100 m3/day
02 of 1Page
RAW WASTEWATER CHARACTERISTICS
PH 8.5 -
Effluent Quality
The treated effluent quality shall meet the requirements of the Egyptian law no.93/62
modifiedbe decree 44/2000 for discharging industrial waste water to public sewer low
limits
Law limit Accepted level
PH 7-9.5 7-9.5
02 of 0Page
Treatment Steps:
02 of 3Page
PROCESS CALCULATIONS:
Process Calculations:
Collection Pit:
Effective Volume: 10 m3
Retention time: 2 hr.
Equalization tank:
Effective Volume: 25 m3
Retention time: 5 hr.
Aeration tanks:
Effective Volume: 100 m3
Retention time: 24 hr.
Chlorination tanks:
Effective Volume: 6 m3
Retention time: 1 hr.
Sludge Holding tank:
Effective Volume: 10 m3
Retention time: 24 hr.
Air blowers for Balancing & sludge holding tanks: 1 on duty + 1 standby 750m3/hr. @ 500 mbar
02 of 4Page
PROCESS DESCRIPTION
PROCESS DESCRIPTION:
Equalization (Balancing):
Wastewater effluent from inlet lifting sump will be pumped to the equalizing tank via inlet lifting
pumps in order to homogenize the wastewater effluent in terms of pollution and hydraulic load
and to gurantee the reliability and stability of the process.
The pH value is adjusted inside the equalizing tank via injecting of an acid or alkali based on the
pH controller feedback signal. The balacing tank is aerated at the bottom through coarse bubble
air diffusers to avoid any anaerobic conditions
02 of 5Page
Aeration tanks:
The chemically treated effluent flows by gravity to the biological treatment stage
The mixture must be agitated to prevent settlement and aerated to supply oxygen for the
respiration of the microorganisms air blowers delivering via an air manifold to fine diffusers
which release the air near the bottom of the aeration tank.
the organic material from the wastewater and multiply it to greater numbers resulting in excess
activated sludge that needs to be occasionaly disposed.
Chlorination tank:
This tank is considered as a balancing tank between the secondary and tertiary treatment stages.
Any harmful bacteria remaining in the treated effluent will be killed through disinfection by
dosing of Sodium Hypochlorite solution with sufficient contact time.
Multimedia filters:
Chlorinated water will be pumped from the chlorination tank to the multimedia filters through
Multimedia filters feed pumps. Multimedia filters will remove suspended solids and reducing the
remaining settable organic loads before entering the activated carbon filters.
The chemical and biological sludge will be collected in the sludge holding tank to be thickened &
stabilized. Bottom sludge in settling tank is pumped to sludge holding tank via RAS/WAS pumps
where RAS portion is recycled to activation zone and WAS portion is pumped to excess sludge
holding tank which is aerated by coarse bubbles air diffusers for further sludge stabilization and
thickening where sludge conditioning takes place by addition of polyelectrolyte to enhance the
efficiency of dewatering process.
Screw press:
A screw press is used for dewatering of sludge to 18-25% solid content. Dewatered sludge will be
packed for final disposal.
02 of 6Page
SCOPE OF WORK AND SUPPLY
-Scope of Work:
02 of 7Page
- Scope of Supply:
02 of 8Page
Exclusions:
02 of 9Page
TECHNICAL SPECIFICATIONS
TECHNICAL SPECIFICATIONS:
Lifting pumps:
Brand Ebara, LOWARA
Type Submersible pump
Capacity & pressure 15 m3/hr. @3 bar
Material of shaft & impeller Stainless steel 304
Material of impeller Cast Iron
Power 1 kw
Origin Europe
Qty. (1 duty/1 standby)
Balancing Tank
CONSTRUCTION CONCRETE TANK
VOLUME 25 m3
Inlet 1st pumping station
Outlet 2ND pumping station
Retention time 6 hours
02 of 12Page
Dissolved air flotation Unit:
Material of construction Steel 304l
Dimension 3.5 m * 2.1 m * 2.6 m (L*W*H)
Inlet/outlet size 3 inches
Sludge volume 800 liters
Sludge outlet size 3 inches
Flotation Rate 0.5m3/hr. up to 0.6 m3/hr.
Origin Local
Qty One
02 of 11Page
Pipe Flocculator
Dimension 2000 cm * 60 cm * 80 cm
flow rate 6.5m3/ hr.
Flange size/diameter 2 inch/2 inch
Total length of tube 30:40 m
No of levels 6
Material Body: Stainless Steel 304
Frame: Stainless Steel 304
DAF Recycle
pump:
Brand Ebara , Lowara
Type End suction centrifugal pump
Capacity & pressure 4 m3 / hr. @ 2.5 bar.
Power 1kw
Origin Japan
Qty Two (1 duty/ 1 standby)
02 of 10Page
Piping material PVC
Scum box:
Quantity One for settlement hopper
Material Stainless steel 304
.
Lamella Sheets:
Quantity 8
Dimensions (1.3*0.3*0.3) m3
Material PVC
Overflow weirs:
Quantity One for settlement hopper
Type V- Notch gate
Material Stainless steel 304
Air Blowers:
Qty. 2 (1duty/1standby)
Duty 750 m3/hr. @ 500 mbar
Power 20 kw
Accessories Steel support frame
Pressure gauge
Inlet filter silencer
Discharge silencer
Flexible connection
Anti-vibration beds
Material Cast iron (Casing, rotor & cover)
Chrome steel (shaft)
Origin Europe
02 of 13Page
Fine Bubble Air Diffusers
Qty. 200
Type Fine bubbles air check diaphragm
Material Plastic body with rubber diaphragm
Filtration system
02 of 14Page
Sludge treatment
Q PRESS MACHINE (Capacity 0.5 m3/hr.)
The Q-PRESS is a screw press with a conical screw shaft and cylindrical sieves consisting of three treatment
zones: inlet and drive zone, three-part thickening and dewatering zone, and press zone with pneumatic
counter-pressure cone.
In the first part of the thickening and dewatering zone the supernatant is quickly removed by the feed
pump via a large free filter surface at a low primary pressure. A pressure probe in the feed area controls
the primary pressure thus ensuring a constantly high filtrate quality.
In the second part of the screen the volume of material between the screw flights is reduced by the conical
screw and the sludge pressed against the inner screen surface so that the sludge is dewatered, with a
continuous reduction of the filter cake thickness. The screen apertures are much smaller in this screen
section.
In the third part of the screen the residual water is pressed out of the sludge, at a minimum filter cake
thickness, by the pneumatic counter pressure cone at the press discharge. The dewatered sludge is pushed
by the conveying screw past the pressure cone into the discharge chamber. The sludge residence time in
the screw press and thus the filtration time can be adjusted to individual requirements by adjusting the
rotational speed of the screw shaft.
Due to pump feeding, large volumes of sludge water are removed already in the pre-dewatering zone. This
permits cost-efficient dewatering of thin sludge with a solid’s concentration < 1%. This application allows
typical dewatering results of 18 – 25% DS and achieves a sludge volume reduction up to > 97% in a single
step!
Dewatering performance is usually impaired and operator attention increased by frequently varying sludge
quality. Our Screw Press Q-PRESS automatically self-adjusts to over- and under loading. A control loop
makes sure that optimal operation is always maintained.
02 of 15Page
Components:
Features
* 2 hp Italy driving motor with gear box connected to variable-frequency drive (VFD) to control speed.
02 of 16Page
Control Panel
Purpose: To provide a complete central motor control center, pre-wired & ready for installation
Quantity One
Free standing control panel completely assembled, wired
Type and tested at the factory. The panel shall be fabricated in
sheet steel, shaped and reinforced to form a rigid front
access enclosure.
The panel should be complete with all pushbuttons, fuses,
Mounting selector switches, contactors, relays, indicating lights,
timers etc. to form a local central control station
Wiring shall be brought out to screw type terminal block,
Cabling
labeled and identified in accordance with wiring diagram
All equipment and major devices shall be provided with
nameplates in English engraved plastic and all
Nameplates
pushbuttons and selector switches shall be appropriately
tagged.
All steel work shall be bonderised or given similar
Finish treatment before priming and painting with epoxy paint
to a smooth finish
Starters The panel shall accommodate starting contractors for all
motors. The starters shall be controlled through PLC.
Lights Alarms, indicator lights and other auxiliaries.
Main power supply 380 volt/ 3 phase/ 50 cycles
Plant Wiring
This shall be provided where scope incudes installation.
Cables shall be suitably sized for the appropriate duty, PVC sheathed and extended only between the local panel and
the individual drives and controls in the scope of this offer.
Pipework
The process and interconnecting pipework for the treatment plant will generally be in UPVC, as described under the
various sections of this specification. All UPVC pipework exposed to direct sun light shall be protected with suitable
alkyd-based paint.
02 of 17Page
DRAWINGS
02 of 18Page
02 of 19Page
المعادى الجديدة – القاهرة – جمهورية مصر العربية- 18 شقه- – الدؤر االول93 عمارات امتداد االمل – عمارة
) + 020 ( 072270587 : تليفاكس
EMTAD ELAAML -BORG 93 FIREST FOOR FL.NO.18 New Maadi Tel. Fax. (+202 ) 27007258
E mail adelmm50 @ gmail .com & adelmm40@ yahoo .com
02 of 02Page