Professional Documents
Culture Documents
Dawasa Depot &park and Ride
Dawasa Depot &park and Ride
(BRT) Infrastructure-Phase 4
gravelly soil
1.0
16
3.0 SB 27 0.0
brownish SAND
3.2m
4.0
D
whitish/pale orange
SAND SB 18
5.0
6.0 SB 21
WL=groundwater level DS= Disturbed sample
SPT=Standard Penetration Test SB=Split Barrel Sampler
Detailed Engineering Design, Preparation of Bidding Document and Supervision of Works for Dar es Salaam Bus Rapid Transit
(BRT) Infrastructure-Phase 4
SB 26 0.0 13
greyis brown SAND
2.0
3.0 SB 13
whitish/yellowish
green SAND
4.0
SB 16
D
5.0
6.0 SB 27 0.0 18
WL=groundwater level DS= Disturbed sample
SPT=Standard Penetration Test SB=Split Barrel Sampler
Detailed Engineering Design, Preparation of Bidding Document and Supervision of Works for Dar es Salaam Bus Rapid Transit
(BRT) Infrastructure-Phase 4
D
1.0 blackish red gravelly
soil
SB 18
2.0
3.0 SB 32
pale grey/whitish
silty SAND
SB 24 12.3 16
5.0
dusky grey silty
SAND
6.0 SB 36
WL=groundwater level DS= Disturbed sample
SPT=Standard Penetration Test SB=Split Barrel Sampler