Improper and Non-standard Cable Joint Did by For proper Cable Jointing, Sub-contractor
1 Embankment#1,2&3 9/2/2022 KFCA_SAFARI_SA_TR#006 Under Contractor Not under scope of Safari
Contractor required to perform the task
Replacement of Rusted Electrical Main Recommended to Replace the entire Main Contractor to complete the project and after Old Panel Removed, Building Under
3 SA-16 Electrical Room 18/10/2022 KFCA_SAFARI_SA_TR#031
Distribution Panel panel with a new panel. T&C to handover to safari. Renovation
Recommended to Replace the entire Main Contractor to complete the project and after Recommend for installing new Electrical LV
8 SA13 Maintenance Building 6/1/2023 KFCA_SAFARI_SA_TR_058 LV main Panel Body Rusted & Damaged
panel with a new panel. T&C to handover to safari. Main Distribution Panel
Electrical (BA Side)
Bahrain new Toll Gate New Toll gate building Project department has
Down Lights are of indoor but installed Installed light are indoor type, required out door Install the outdoor type of lights competible with
3 building Space frame 2/26/2022 KFCA_SAFARI_BA_TR# 5 installed indoor lighting at the outdoor space
outdoor. type down lights. weather condition and appropriate IP rating.
lighting frame and all (21 Nos.) and all are not working
At cargo departure due to an accident on the Safari to initiate the process to change the
CARGO DEPARTURE lighting Pole and Foundation need to be repare
4 27-Feb-22 KFCA_SAFARI_BA_TR# 6 street lighting pole the pole and foundation is Damaged street pole is to be replaced. damaged pole and accordingly repair the
BA18 & proper Errection of Pole required
damaged. foundation and check the mounts properly.
Civil devence BA6, Police building Better to install new black color 3-meter lighting pols Install the identical pole lights as in
1 BA7 and Adminstration building 28-03-2022 KFCA_SAFARI_BA_TR#12 3-meter ligting pole damaged and need to remove same as installed in front of the mosque BA15. So, it Need Replacement other area inorder to be an identical
BA1 will be easy for us to maintain. view and easy to maintain.
Sub-contractor to be on board to
complete the scope of work, do
Incomplete project, as external contractor not
Last gate Hydrualic bollards and Jaw barriers are not Contractor to complete the project and after T&C to proper testing and comissioning and
4 BA05 Last gate cabins 6/13/2022 KFCA_SAFARI BA_TR# 24 completed the job and barriers not handedover to
working from the beginning handover to safari. then smooth handing over to safari
Safari.
for further operation and
maintenance.
New Toll gate building Project department has installed Install the outdoor type of lights
Bahrain new Toll Gate building Installed light are indoor type, required out door type down
6 2/26/2022 KFCA_SAFARI_BA_TR# 5 indoor lighting at the outdoor space frame and all (21 Down Lights are of indoor but installed outdoor. competible with weather condition
Space frame lighting lights.
Nos.) and all are not working and appropriate IP rating.