TECHNICAL REPORTS

Electrical (SA Side)

Serial Technical Report


Location Technical Report Ref. Technical reports Description Safari Remarks OA Remarks OA Recommendations
No. Date.

Improper and Non-standard Cable Joint Did by For proper Cable Jointing, Sub-contractor
1 Embankment#1,2&3 9/2/2022 KFCA_SAFARI_SA_TR#006 Under Contractor Not under scope of Safari
Contractor required to perform the task

In order to ensure optimal life expectancy


of components, precautions must be taken
to prevent moisture to
form condensation of sensitive electrical and
electronic devices
Recommended to Provide Proper Circulation
inside an enclosure, can lead to the Safari need to seal the panel board properly
Formation of Moisture Inside the Main of the Air Inside the panel so as to avoid any
2 SA-06 Civil defence ( GF) 18/10/2022 KFCA_SAFARI_SA_TR#032 following Issues: and close any type of inlet hole and proper air
Distribution Panel heat exchange and the formation of the
• Increased electrical resistance circulation in the area to avoide condensation.
Moisture inside Panel
• Additional generation of heat
• Rusting of critical electrical components
• Increased risk of Short Circuits
• Dangerous occurrences of arcing and
sparking)

Replacement of Rusted Electrical Main Recommended to Replace the entire Main Contractor to complete the project and after Old Panel Removed, Building Under
3 SA-16 Electrical Room 18/10/2022 KFCA_SAFARI_SA_TR#031
Distribution Panel panel with a new panel. T&C to handover to safari. Renovation

Agreed with Installation of New Fire


Suppression System as the substation is
Shubaily Substation & S-19 Recommended Installation of Gaseous Fire Recommended installation of Gaseous Fire Install a New Fire Suppression System to
4 6/11/2022 KFCA_SAFARI_SA_TR#035 standalone and not in regular monitoring,
Service Building Supressant Agent in Substation Supressant agent in Substations prevent the substation from any incident.
inorder to prevent any incident an auto
supression system should be installed.

Agreed, in dusty field, open airframes or simple


protection models can easily be susceptible to Protection room is recomending for generators
Required to Provide a Protection Room for
SAH3,SAH1 and Main Tool Requirement to Provide a Protection Room for rainwater damage or sand and dust friction as generators are in open dusty field, in order
5 17/05/2022 KFCA_SAFARI_SA_TR#021 Outside Customs Generator (Truck Holding
Gate Outside Customs generator resulting in damage to the engine or individual to prevent the generators and ATS from the
Area)
components and shortening the service life of weather conditions.
the generator.
As the generators at truck holding area are
Generator Already Repaired, Generator
Truck Holding Area , Underload Generator and recommendations running at low load so low cylinder pressure
6 15/03/2022 KFCA_SAFARI_SA_TR#012 Generator Failure & Repair Capacity 35KVA, Required Small Capacity
Kirloskar Generator are valid. May cause the damages to generator. results in poor combustion, decreasing the
(Recommendation)
efficiency of the engine.

During Excavation, a Medium Voltage Cable


MV Switchgear installation is required in was Accidently Cuted by Sub-contractor For future in order to avoid a complete Power
Power Outage from Shubaily Substation due to between Shubaily S/S & SA-20 S/S In order to SRACO by JCB Which caused a Short Circuit Shutdown from Main Sub-Station there must be
7 SA20 Service Building Area 11/5/2023 KFCA_SAF_SA_IR-60
damaged cable avaoid.complete Power Shutdown from Main between SA98 & SA20 & Power Shut off from a MV Switchgear installation required in SA-
Sub-Station there must be an Main Sub-Station Shubaily as well as from 19A S/S.
SCECO

Recommended to Replace the entire Main Contractor to complete the project and after Recommend for installing new Electrical LV
8 SA13 Maintenance Building 6/1/2023 KFCA_SAFARI_SA_TR_058 LV main Panel Body Rusted & Damaged
panel with a new panel. T&C to handover to safari. Main Distribution Panel
Electrical (BA Side)

Better to install new black color 3-meter


Civil devence BA6, Police Install the identical pole lights as in other area
3-meter ligting pole damaged and need to lighting pols same as installed in front of the
1 building BA7 and 28-03-2022 KFCA_SAFARI_BA_TR#12 Need Replacement inorder to be an identical view and easy to
remove mosque BA15. So, it will be easy for us to
Adminstration building BA1 maintain.
maintain.

Sub-contractor to be on board to complete the


Incomplete project, as external contractor not scope of work, do proper testing and
Last gate Hydrualic bollards and Jaw barriers Contractor to complete the project and after
2 BA05 Last gate cabins 6/13/2022 KFCA_SAFARI BA_TR# 24 completed the job and barriers not commissioning and then smooth handing over
are not working from the beginning T&C to handover to safari.
handedover to Safari. to Safari for further operation and maintenance.

Bahrain new Toll Gate New Toll gate building Project department has
Down Lights are of indoor but installed Installed light are indoor type, required out door Install the outdoor type of lights competible with
3 building Space frame 2/26/2022 KFCA_SAFARI_BA_TR# 5 installed indoor lighting at the outdoor space
outdoor. type down lights. weather condition and appropriate IP rating.
lighting frame and all (21 Nos.) and all are not working

At cargo departure due to an accident on the Safari to initiate the process to change the
CARGO DEPARTURE lighting Pole and Foundation need to be repare
4 27-Feb-22 KFCA_SAFARI_BA_TR# 6 street lighting pole the pole and foundation is Damaged street pole is to be replaced. damaged pole and accordingly repair the
BA18 & proper Errection of Pole required
damaged. foundation and check the mounts properly.

Change the halogen by LED according to


Street lighting in front of the In the South VIP Street lighting is not working Replaced by safari the busted halogen.
5 27-Mar-22 KFCA_SAFARI_BA_TR#11 Recomding to replace with LED energy conservation policy as well. Infuture any
South VIP building from the long time. Recomending to replace with LED.
busted light replace with appropriate LED light.
TECHNICAL REPORTS

Electrical (BA Side)

Serial Technical Report


Location Technical Report Ref. Technical reports Description Safari Remarks OA Remarks OA Recommendations
No. Date.

Civil devence BA6, Police building Better to install new black color 3-meter lighting pols Install the identical pole lights as in
1 BA7 and Adminstration building 28-03-2022 KFCA_SAFARI_BA_TR#12 3-meter ligting pole damaged and need to remove same as installed in front of the mosque BA15. So, it Need Replacement other area inorder to be an identical
BA1 will be easy for us to maintain. view and easy to maintain.

Bahrain Old and new Toll Gate


2 23-Apr-22 KFCA_SAFARI_BA_TR#17 Old Toll gate building ATS is not working Done by Contractor Done
building and Cabins

After testing, comissioning and


completion of warrenty period
BA-Street lighting not working belongs to Transformer 12
3 Bahrain bridge Transformer # 12 23-Jan-22 KFCA_SAFARI_BA_TR# 1 Waiting for Contracor Under contractor scope handover to Safari, so safari will take
on the Bahrain bridge
care of any type of maintenance
activity.

Sub-contractor to be on board to
complete the scope of work, do
Incomplete project, as external contractor not
Last gate Hydrualic bollards and Jaw barriers are not Contractor to complete the project and after T&C to proper testing and comissioning and
4 BA05 Last gate cabins 6/13/2022 KFCA_SAFARI BA_TR# 24 completed the job and barriers not handedover to
working from the beginning handover to safari. then smooth handing over to safari
Safari.
for further operation and
maintenance.

The panel is very old and to be changed, as the sequence of


operation is not much advance as other panels have and
Very old MUSAID 220V low voltage switchgear need to Required upgradation of panel and inner
also the matter of spareparts availability. Moreover, no any Recommended to upgrade the switch
5 BA19 Service Building 6/19/2022 KFCA_SAFARI_BA_TR# 25 change by 380V switch gear with new ATS and Bus components. There is an isue of spare parts
emergency breaker available for the servers of immigration gear and ATS panel.
copupler availability.
and custom cabins's server. there is no any space for spare
breakers and spare breaskers are not available

New Toll gate building Project department has installed Install the outdoor type of lights
Bahrain new Toll Gate building Installed light are indoor type, required out door type down
6 2/26/2022 KFCA_SAFARI_BA_TR# 5 indoor lighting at the outdoor space frame and all (21 Down Lights are of indoor but installed outdoor. competible with weather condition
Space frame lighting lights.
Nos.) and all are not working and appropriate IP rating.

Safari to initiate the process to


At cargo departure due to an accident on the street lighting Pole and Foundation need to be repare & proper change the damaged pole and
7 CARGO DEPARTURE BA18 27-Feb-22 KFCA_SAFARI_BA_TR# 6 Damaged street pole is to be replaced.
lighting pole the pole and foundation is damaged. Errection of Pole required accordingly repair the foundation and
check the mounts properly.

Change the halogen by LED


according to energy conservation
Street lighting in front of the South In the South VIP Street lighting is not working from the Replaced by safari the busted halogen.
8 27-Mar-22 KFCA_SAFARI_BA_TR#11 Recomding to replace with LED policy as well. Infuture any busted
VIP building long time. Recomending to replace with LED.
light replace with appropriate LED
light.