/4/2022 5/4/2022

5/4/2022 5/4/2022

6/4/2022 6/4/2022

2/4/2022 2/4/2022

3/4/2022 3/4/2022

5/4/2022 5/4/2022

2/4/2022 2/4/2022

3/4/2022 3/4/2022
5/4/2022 5/4/2022

5/4/2022 5/4/2022

6/4/2022 6/4/2022

2/4/2022 2/4/2022

3/4/2022 3/4/2022

5/4/2022 5/4/2022

2/4/2022 2/4/2022

3/4/2022 3/4/2022
Week-14
Week-14 Challeneges Week-15Plan (Next week Plan)
Achievement

closed

Closed

On progres

closed

closed

closed

closed

closed

On Progres

closed

closed
On progres

closed

closed

closed

closed

closed

closed

closed
Remark

For Inspaction result the following componenets


are not available ;
1.Rectifier/R4875G
2.three phase AC breaker
3.Solar breaker
4.Solar rectifier
Exisiting Huawei ICC power rack changed by ZTE
hybrid power rack b/c of this the site disconnected
from neteco but the ICC rack exsisted still over
there, so we can use it for others.

"

"

"

Need starter battery to use hybrid system