DEPT
2
ELECTRICAL MAINTNENANCE
Performance Indices
PM Adherence : 100%
No. of W.O. raised : 193
No. of RCA raised :0
Unit trip on account of EMD :0
Generation Loss due to Equipment : MU
3
ELECTRICAL MAINTNENANCE
Condition Monitoring
Technique Planned done %
Thermography
-400 kV Switchyard Twice Twice 100 %
MODIFICATIONS
Sl. Problem in Existing
Existing System Implemented Modification U1 U2
No System
6
ELECTRICAL MAINTNENANCE
Highlights
19 Nos. 400KV CTs replacement done at 400 KV switch yard GT 2, Line 1 & Line 2 bays for
reliability improvement
ELECTRICAL MAINTNENANCE
Highlights
BEFORE AFTER
ELECTRICAL MAINTNENANCE
Highlights
1.Maintenance of WRDB-1&2 .
2.Maintenance of Station service board
ELECTRICAL MAINTNENANCE
Low lights
Description Probable reason for Action Taken
tripping/failure
U-2 MDBFP AOP MOTOR U-2 MDBFP AOP MOTOR MDBFP AOP MOTOR Replaced
Tripped in over load. So one from spare motor. Failure
checked found motor over motor bearing replaced and
heated condition. So motor kept in workshop.
decoupled trial taken found
abnormal sound came from
motor.
ELECTRICAL MAINTENANCE
11 0BA
U#2toCWP-B
0BC tie IR value
Motor in range'Y'of&
terminal Dust accumulation noticed on Initial -150 mega
Initial Ohm
-75°C
Cable connector replace
‘B’PHmega
Cableohms
temp high , insulators cleaned the same After work:
After 10 giga
work: 38°C
value reached to Giga Ohms Ohm
2 U-2 MILL 20T HOIST Abnormal Sound Bearings Replaced on DE and 6309ZZC3 and 6309 ZZ
2 Vacuum pump -2B Abnormal, sound Bearings Replaced on DE and
NDE sides 6319 C3 C3
two nos
NDE sides bearings consumed
3 U-2 1C12 HOPPER JB Terminal heat up Relugging -
3 Primary water pump
HEATER Abnormal Sound Bearings Replaced on DE and 6310ZZ C3 and 6210
4 CT fan U#1 – 8, 10A, 10A, 8.8 Giga Ohm Boots replaced on all 6
runs of cables.
5 Filter Backwash pump-C Abnormal sound Bearings Replaced on DE and 6208ZZ and 6207ZZ
NDE sides
6 Submersible Dewatering Abnormal sound Bearings Replaced on DE and 6202ZZ and 6202ZZ
pump NDE sides
ELECTRICAL MAINTNENANCE
Challenges / Concerns
1. Spare GT cleaning & painting .
Before After
2. Old 400kv Ct’s shifted to central store .
3. Two nos of motor shifting trolley fabricated .
Initiatives and Improvements
Sr. Description Status
no.
1 TG hall 17 M elevation in Unit 1 & 2, LED lighting fixtures Completed
installed in place of HPSV as an energy saving initiative
2 LED lighting provided at CW pump house by replacing Completed
conventional HPSV lights as an energy saving project
3 LED lighting provided at WORKSHOP by replacing Completed
conventional HPSV lights as an energy saving project
Way forward
Procurement of DAVR
PR – 50010692 awaited from HO
Electronics Control Card For
Both Unit
Replacement of BHEL Final Technical
DAVR System With ABB Specification awaited from
UniTrol for 600MW. Vendor.
CRITICAL CONCERN
Sr. Activity Detail Status
No.
16
ELECTRICAL MAINTNENANCE
17