INTRODUCTION
Overview
The main reason that we developed the water recycle system is to protect human
health. The technology available to do this has become more efficient and
effective over the years and new methods are still being found today.
We treat Raw Effluent to-
Avoid drinking water contamination
Avoid food contamination
Avoid ecological damage via eutrophication
This manual provides guidelines for operation and maintenance of Effluent
Treatment plant. It provides starting operation and maintenance of equipment
supplied for the plant. Do read through the guidelines in this manual prior to
actual start of the plant.
Design Parameters
A. INLET PARAMETERS
Sr. No. Parameters Unit Results
1 pH - 4-6
2 COD Ppm ≤ 72000
3 BOD Ppm ≤ 27391
4 TSS Ppm ≤ 3642
5 O&G Ppm <5
3
ASSUMPTIONS
1. The plant is designed to operate at +/- 10 % variation in raw wastewater
parameter.
2. No other parameters other than mentioned above is present in the raw
waste water which is beyond Pollution Control Norms and hazardous to
microorganisms.
3. Treated water quality will be achieved if the inlet raw water quality is as
per the raw water quality mentioned as well as no other pollutant than the
mentioned, is present or exceeds the limits or which is hazardous in
nature, which otherwise may affect the biological treatment process.
4
CHAPTER II
PROCESS DESCRIPTION
To have eco-friendly & natural treatment, this plant is designed based on the
biological treatment concept. This means naturally occurring microbes (which
are present in sewage water itself) removes or degrade the organic matter
present in the sewage & at the end clean water is available for the non-potable
usage or to dispose safely in the drainage or river bodies as per the norms.
1. Pre – Treatment
Screening: This is the first units of the plant in which large or floating materials
in the sewage gets arrested and blockage or choking of the downstream
equipment’s can be avoided. This arrested material will be removed manually
and then will be disposed off suitably.
Oil & Grease trap: Domestic sewage sometimes gets waste water from pantries
or kitchen which contains free oil. This oil if not removed then creates the
problem of scum accumulation and affects the functioning of microbes.
To avoid this, oil & Grease trap is provided after the bar screen, where free
floating oil is arrested prior to entry in the plant. Accumulated oil will be
removed periodically and disposed off properly.
5
If at site, septic tank is provided then collection tank as well as air agitation is
not required.
Transfer Pumps transfer the wastewater from equalization tank or lift station to
the process tank. The transfer pumps are automatically activated by the Level
Switch in a lead/lag arrangement according to the level in the tank.
WORKING PRINCIP LE
The flotation unit is a high-built open tank separator for dissolved air assisted
separation of floc from water. The water enters the inlet compartment through a
distribution system, which regulates and stabilizes the flow before entering the
separation or process zone. The pre-treated wastewater and air saturated recycled
water are mixed in a specially designed mixing chamber where air saturated
recycled water which is pressurized and depressurized before it is released to
floatation tank which operates at atmospheric pressure and this results in
formation of fine air bubbles (30 to 50μm). Further, the floating material adheres
to air micro bubbles. This increases the buoyancy of floating materials to the
surface of the unit.
The floating materials collected on the surface are trapped by moving surface
skimmer which is adjustable. Heavy sludge is removed from the sludge cones at
the bottom of the separation compartment. Sludge drain valves are installed on
the drain line which can be manually or automatically operated depending on the
project requirement. The frequency of de sludge depends on concentration of
6
impurities present in the wastewater. The treated water leaves the floatation unit
through a retention baffle and over flow weir.
In multistage recirculation pump, air and recycled "clean" effluent is introduced
to the pump suction. The proportion of air/water is controlled by the operator
through simple valves. Under pump discharge pressure this air effluent mixture
becomes supersaturated with air micro bubbles. This enriched stream is then
recycled back into the dirty effluent and fed to the DAF unit. Up to 35% air can
be achieved with 100% saturation and micro bubble size smaller than 30
microns will be achieved.
2. Secondary Treatment
Wastewater from intermediate tank would be pumped into each UASB reactor
through a specially designed distribution pipes. The multiple distributions ensure
uniform distribution of flow throughout the sludge blanket making maximum
rises to the top of Anaerobic reactor along with bio-gas generated and also some
sludge particles. A unique three-phase gas – solid – liquid separator would be
provided at the top to separate out the gas, liquid and the sludge particles.
The wastewater flows upward through a sludge blanket composed of
biologically formed granules or particles. Treatment occurs as the wastewater
comes in contact with the granules. The gases produced under anaerobic
conditions (principally methane and carbon dioxide) cause internal circulation,
which helps in the formation and maintenance of the biological granules. Some
of the gas produced within the sludge blanket becomes attached to the biological
granules. The free gas and the particles with the attached gas rise to the top of
the reactor. The particles that rise to the surface, strike the bottom of the
degassing baffles, which causes the attached gas bubbles to release. The
degassed granules typically drop back to the surface of the sludge blanket. The
free gas and the gas released from the granules are captured in the gas collection
domes located in the top of the reactor. Liquid containing some residual solids
7
settling chamber, where the residual solids are separated from the liquid. The
separated solids fall back through the baffle system to the top of the sludge
blanket.
Gas will be collected in the domes provided at the top. The liquid overflows
through the gutters and suspended solids then separated are allowed to settle
down in the sludge blanket thereby retaining valuable bacterial population.
The gas will be carried through a gas line equipped with safety devices to the
flare stack and would be burnt subsequently.
This is the main section of the plant where degradation of organic pollutants
with the help of aerobic micro-organism takes place
In aeration tank activated biomass is developed in such a way that certain MLSS
is maintained for continuous effluent flow which comes to aeration basin.
Effluent is degraded in given retention time and activated sludge is further
passed to clarifier and recycled as per requirement. The sludge, which is not
required after recirculation, is passed to sludge drying bed to maintain the
aerobic condition in the bioreactor, air supply arrangement is provided by means
of aeration equipment which has high oxygen transfer efficiency.
In secondary clarifier, effluent passed from secondary aeration tank along with
biomass (MLSS) gets settled here. The settled biomass completely transfers to
sludge drying bed.
8
3. TERTIARY TREATMENT
A. COARSE FILTRATION
The raw water is first passed through a Multigrade sand filter to reduce the
suspended solids present in the raw water. The filter will have to be washed with
the help of raw water for 10 to 15 mins daily. This filter is provided to keep a
check on the suspended solids.
C. BIOLOGICAL TREATMENT
Biological treatment consists of Aerobic zone. This is the main section of the
plant where degradation of organic pollutants with the help of aerobic micro-
organism takes place. To provide higher surface area for micro-organism,
floating media is provided. On which micro-organism growth takes place. This
makes bioreactor is of hybrid concept in which both suspended growth as well as
attached growth principal for micro-organism is achieved. Due to higher
population of micro-organism, effective volume of bioreactor reduced drastically
as compared to conventional aeration tanks.
To maintain the aerobic condition in the bioreactor, air supply arrangement is
provided by means of aeration equipment which has high oxygen transfer
efficiency.
9
Advantages of treatment scheme
This plant will produce the treated water which can be recycled back.
This plant is based on biological principle hence no need uses of any
excessive hazardous chemicals for the main degradation process.
Being an attached growth process there is no need of Return sludge
recycling.
Due to media technology, foot print area required for the plant is very less.
Due to smaller unit sizes, civil construction cost & overall project cost is
very less
Due to efficient system, electrical power requirement is very low.
Due to user friendly equipment, plant maintenance is very less.
Due to inbuilt automation, plant machinery life is high & ensures trouble
free operation.
All process rotating electromechanical equipment is provided with standby
equipment to ensure the uninterrupted operation.
Due to effective after sales service from our qualified staff, maintenance
issues to the owner are less.
This plant is based on biological principle hence no need uses of any
excessive hazardous chemicals for the main degradation process.
LEVEL OF AUTOMATION:
The plant is designed based on moving media aerobic process which needs no
skilled manpower. The operations involved are ON / OFF of the pumps and air
blower, sludge drain, filter backwash. These operations can be done by the
security or gardener. The pumps are provided with level switch for ON /OFF
operation & the tank water level and to avoid dry run and mechanical damage.
This is SEMI-AUTOMATIC.
10
CHAPTER III
EQUIPMENTS DETAILS
- BAR SCREEN
Quantity 1 No.
MOC MSGI
Type Fine
Size 10 mm Bar spacing
- OIL SKIMMER
Quantity 1 No.
Capacity 5 LPH
Type Single belt
Belt MOC PU/Suitable
Oil tray MOC MS
Motor cover MOC MS
Oil skimmer frame MS
Gear Box 1 no.
11
- ALUM DOSING SYSTEM
Type Electronic Diaphragm
Pump Capacity 0-10 LPH @ 3Kg/cm2
Quantity of pump 2 Nos. ( 1W+1SB )
Tank Capacity 100 lit
MOC of tank LDPE
Dosing Tank 1 No
MOC MSEP
Hand mixer 1 no.
- FLASH MIXER
No. of Units 1 no.
Mixer Speed 300-500 RPM
MOC MSEP
Flash mixer 1 no.
MOC MSEP
Mounting Arrangement MS C Channel
- FLOCULATOR SYSTEM
No. of Units 1 no.
Mixer Speed 6 t 8 RPM
MOC MSEP
Flocculator RPM 10-20
Gear Box 1 No
Mounting Vertical Mounted
Mounting Arrangement MS Channel
12
- PRIMARY TUBE SETTLER MEDIA
Tank 1 no.
Shape of tube Square
Tube Media MOC PVC
Shape of Tube Square 55 x 55
Angle of Tube 600 Deg.
Straight Height 520 mm
Thickness 1.0 To 1.2 mm
Working Temp 50 Deg. C
Quantity 1 Lot
13
- POLY DOSING SYSTEM FOR DAF
Type Electronic Diaphragm
Pump Capacity 0- 5 LPH @ 3 Kg/cm2
Quantity of pump 2 Nos (1W + 1SB)
Tank Capacity 50 lit
MOC of tank LDPE
Dosing Tank 1 no
Mixer 1 No.
MOC SS 304
Mixer 1 no.
- DAF UNIT
Quantity 1 Set
Type Circular
MOC MSEP
Accessories High Pressure Pump, Compressor
- AIR COMPRESSER
Capacity 1 m3/hr @ 6.5 kg/cm2 head
Quantity 1 no.
Type Single stage belt drive compresser
14
- DIFFUSER MEMBRANE
Type Disc / Tubular
MOC EPDM
Duty Uniform air distribution & oxygen
Transfer
Quantity of diffusers 1 Lot
15
- FILTER FEED PUMP
Quantity 2 nos. (1W + 1SB)
Type Centrifugal, Monobloc
Capacity 1.0 m3/hr @ 28 m head
MOC CI
16
- INTERCONNECTING PIPING & FITTINGS
MOC UPVC Sch 40
Quantity 1 lot as per requirement
Piping Supports 1 lot as required
MOC MSEP
Type IS 1239
Accessories Valves, bends, elbows, reducers,
clamps, Fittings etc
Flanges 1 Lot
Standard BS 10 Table D
- INSTRUMENTS
Pressure Gauges 1 lot as per requirement
Location All pump & blower common discharge
side, and each equipment
pH Meter 1 No
Location EQT Tank
- ELECTRICAL PANEL
MCC Control Panel 1 No
MOC MS Powder coated
Standard IP54
Type Non – Compartmentalized
Mounting Floor / Skid
Quantity 1 set as per requirement with separate
MCB
ON/OFF/trip button 1 lot
Cabling 1 Lot
Cable Entry Bottom
Type Flexible
Cable Treys 1 lot
MOC GI
Mimic Display 1 no
17
Energy hour meter 1 no
- FILTER PRESS
Quantity 1 no.
Type FILTER PRESS
Mechanism Manual
Specification 14” x 14”
No of plates 6
MOC PP
18
NOTE :
1. Earthing Pit shall be supplied by client. Earthing material will be
provided by WTE. Earthing material for instrumentation will be
provided by WTE.
2. Panel will be non-Draw-out fixed Type.
3. We have considered STD specifications for piping, Valves,
electrical and instrumentation as per above. Any deviation in the
same will be having cost impact.
4. All Piping and fittings are considered as per ERW pertaining to
WTE STD.
5. All drawings shall be provided only in Auto Cad Latest version. 3D
Modeling is excluded from our scope of supply.
6. All pumps are Non-API with Two Pole, IE2 motor.
7. We have considered our STD HSE requirement. Any additional
HSE requirement will have cost impact.
8. All TPI (Third Party Inspection) are excluded from our scope of
supply.
9. We have considered our STD painting specifications. For
additional requirement will have cost impact.
10. QAP will be done as per WTE standards for any additional
requirement will cost extra.
11. We have considered Standard electrical specifications as per WTE
standard, for any additional requirement will cost extra.
12. Our Scope of supply will be strictly as above.
19
CHAPTER IV
PRECOMMISSIONING
1. Direction of the flow is marked clearly on the pipes.
2. All the mechanical equipment is tested and are in good working condition
properly lubricated.
3. All the tanks and piping are clean and free of debris.
4. All the process units and mechanical equipment should be tested with water
for the normal operation of each unit and hydraulic system. Only after this,
wastewater should be introduced to the system.
5. All the lights, meters, indicators, etc. are operational.
6. Check all lines for leaks. Any repairs needed are easier to make before
wastewater is added.
7. Operation and maintenance manual have been read by the operators and
stored in one location for ready reference.
8. No load runs of motors
9. This is carried out to ensure that the motors are running smoothly without any
problems either in their bearings or in stator - rotor combination. To carry out
this activity, disconnect the coupling pins/valves from the driven equipment.
Then the motors are kick started and stopped to observe their direction of
rotation.
10.If the direction is not as required by the driven equipment, then reverse the
phase connections.
11.The motors are once again kick started to ensure the required direction of
rotation. After ensuring the direction of rotation, no load run shall be carried
out for 4 to 8 hours depending on their ratings.
12.If the motors capacities are of smaller size, then there is no need of going for
no load test. During the no-load run, current drawn by motor, vibration, noise
and bearing temperature shall be observed and noted. If all these readings are
within limits, then motors are coupled with driven equipment for further step.
Otherwise, possible causes for defects should be found out and rectified as
given in Motor Manuals.
13.On Load Trial (With Clear Water).
20
PLANT START UP
MECHANICAL START-UP
Before starting the plant trials on full load, it is essential that mechanical
performance of the equipment have to be established to ensure their proper
functioning when sewage is taken in. To achieve these following steps should be
observed –
21
All tanks in which equipment is supposed to run on load are filled up with clear
water. Lines are flushed with water. Then the respective equipment are run as
mentioned below:
PUMPS
Open suction valves in pump suction. Start the pump with delivery valve closed.
Open the valve slowly observing the pressure gauge so as to set the delivery
pressure to design limit. The pump will thus be running at designed duty point.
Allow the pump to run. It will run for the duration, which will be determined by
capacity of holding tank and pump for rate, unless fresh water is fed into holding
tank. During this period observe motors temperature; pump bearing temperature,
vibration, noise, etc. In case of any problems, study/follow the equipment manual
enclosed.
BLOWERS
Close the discharge valve.
Open vent valve fully.
Start the Blower
Open the discharge valve gradually.
Close the vent valve gradually.
DAF
Close the discharge/ drain valve.
Open inlet line valve fully.
Start the Feed Pump, and fill the DAF tank.
Start the recirculation pump and DAF system.
22
Open the drain valve as per the cycle operation.
DECANTER
Open the feed line valve.
Start the decanter motor.
Connect the sludge disposal to the collecting tray.
PLANT SHUTDOWN
- In case plant needs to be shut down for a considerable period of time,
following should be observed.
- Close inlet valve to plant and open bye-pass valve if any.
- Pump out sewage from intermediate sump.
- Open drain valves of tank and drain out the contents.
- Backwash the vessels before shutdown by using fresh water.
- The equipment then should be flushed with clear water.
- Follow instructions for short & long shutdown for membranes as per
membranes manufacturer.
23
CHAPTER V
1) BAR SCREEN:
Objective:
- TO stop the large particles to enter in the process.
Normal Operation
- Bar screen comes up with 6-10 mm gap.
- The larger particles from the gap arrested prior to enter in the process.
24
2) EUQALIZATION TANK:
Objective:
- To equalize the incoming Raw Sewage
Process:
- Raw water generated in various locations of the plant flows into the
Equalization Septic tank.
- This raw water has different individual characteristics, which are
continuously mixed and homogenized in the tank.
- This prevents shock loading on the downstream biological units.
- Level switch is provided in the tank for tripping the pumps if the level in
the tank is low.
- Also aeration is provided for continuous mixing.
3) NEUTRALIZATION TANK:
Objective
- To neutralize the pH level in tank.
25
5) SLUDGE HOLDING TANK:
Objective:
- To collect the plant heavy sludge into the tank.
Normal Operation
- The heavy untreated sludge used to transfer form sludge pump.
- Only transfers the sludge to the sludge holding tank.
6) DAF SYSTEM:
Objective:
- To clarifies wastewater by removing suspended matter.
Process:
- Removes the suspended matters by using an scrapper blade with motor
driven.
Normal Operation
- The neutralized water firstly enters in pipe flocculator where it mixes with
the chemical.
- The Coagulant Flocculent dosing helps to separate the solid matters from
water.
- This water directly enters into the DAF where solid particles floats on the
top of water with the oil.
- The motor driven scraper wipes out the floating particles and clear water
passes out by outlet line.
- The recirculation pump keeps recirculate the water to keep sludge play with
the help of air.
7) UASBR:
Objective:
- To separate the treatment useful water from the heavy sludge.
Process:
- The separated water flows to the aeration tank by using gutter.
- The left sludge deals with the bio-logical reaction and generates an gas.
- Which burnt burnt using flare stack.
Normal Operation
- The wastewater enters the reactors from the bottom and flows upward.
- The sludge left behind the UASBR tank.
26
- Due to the biological treatment flammable gas generate inside the UASBR
tank.
- Then the gas burnt by flare stack.
8) AERATION TANK
Objective:
- To reduce organic load (COD, BOD) from raw sewage using biological
treatment
Normal Operation
- After proper acclimatization with the raw sewage, the normal flow of
sewage is fed to the aeration tank continuously.
- Run the air blowers continuously for 24 hours.
- Fine bubble diffusers are placed in the bottom of aeration tank which
diffuse atmospheric oxygen into the aeration tank which is consumed by
the biomass developed in aeration tank (bacterial culture) during aerobic
oxidation of organic matter present in the sewage.
9) TUBE SETTLER
Objective:
- This provides for a particle settling depth that is significantly less than the
settling depth of a conventional clarifier, reducing settling times.
Normal Operation
- The settlers use multiple tubular channels sloped at an angle of 60° and
adjacent to each other.
- Tube settlers capture the settle able fine floc that escapes the clarification
zone beneath the tube settlers and allows the larger floc to travel to the tank
bottom in a more settle able form.
- The settler's channel collects solids into a compact mass which promotes
the solids to slide down the tube channel.
27
10) SETTLING TANK
Objective
- To settle excess Bio-Sludge.
Process
- It contains Tube settler media.
- This media prevents the sludge from rising up.
- Thus, it separates clear water and the sludge remains at the bottom.
- Settled Bio-Sludge to be fed to the filter press for dewatering of sludge.
Normal Operation
- Sludge Settling & overflow to supernatant tank.
Objective:
- To pump the Sludge from Tube Settler to the sludge drying bed.
Process
- One pump is provided to pump sludge to sludge drying bed. It should be
manually operated twice in a day.
Normal Operation
- Ensure that tank holds desired sludge level.
- Open suction and discharge valve of pump.
- This pump is to be used in suitable rotation during normal flow to restrict
wear and tear of the pumps as well as to ensure regular maintenance.
28
Routine checks before commissioning are to be followed as indicated in the
manufacturer’s operation manual.
Objective
- To pump the treated Effluent water to Sand Filter.
Process
- One working centrifugal type pump is provided to pump sewage to the sand
Filter.
Normal Operation
- Ensure that tank holds desired liquid level.
- Always keep open the suction and discharge valve of pump. Care must
be taken to ensure that entrapped air if any is released through air release
cock before starting the motor.
- This pump is to be used in suitable rotation during normal flow to restrict
wear and tear of the pumps as well as to ensure regular maintenance.
Routine checks before commissioning are to be followed as indicated in the
manufacturer’s operation manual.
Objective:
- To remove the suspended solids from treated sewage
29
Process
- Butterfly valves are provided for Rinse, Backwash & Service Cycle of the
filter.
Normal Operation
- Keep valve position on service for regular filtration process.
- Filtration removes balance suspended solids, odor and color from treated
sewage.
- Once in 24 hrs. carry the backwash operation of the filter.
- This should be done for 10-15 minutes.
- Then rinse the filter for 5-10 minutes.
- Again place the service line valve in open position.
Objective:
- To remove the Color and odor from treated sewage
Process
- Butterfly valves are provided for Rinse, Backwash & Service Cycle of the
filter.
Normal Operation
- Keep valve position on service for regular filtration process.
- Filtration removes balance suspended solids, odor and color from treated
sewage.
- Once in 24 hrs. carry the backwash operation of the filter.
- This should be done for 10-15 minutes.
- Then rinse the filter for 5-10 minutes.
- Again place the service line valve in open position.
Objective:
- To collect and store the treated water.
30
CHAPTER VI
MAINTEINANCE
1. The Effluent Treatment plant should be inspected every three months and any
damaged paint work or vessels, pipe work and valves renewed.
31
2. An internal inspection of tanks and vessels is also recommended every six
months, although this period could be extended if service experience indicates
that a longer period would not jeopardize the performance.
5. Entry into the vessels or tanks should be avoided unless required in case of
emergency but if unavoidable, must be carried out under the supervision of our
supervisor.
6. Valves should be inspected regularly and gland packing where used should be
replaced regularly.
The duties of Plant Operator may be classed under the following general outline:
To ensure that the plant consistently produces a sewage of no lower quality than
it was designed to produce.
32
To see that all operating details are performed promptly and efficiently. This is
best accomplished by establishing a routine schedule of operation
To carry out or arrange for all required laboratory analysis and tests of the
sewage passing through the plant as to maintain proper efficiency in operation
To maintain all equipment and structures of the plant in good order and
condition
To keep proper records of operation & maintenance jobs including spare part
costs and consumed man hours.
To ensure that all precautions necessary for the safety of personnel and property
are observed.
To bring the notice of the engineer any alteration work, or facilities which may
be necessary to place or maintain the plant in efficient operation
33
GUIDELINES FOR DATA RECORDING
General
The regular recording of operating parameters and other information serves many
purposes.
Plant Operation
Review of operating records can indicate:
- Process malfunctions
34
Plant Maintenance
Records are needed to show type and frequency of maintenance of operating
Units and evaluation of effectiveness of maintenance programs
Budgets
Records are used to support budget requests for personnel, additional facilities, or
equipment
Accidents
Records may be needed in damage suits. They can be especially helpful to the
Operator if an accident occurs. As soon as possible after an accident someone
should record the chain of events leading to the accident, exactly what happened,
and any preventive or corrective action
Reporting
Records provide the actual data for the preparation of monthly or annual reports.
B] Operation Logs
- Record Logs/Sheets
- Monthly Report
B) The DAILY ROUTINE JOBS & CHECKLIST shall verify that the
Operator has carried out necessary inspection and observations
The Monthly Report also contains a summary of Influent and Final Sewage quality
parameters and "Trend Curves" for Laboratory tests.
C] Maintenance Jobs:
1) All mechanical and electrical work tasks on equipment that needs to be carried
out on a weekly, monthly or yearly basis to maintain the equipment in a
satisfactory working condition. This will include repair jobs as well as regular
servicing such as lubrication/oil changes, etc.
2) All physical repairs or servicing work on equipment that needs to be carried out
immediately to restore process control (or which may be carried out at a later stage
if not critical for the operation of the Plant)
36
TABLE No. 1
TESTS SCHEDULE
JOB DESCRIPTION REMARKS/REFERENCES
2.TREATED WATER
pH (Once a week)
TSS & COD (Once a Month)
Free Residual Chlorine (Once a Month)
BOD5 (Monthly)
Note:
TSS : Total Suspended Solids
DO : Dissolved Oxygen
COD : Chemical Oxygen Demand
BOD : 5 days Biochemical Oxygen
Demand
37
CHAPTER VII
SAFETY
7.1 Objectives
The primary objective of safety measures is to reduce the chance of injury to plant
personnel or visitors. The design of this plant incorporates a number of safety
features for the purpose of providing a safe place to work.
The Operator has the responsibility for the Plant and must see to it that it is
maintained in such a manner that a safe place to work is continuously provided.
This can only be done by constantly acting and thinking safety.
The Operator has the responsibility of protecting himself and other plant personnel
or visitors by seeing that proper safety procedures are followed.
All operation personnel should train themselves to analyze jobs, work areas and
procedures from a safety standpoint. Potentially hazardous actions or conditions
shall be recognized.
38
Accidents can be prevented by using good common sense, following established
safety procedures, and particularly by acquiring a good knowledge of the hazards
peculiar to specific jobs.
Behind every accident there was a chain of events, which led to an unsafe act,
unsafe condition, or a combination of both.
The type of equipment and structures required by a Sewage Treatment Plant can be
very hazardous. For this reason, the design of the plant has included a number of
safety features to help minimize the risk of injury to the plant personnel. But even
the best of safety measures are of no value if established safety procedures are not
followed. If an accident occurs, it is equally necessary to know what steps to take to
minimize further injury and damage.
This section describes potential safety hazards of the Plant and recommends ways to
avoid or minimize these hazards. However, you should not rely upon the
information presented here exclusively, because work habits and method of
operation and maintenance that develop over the life of the plant may introduce
additional hazards. As conditions will change continually, it is extremely important
that all personnel always be on the lookout for potentially hazardous actions or
conditions.
Physical Injuries
Chemical Burns
Fire
39
Electrical Shock
Noise
40
Emergency eyewash is located at the Plant for washing hazardous chemicals off the
skin and out of the eyes. All plant personnel should know where the emergency
eyewash is located.
Toxic or suffocating gases or vapors may come from any of the chemicals used in
the treatment process. You are especially subject to this hazard when chemicals are
in contact with water or when working with chemicals in enclosed and unventilated
areas.
Because toxic gases and vapors can rapidly disable a person, it is important to
constantly be alert to conditions of unusually strong vapors and fumes or situations
where you might be subject to hazardous concentrations of toxic vapors or fumes.
Take immediate actions to correct any unusual situation.
Chlorine is a particularly hazardous gas. All personnel should know the proper ways
to handle chlorine and should be trained in the use of self-contained breathing
apparatus.
7.2.5 Fire
Burns from fire can cause very serious injury. Avoid the accumulation of flammable
material and store any material of this type in approved containers at proper
41
locations. Note the location of firefighting equipment and the proper use of the
equipment.
7.2.7 Noise
Loud noise from Air Blowers can cause permanent ear damage. Personnel need to
wear proper ear protecting devices whenever working in noisy areas.
When working with the filter, you must be particularly careful not to bump, scrape,
or cut yourself on the internal water distribution and collection piping and piping
supports.
Other hazards associated with the chemical addition systems include cuts, bruises,
broken bones and head injuries due to tripping over or bumping into piping systems.
Always be careful of where you walk and be aware of the location of overhead
piping. Always wear a hard-hat when working around overhead piping.
Some chemicals may come bagged as a dry powder that must be loaded in the top of
a mixing tank. Never attempt to carry bags of chemicals up a ladder. Never attempt
to lift a bag that seems too heavy. If a bag seems too heavy to lift, it probably is. Get
assistance.
Whenever adding dry chemicals to a mixing tank, you are particularly subject to
coming into contact with the chemical or inhaling its dust. Always wear protective
clothing and a dust mask when handling dry chemicals.
Whenever working on chemical tank platforms, you are at risk of falling to the
ground or into a tank. Such falls may cause serious injuries or drowning. Whenever
working on raised platforms, stairways or ladders, be certain that you have a clean,
firm surface to stand on. Remove all slimes, rags, greases, or other material that may
cause you to slip. Good housekeeping in these areas is mandatory.
Railings should be installed along the tank side of all walkways. Railings should
also be installed on all stairways. Do not work outside of these railings, they are
there to help prevent you from falling. Keep all railings and walking surfaces in
good repair.
7.3.2.1 Chlorine
As chlorine is extensively used, some aspects with this chemical is dealt with in
particular.
43
Chlorine is a very active chemical that reacts readily with most forms of living
tissue as other organic and inorganic materials, metals and non-metals. This
reactivity also allows its use in oxidizing objectionable chemicals in waste.
However, because of its reactivity, chlorine is difficult to handle, while its toxicity
makes it hazardous if it is not properly handled and controlled.
If exposed to this chemical in a hazardous way, the patient shall in all cases be
removed immediately from the contaminated area, a physician called and
appropriate first aid must begin immediately. A brief outline of first aid measures
for exposure to chlorine is as follows:
Eyes
In case chemical is splashed into the eye (no matter the quantity), quick action is
vital. The patient should be laid down, using force if necessary, the eyelids should
be held apart and the eyes flushed copiously with running water (a boric saline
solution may also be used). The flushing should be continued for about 15 minutes
and repeated if necessary. The patient should be encouraged to roll his eyes during
the operation. No medication should be attempted except under specific instruction
from a physician.
Skin
The patient should be placed under a shower immediately, clothes and all. Clothing
should be removed while the shower is running and the skin washed with larger
quantities of soap and water. Neutralization of chlorine with chemicals should not
be attempted. Salves or ointments should not be applied, except as directed by a
physician.
Inhalation
If the patient is breathing, he should be placed in a comfortable position, and kept
warm and rest until a physician arrives. If breathing seems to have stopped, artificial
44
respiration should begin immediately. Mouth to mouth resuscitation or any
approved method may be used.
Oxygen should be administered if equipment and trained personnel are available.
Automatic artificial respiration is considered preferable to manual, but only when
administered by an experienced Operator. Some rest is recommended after severe
chlorine exposure.
Throat Irritation
Drinking milk will relieve the discomforts of throat irritation from chlorine
exposure. Emergency rules given by a physician should be followed. In the absence
of such rules, the first aid steps above are suggested.
7.3.4 Sampling
Because you may be required to collect water samples and conduct certain
laboratory tests, you must be aware of the specific hazards involved in this type of
work.
Collecting Samples
Rubber gloves must be worn when your hands may come in contact with sewage
and/or chemicals. When you have finished sampling, always wash the gloves
thoroughly before removing them. After removing the gloves, wash your hands
thoroughly.
7.4 Fire Prevention
45
Fires are a serious threat to the health and safety of the Operator and to the
buildings and equipment in the Treatment Plant. Fires may injure or cause the
death of a person. Equipment damaged by fire may no longer work properly and
the Plant may have difficulty to function.
Know where fire extinguishers and hoses are kept and know where possible yard
hydrants are located. Find out what each is for and how to use them. You can
prevent fires by:
7.6 Housekeeping
Good housekeeping can and has prevented many accidents. When tools and
equipment are not being used, see that they are kept in their proper place. Clean
up all spills of oil, grease, and other substances. Keep walkways and work areas
clean. Provide proper containers for waste, oily rags, papers, etc. and empty these
frequently.
46
CHAPTER VIII
TROUBLESHOOTING POINTS IN ETP
SR.
NO PROBLEMS CAUSE REMEDIES
.
A BAR SCREEN
1. Clogged with
A.1 Clean bar screen regularly.
Inlet flow debris.
reduced. 2. Damaged bar Check bar screen regularly and repair if
A.2
screen necessary.
B OIL & GREASE CHAMBER
1. Provision for oil removal.
Non proper
1. Oil enters in 2. Oil trap should be as per desired level.
B.1 growth of
aeration system 3. Clean the O&G chamber and check
Bacteria
for and damages.
47
C. AIR BLOWER
Check belt condition and replace it if
1. Loose belt
necessary.
2. Loose foundation
Tighten the foundation bolts.
C.1 Noisy operation bolts
3. Air filter damages. Replace air filter.
4. Damaged exhaust Check for exhaust system and repairs if
system necessary.
Check belt condition and replace it if
1. Loos belt
necessary.
2. Faulty motor Check for motor and repair if necessary.
3. Worn out air Check and all wear-tear parts and
C.2 Reduced air flow blower/ motor parts. repair/replace if necessary.
4. Leakages in air
Check for leakages arrest them.
blower/line.
5. Air filter
Replace air filter.
damaged.
D CENTRIFUGAL PUMPS
1. Improper pump
Make it proper
selection
2. Damaged pump
Loss in outlet Check and repair/replace if necessary.
D.1 impeller.
flow
3. Leakages in
Check and repair/replace if necessary.
casing
4. Improper line size Make it proper
1. Loose foundation
Check and tighten the foundation bolts.
bolts
D.2 Noisy operation 2. Motor issue Check for motor and repair if necessary.
3. Bearing Check for bearing condition and replace
maintenance. if necessary.
E DAF SYSTEM
E.1 Micro Bubbles 1. DAF pump running Check DAF pump operation and repair
formation issue pump if necessary.
48
2. DAF pump getting Check airline and check for air
air or not. pressure.
3. Pressure on the Check for desired backpressure. Or
DAF pump refer the manual.
1. Scrapper blade
Check and repair/replace if necessary.
damages
2. Scrapper motor not
Check and repair/replace if necessary.
Not wiping out working
E.2
the particles 3. Chain mechanism
Check and repair/replace if necessary.
not working.
4. Particles settles Check for air compressor and air line at
down the DAF
1. Damaged Scrapper
Check and repair/replace if necessary.
mechanism.
No clear water at
E.3
outlet of DAF
2. No air at DAF Check for air at DAF.