You are on page 1of 1

3.

3 Service Process
3.3.1 Detailed Description of the Process
3.3.2 Input-Output Flow Chart
3.4 Quality Management Process
3.4.1 Quality Control Requirements
3.4.2 Quality Procedures
3.5 Plant Size and Production Schedule
3.5.1 Schedule
3.5.2 Service Capacity Plan
3.6. Manpower Requirement
3.6.1 Organizational Chart
3.6.2 Headcount
3.6.3 Job Description & Job Specification

3.7 Machine Requirements and Specifications


3.7.1 Primary Machines and Equipment (could be Classroom Equipment)
3.7.2 Auxiliary Tools/ Equipment (could be Department Office Equipment)
3.7.3 Safety Gadget and Sanitary Tools (could be Laboratories Equipment)
3.7.4 Repair and Maintenance for Machines and Equipment
3.9 Plant Layout
3.9.1 Building Structure
3.9.2.1 Bill of Materials for the Building Structure
3.9.2 Floor Plan with Flow of Production
3.9.3 Plumbing and Electrical Layout
3.9.4 Bill of Materials for Construction
3.9.5 Summary of Bill of Materials
3.9.6 Utilities
3.9.6.1 Electrical Consumption
3.9.6.2 Water Consumption
3.9.6.3 Telephone and Internet Consumption
3.10 Inventory Management
3.11 Pre-Operation Activities & Timeline
3.12 Evaluation