Professional Documents
Culture Documents
Demeke Mengesha
Demeke Mengesha
Demeke Mengesha
6 Demeke Mengesha
8 Tekalgn Temeselew
HQ P&E O&M power and Air conditonal O&M AC G2 CNR
9 Tekalgn Temeselew
HQ P&E O&M power and Air conditonal O&M AC G2 CNR
10 Tekalgn Temeselew
HQ P&E O&M power and Air conditonal O&M AC G2 CNR
11 Tekalgn Temeselew
HQ P&E O&M power and Air conditonal O&M AC G2 Tolina EAAZ
12
19
Site ID Site Name Air Conditioner Model &
Capacity
KF-80W/T12SE-N1, 8KW
151421 Togochale KFR-48W/01TFE, 4.8KW
161145 Arerti
KF-80W/T12SE-N1, 8KW
111086 CMC Tele
KF-80W/T12SE-N1, 8KW
111085 Zerfeshal
111088 Totot
Hisense 2 21
36
Hisense 1 21
stulz 2
23
Hisense 21 2
Hisense 20 2
Hisense 22 2
Hisense 21 2
Hisense 20 2
Hisense 20 1
21 2
As you Know Humera
area is very hot and the room has
STULZ many
network equipment in the site
Hisense
two Stulz it needs good capacity air
44 two hisense conditioner
Action Taken Week-14 Challeneges
We done move indoor and out door unit from site 151062(Kurkura) to
Fik Exchange because new 8kw A/C is instaled in kurkura site.
Then Set the right temperature in related to existing actual heat load.
Tset=24oc,Tsup = 8oC , Tret = 25oC, ,Psuc = 7.3 bar
We fix drainage hose that leaks water into the room and we done
PM.Then Set the right temperature in related to existing actual heat
load. Tset=24oc,Tsup = 11 oC, Tret = 25oC, ,Psuc = 6 bar
A/C#2-Only fault
identified due to lak of spare
We conect display with control card and PM done . Then Set the
right temperature in related to existing actual heat load.
Tset=24oc,Tsup = 10oC , Tret = 23oC, ,suc p= 7.4 bar
AC#1 - Foulty control card changed.Performance of the unit checked;
PM done on Indoor unit, cooling efficency increased.
closed
closed
closed
closed
closed
closed
closed
closed
closed
closed
closed
closed
closed
closed
closed
closed
closed
closed
closed
S.N Region Dep Section Group
Balderas
Ayalew & Amanuel NAAZ
Condominium
111006
Ras mekonen
Melaku NAAZ
bridge
111146
151417
151062
Ashenafi and shenkute EER Jijiga
151556
EER Hargele
Tesfaye 156011
EER Hargele
Tesfaye 151199
EER Hargele
Tesfaye 151265
EER Hargele
Tesfaye 151200
EER Hargele
Tesfaye 151417
EER Hargele
Tesfaye 151090A
EER Hargele
Tesfaye 151090B
Work Break Down Activity Details
monitoring
monitoring
monitoring
The power rack alrady changed to ZTE hybrid rack
monitoring
The power rack alrady changed to ZTE hybrid rack
monitoring
Generator problem
monitoring
port configration problem
monitoring
port configration problem
Budget Used/Cost
Division Objectives UoM Date Begin Date End
Incurred
3/31/2022 3/31/2022
4/5/2022 4/5/2022
4/5/2022 4/7/2022
5/4/2022 5/4/2022
5/4/2022 5/4/2022
6/4/2022 6/4/2022
2/4/2022 2/4/2022
3/4/2022 3/4/2022
5/4/2022 5/4/2022
2/4/2022 2/4/2022
3/4/2022 3/4/2022
5/4/2022 5/4/2022
5/4/2022 5/4/2022
6/4/2022 6/4/2022
2/4/2022 2/4/2022
3/4/2022 3/4/2022
5/4/2022 5/4/2022
2/4/2022 2/4/2022
3/4/2022 3/4/2022
Week-14
Week-14 Challeneges Week-15Plan (Next week Plan)
Achievement
closed
Closed
On progres
closed
closed
closed
closed
closed
On Progres
closed
closed
On progres
closed
closed
closed
closed
closed
closed
closed
Remark
"
"
"