Professional Documents
Culture Documents
Submitted by:
SGC LIMITED
Plot no. 601, Sam Nujoma Road; Adj. Mlimani City
P.O. Box 34402, Dar es Salaam
Contact: +255 784 458089 and +255 767 036546
Website: www.sgc.co.tz; E-mail: info@sgc.co.tz 12 th May 2019
1. SECTION 1: FORMS
1
(b) Zanzibar Business Registration Certificate
2
(c) Certificate of Engineer Registration
3
(d) Certificate of Engineer Registration,Zanzibar
4
(e) Annual Practicing Certificate for Year 2019
5
(f) Current Business Licence
9
Form B: Price Schedule Form
GEOTECHNICAL INVESTIGAATIONFOR THE PROPOSED CONSTRUCTION OF GRADE
SEPARATION AT KILWA ROAD & CHANG'OMBDE JUCTIONS
Item Description Quantity Unit Rate Amount (Tsh)
A: REMUNERATION COSTS
STAFFING
A1 Senior Geotechnical Engineer 15 Days 200,000 3,000,000.00
A2 Senior Driller/Supervisor 30 Days 120,000 3,600,000.00
A3 5- Drillers 150 Nos 80,000 12,000,000.00
A4 1-Driver 30 Days 60,000 1,800,000.00
10
G LABORATORY TESTING
Soil Classification Tests
G1 Natural Moisture Content 64 Nos 25000 1,600,000.00
G2 Combined Sieve Analysis 128 Nos 45000 5,760,000.00
G3 Atterberg Limits 64 Nos 45000 2,880,000.00
G4 Specific Gravity by Pycnometer 32 Nos 35000 1,120,000.00
G5 Bulk Density 32 Nos 25000 800,000.00
Permeability Test
G10 Field (rising water level) Permeability Test Rate Only Nos 100,000
G11 Laboratory (falling head) permeability test Rate Only Nos 120,000
I, the undersigned, certify that I am duly authorized by SGC LIMITED to sign this quotation and bind SGC
LIMITED should ZBA accept this quotation:
Signature:
11
2. SECTION 2: TECHNICAL PROPOSAL
This section of the proposal presents the Consultant’s detailed approach, methodology and work plan
for Consultancy Services for Geotechnical Investigation for proposed Construction of grade separation at
Kilwa/Mandela road junction and Nyerere/Chang’ombe junction. The approach, methodology and work
plan have been developed to respond fully to the Terms of Reference of the project. The presentation
begins with an elaboration of the consultancy assignment objective followed by a description of our
general approach, detailed methodology statements, and work plan for performing the assignment.
The main objective of the assignment is to undertake Consultancy Services for carrying out Geotechnical
Investigation for the Proposed Construction of grade separation at Kilwa/Mandela road junction and
Nyerere/Chang’ombe junction. The expected works for the service will include ground investigation by
drilling boreholes for the purposes of understanding the ground behaviours/characteristics and
parameters to withstand the building loads to be built on the proposed site.
As per requirement of the TOR/discussion, the Consultant shall satisfy himself thoroughly as to the
nature and scope of the works, all risk associated with works, safety information available and liaise to
the client. The consultant’s duties and responsibilities will involve the following sub-tasks:
The consultant will establish site for equipments and staff to ensure the works are properly controlled.
One set of equipment shall be mobilized in the drilling sites; which is rotary machine HF200S drilling rig.
Additional auger boring machine would be supplemented to fasten the works. Two (2) key staff
(Geotechnical Engineers), one (1) supervisor and (5) drillers will be mobilized for smooth execution of
the assignment.
The consultant will commence the ground investigation according to current codes of practice BS EN
1997-2:2007 geotechnical design- for ground investigations testing and BS EN 1997-1:2004 Geotechnical
design general rules. The laboratory testing may be tested according to BS 1377:1990 or current code
above depending on laboratory experience.
12
Task 3: Drilling of Boreholes
The consultant will drill a total of 4 boreholes within the vicinity of the Site boundary. The drilling of all
boreholes is expected to be terminated at a depth of 25m from the ground level according to ToR.
During the drilling process, the profile will be recorded as the works progress. Where collapse is likely to
happen, the installation of polymers or bentonite seal and reduce casing will be done. Where rock
encountered the drilling shall continue to agreeable depth, measuring SPT and if necessary cored
sample for determination of the quality.
The consultant will take samples as the drilling is progressing. The samples will be taken according to BS
EN 1997-2:2007 geotechnical design- for ground investigation and testing as follows;
In non-cohesive soils; small disturbed sample will be collected on entering the stratum and then
SPT will be performed at 1.5m intervals throughout stratum. Also small disturbed sample shall
be taken by the shoe during the SPT.
In cohesive soils; small sample shall be taken on entering stratum and then U100 sample. The
SPT tests and U100 samples shall also be collected at 2.0m intervals. Also small undisturbed
samples will be taken from SPT shoe as required. For poor U100 recovery, additional U100 will
be taken according to the specification.
The consultant shall record the water level when encountered, the records of water rise and fall
after completion of drilling will commence. The recording interval of 12 hours will be done for
24hours.
Groundwater samples will be taken from each borehole during rise for testing; the samples will
be taken with plastic containers (bottles), labeled and marked before transported to the
laboratory.
For the bed rock, drilling will continue as agreed with the Engineer and core recovery will be
described for rock quality designation. The point load test of the core will be done in the
laboratory.
The samples from each borehole will be tested in accordance to BS EN 1997-2; 2007 or BS
1377:1990 as follows;
o Classification Tests
Natural Moisture Content
Grading analysis
Atterberg Limits
Specific Gravity
Bulk density
o Strength and Deformation Tests
Unconfined Consolidation tests
Unconsolidated Undrained (UU)–quick Undrained Triaxial for cohesive soils
Consolidated Drained (CD) Shear strength Tests for non-cohesive soils
13
o Shrinkage and Swelling Characteristics for cohesive soils only
Linear shrinkage tests
Free swell tests
o Chemical tests of water
pH
Chloride content
Sulphate content
o Rock samples
Point load
RQD
Classification
The samples shall be tested at Dar es Salaam laboratory depending on the work magnitude of
the laboratory. The consultant has earmarked some of the laboratory expected to be
outsourced the testing of the samples;
(i) Soils–Drilling and Dam Construction Agency (DDCA),Ministry of Water
(ii) Water-University of Dar es Salaam, Civil and Structural department Laboratory
Task 5: Reporting
The consultant shall prepare the reports in A4 format as follows;
Draft Ground Investigation Report
The report will consist of all information obtained in the site and laboratory test results which were
obtained in the boreholes. Two (2) copies of the report will be submitted after two (3) weeks on
completion of site works for comment from the client.
Our work plan for carrying out this assignment is given in work schedule below. It is in the form of bar
chart indicating clearly the estimated duration and probable timing of the various activities and tasks
already described in the preceding sections.
The assignment is estimated to take about 1 month,i.e. (30) calendar day for field works and Fourteen
(14) calender days for laboratory testing from the commencement to submission of draft final design
report. The proposed work plan is consistent with both the technical approach and methodology. In
carrying out the assignment the consultant shall adhere to the time schedule of completion and
submission of projects reports except where delay is caused by laboratory. It is summarized for each site
as follow;
i. Introduction
SGC Limited is registered firm in the United Republic of Tanzania on September 17th, 2014 with a
certificate of Incorporation No. 111325. Our multidisciplinary portfolio of specializations includes
geotechnics and geotechnical engineering services, hydrogeology and ground water exploration, civil
and structural engineering, Marine and costal engineering; process and piping, environmental
engineering and management services; Agricultural infrastructures, urban infrastructures development,
project & construction management, institutional &corporate management. The firm offers and delivers
full range of professional engineering and management services. These encompass project
identification, pre-feasibility studies, properties and site appraisals, preliminary to detailed engineering,
construction management, procurement, audit, forensic investigation and inspection of infrastructures,
quality control and personnel training.
SGC ltd is private owned and was registered by engineer’s registration board with registration number
183 on November 28th 2014. The firm’s mission is to be the most successful engineering firm at
delivering the best engineering and management services for all sectors, meeting client expectations of
highest quality and competitive pricing from concept planning through to completion, with a highly
practical experience and skilled professional team working in the highest ethics and respect the rights
and dignity of others.
Salvatory Faustine Lyakurwa, MSc BSc CEng MIET; has more than 15 years’ experience in Civil,
Structural and Geotechnical Engineering. He is Geotechnical and Materials Engineer specialist and highly
15
experienced in the interpretation of site investigation data, in the design of contaminated land
remediation schemes and landfill gas protection measures. He has worked in the design and supervision
of structural and civil engineering projects for more than 13 years since graduation. He has also involved
in the investigations of failures, evaluation of completed projects and technical and procurement audit
for infrastructure projects for more than 10 years.
Alois Emilian Mpunga, MSc BSc CEng; He is Principal Highway Engineer with more than 40 years’
experience in in the analysis, design and surveys of Traffic, and Pavement Engineering. He has particular
skills in the assessment and analysis of highway condition survey and traffic engineering and marine
structures. Eng. Mpunga expertise includes the skills of Civil Engineering in various aspects of
engineering services include building design, rehabilitation projects (roads, ports and water) and project
supervision.
Ladygrace Benedict, BSc; She specializes in Geology and Environmental Management with over 10
years’ experience. Her expertise includes contaminated land projects and environmental auditing. Her
expertise includes quantitative risk assessment for soils, groundwater and ground gases, and the
provision of specialist waste management advice with respect to contaminated soils.
Gastone Herman Shanua, MBA BSc; Eng; He is a specialist in mining engineering, having worked in
consultancy and contracting on major mining companies within Tanzania and internationally with over
12years experience. His experience covers the technical and managerial aspects of consultancy including
the mining planning and investigation, pit design and optimization, waste dump and haulage design,
mining risk assessment and economic evaluation.
Elizabeth Marco Temu, MA BA; She holds Master of Arts in Sociology. Ms. Temu is an experienced
gender specialist, rural sociologist, youth development specialist, trainer and researcher with over 30
years of professional experience in private and public sectors. Her expertise includes infrastructure
development, rural socio-economic empowerment, identification and formulation of projects, natural
resource management and community development empowerment.
16
responsible to their section and department heads for quality and conformity with design standards and
practices adopted.
Board of Directors
Managing Director
17
Assignment name: Approx. value of the contract (in US$, TZS or
Geotechnical Investigations for Proposed 9 Euro): USD:280,000.00:
storey building for Tindwa medical Hospital at
Donge, Tanga City Council
Assignment Location Duration of assignment (months): 2 Months
within country: Tanga, Tanzania
Name of Client: Tindwa Medical Health Services Professional Staff provided by your
P. O. Box 31409 Dar es Salaam Organisation:
No of Staff: 2
Start Date Completion Date
(Month/Year):Jan,201 (Month/Year):March,20 No of Person-Months: 2
9 19
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed:
Salvatory Lyakurwa : Senior Geotechnical Engineer
Richard Seiya : Geotechnical Engineer
The assignment involves carrying out Geotechnical Investigations of building sites. A total of 6
boreholes were drilled to understand the ground conditions of the site. Water monitoring was done
by taking measurements after drilling for a duration of 24 hours.
18
Assignment name: Approx. value of the contract (in US$, TZS or
Geotechnical Investigations for Rehabilitation, Euro): USD:280,000.00:
Expansion and Supervision of Sunflower Oil
Factory Building and Maize Milling Factory in
Dodoma, Client:
Assignment Location Duration of assignment (months): 2 Months
within country: Dar es Salaam,Tanzania
Name of Client: The Cereals and other Produce Professional Staff provided by your
Board of Tanzania. (CPB) Organisation:
P. O. Box 337, Dodoma
No of Staff: 2
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed:
Salvatory Lyakurwa : Senior Geotechnical Engineer
Peter Mshigwa :Geotechnical Engineer
The assignment involves carrying out Geotechnical Investigations of building sites. A total of 6
boreholes were drilled to understand the ground conditions of the site. Water monitoring was done
by taking measurements after drilling for a duration of 24 hours.
19
Assignment name: Approx. value of the contract (in US$, TZS or
Geotechnical Investigations for Feasibility Euro): USD:280,000.00:
Study,Detailed Engineering Design and
preparation of Tender Documents for
Construction of BRT phase 5 & Hananasif Bridge
(Port Access & Kigogo-Tabata Segerea 26km)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed:
Salvatory Lyakurwa : Senior Geotechnical Engineer
Peter Mshigwa :Geotechnical Engineer
Richard Seiya : Geotechnical Engineer
The assignment involves carrying out Geotechnical Investigations of bridges along Port Access road
(Tabata relini (25m),Tabata Matumbi (20m), Hananasif bridge (450m span) and proposed Bus
stations, carry out Materials investigations and quality control for construction, Prepare
geotechnical investigation report and materials report
20
Assignment name: Approx. value of the contract (in US$, TZS or
Off – shore Geotechnical Investigation for Euro): USD:150,000.00:
Feasibility Study,Detailed Engineering Design
and preparation of Tender Documents for
Construction of Boat Ramp and Associated
Infrastructures at Deep Sea, Fumba Site-
Zanzibar
Name of Client: Deep Sea Fishing Authority Professional Staff provided by your
P.O Box 56,Zanzibar Organisation:
Tel. no.: +255 732 947017
Start Date Completion Date No of Staff: 5
(Month/Year):May,201 (Month/Year):Sept,201
7 7 No of Person-Months: 5.5
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed:
Salvatory Lyakurwa : Senior Geotechnical Engineer
Peter Mshigwa :Geotechnical Engineer
Richard Seiya : Geotechnical Engineer
Detailed Narrative Description of Project:
The assignment involves carrying out topographical survey, Geometrical design of the ramp
alignments, carry out Marine Geotechnical Investigation of ramp and building sites, carry out
Materials investigations and quality control for construction, design of workshop building; design of
surveillance tower and changing rooms and preparation of tender documents.
Offshore geotechnical investigations, carry out materials investigations for earthworks and
embankment constructions; preliminary design/propose type of foundations
21
Assignment name: Approx. value of the contract (in US$, TZS or
Geotechnical Investigation for Detailed Euro): TZS:175,000.00
Engineering Design, Preliminary Environmental
and Social Impact Assessment for Temeke
Municipal Roads and upgrading of roads and
Storm water drainages into Tarmac roads
(14.5km) in Temeke Municipal Council
Assignment Location Duration of assignment (months): 3 Months
within country: Dar es Salaam,Tanzania
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed:
Flex Mtui :Team Leader/Senior Highway Engineer
Salvatory Lyakurwa : Senior Geotechnical/Pavement Engineer
Peter Mshigwa : Materials Engineer
Richard Seiya : Geotechnical Engineer
Detailed Narrative Description of Project:
Data collection, carry out topographical survey, traffic survey; geometrical design of road
alignments, geotechnical and materials investigations of major structures and road alignment,
hydrologic studies, hydraulic design, Preliminary Environmental and Social Impact Assessment,
design of storm water drainage, pavement and preparation of tender documentation.
Detailed Description of Actual Services Provided by your Staff:
Data collection, carry geotechnical investigations of Mashine ya maji bridge along Mtoni-Yombo
road , Carry out materials investigation for road construction, propose design of foundations
22
Assignment name: Approx. value of the contract (in US$, TZS or
Construction Supervision and Contract Euro): TZS:1,650,000,000.00
management for Upgrading of Bwanga-Uyovu
Road (45km) to Bitumen Standard
Assignment Location Duration of assignment (months): 16 Months
within country: Geita Tanzania
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed:
Hussein Rajab :Resident Engineer
Salvatory Lyakurwa : Senior Materials/Pavement Engineer
Kashaga Rwegasira :Land/Topographical Surveyor
Donatus Martin :Bridge/Drainage Engineer
Juma Msonge :Highway engineer
Detailed Narrative Description of Project:
Supervision of construction works, administering contractor’s works, cost and quality control of
works, supervising quality assurance programme and certifications of the completion works.
23
Assignment name:
Geotechnical Investigation for bridges and Approx. value of the contract (in US$, TZS or
Pavement Investigations along Shinyanga – Euro): TZS: 200,000,000.00
Bubiki Regional Road (35km) to Bitumen
Standard in Shinyanga Region
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed:
Salvatory Lyakurwa : Senior Geotechnical/Pavement Engineer
Peter Mshigwa : Materials Engineer
Richard Seiya : Geotechnical Engineer
24
Assignment name: Approx. value of the contract (in US$, TZS or
Consultancy services for Carrying out Euro): TZS: 104,141,675.00
Geotechnical Survey for Tanzania Sea Walls
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed:
Salvatory Lyakurwa : Senior Geotechnical Engineer
Peter Mshigwa :Geotechnical Engineer
Walter Shio : Geotechnical Engineer
Geofrey Mashauri :Topographical Surveyor
25
Assignment name: Approx. value of the contract (in US$, TZS or
Geotechnical Investigation for the Detailed Euro): TZS:420,000,000.00
Design for Storm water drainages and Tarmac
roads (13.47km) including Environmental and
Social Impact Assessment in Tabora Municipality
Assignment Location Duration of assignment (months): 4 Months
within country: Tabora, Tanzania
26
Assignment name: Approx. value of the contract (in US$, TZS or
Geotechnical Investigations for Feasibility Study Euro): TZS:500,000,625
and Preliminary Design for New Salender Bridge
(1.03km Bridge + 5.87km to Dual Carriageway
Assignment Location Duration of assignment (months): 6Months
within country: Dar es Salaam, Tanzania
27
Assignment name: Approx. value of the contract (in US$, TZS or
Geotechnical Investigations, Detailed Design and Euro): USD:700,000.00
Preparation of Tender Documents for
Construction of Storm water drainages and
Infrastructures for One Stop Boarder Post at
Tunduma-Tanzania/Zambia boarder
Assignment Location Duration of assignment (months): 8 Months
within country: Tunduma, Mbeya
28
Assignment name: Approx. value of the contract (in US$, TZS or
Geotechnical Investigation for construction of Euro): TZS:228,000,000.00
26 storey BRELA Building on plot no. 24,Ada
Estate Kinondoni
Assignment Location Duration of assignment (months): 6 Months
within country: Kinondoni,Dar es Salaam
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed:
29
Assignment name: Approx. value of the contract (in US$, TZS or
Consultancy services for design of Storm water Euro): TZS:412,000,000.00
drainage, sewerage system for abattoir and
stabilization pond for processing waste from
animals in Singida Municipality
Assignment Location Duration of assignment (months): 6 Months
within country: Singida, Tanzania
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed:
Emmanuel Kessy :Project Director
Chazi Rwakanadi :Team Leader/Architect
Salvatory Lyakurwa : Senior Geotechnical/Pavement Engineer
Justine Kessy : Drainage/Structural Engineer
Josephat Mrutu : Hydrologist
Charles Letinani Swai : Environmentalist
Amedaus Chaky : Quantity Surveyor
30
Assignment name: Approx. value of the contract (in US$, TZS or
Consultancy services for Detailed Engineering Euro): US$:185,500.00
Design and Supervision of Construction for
Storm water drainages, sewerage system,
composing sewer lines, oxidation ponds and
sludge management facilities for the Geita Gold
Mine
Assignment Location Duration of assignment (months): 6 Months
within country: Geita, Tanzania
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed:
Senior Drainage Engineer :Alois Mpunga
Salvatory Lyakurwa : Senior Geotechnical/Materials Engineer
Ndagara Ishengoma : Topographical Surveyor
Josephat Mrutu : Hydrologist
Charles Letinani Swai : Environmentalist
31
Assignment name: Approx. value of the contract (in US$, TZS or
Preventive technical audit of road maintenance Euro): TZS 214,000,000.00
works being executed by Tanzania National
Roads Agency (TANROADS), PMO –PMORALG
for the FY 2013/14 and 2014/15
Assignment Location Duration of assignment (months): 3 Months
within country: Geita,Mara and Kagera regions
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed:
Salvatory Lyakurwa : Team Leader/Pavement Engineer
Seleman Hamduni :Technical Auditor/Materials Engineer
Peter Mshigwa : Technical Auditor/Bridge Engineer
32
Curriculum Vitae for Some of the Key Staff
1. DETAILED CURRICULUM VITAE FOR SALVATORY LYAKURWA
1. Full Name Salvatory Faustine LYAKURWA
2. Profession Civil/Geotechnical Engineer
3. Current Position: Director/Principal Geotechnical Engineer,SGC Limited
4. Date of birth: 09th April 1975
5. Nationality: Tanzanian
6. Membership of Professional Registered as Consulting Engineer, Engineers
Society: Registration Board [ERB] Tanzania, Reg. No. Cons No. 250
Registered as Professional Engineer, with Engineers
Registration Board [ERB] Tanzania, Reg No. 2677
Corporate Member, Institution of Engineers Tanzania
(M. 1278)
7. Education: M.Sc. (Geotechnical Engineering & Management ),
University of Birmingham, United Kingdom, (Sept 2012 –
October, 2013)
Postgraduate Diploma in Procurement & Supply,
Institute of Procurement and Supply, Dar es Salaam (Sept 2009-
Sept,2011)
B.Sc. (Civil Engineering), University of Dar es Salaam,
Tanzania
( Sep1998– June 2002)
8. Other Training: Advanced Computer Course for structural analysis software by
BICO – Dar es Salaam 2008
9. Languages: Languages Speaking Reading Writing
Swahili Mother Mother Mother tongue
tongue tongue
English Excellent Excellent Excellent
10. Countries of Work Tanzania, Rwanda and Uganda
Experience:
33
Positions held: Senior Civil/Materials Engineer
From [Year]- to [Year] March 2003 – March 2006
Employer: Norman & Dawbarn Consult Ltd
Positions held: Civil Engineer
From [Year]- to [Year] July 2002– March 2003
Employer: Kolila Construction Company Ltd
Positions held: Assistant Civil Engineer
12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:
Eng. Lyakurwa is a Principal Geotechnical Engineer with more than 15years of experience in the
Geotechnics, Soil and Materials Investigations, Pavement Design and Supervision of Highway/Road
Engineering projects, Procurement and Performance Audit of the completed and on-going projects
and Supervision of Civil Engineering projects in East Africa. He has attained M.Sc. (Geotechnical
Engineering & Management) at University of Birmingham, United Kingdom as specialised degree;
Postgraduate Diploma in Procurement and Supply at Institute of Procurement and Supply,Dar es
Salaam and B.Sc. Engineering at University of Dar es Salaam. He has performed a number of
Geotechnics, Soils and Materials/Pavement Engineering in the design and supervision of various
projects as summarised below;
Consultancy Services for field assessment and preparation of tender documents for the track
works and maintenance contracts of Dar-Isaka (975km) along railway central corridor.
Provision of Consultancy services for Supervision of upgrading of Mwigumbi-Maswa road
50.3km to bitumen standard.
Provision of Consultancy services for Supervision of upgrading of Bwanga-Uyovu road 45km to
bitumen standard.
Geotechnical Investigation for Tanzania Sea Wall Projects Sites (Unguja, Pemba, Pangani,
Tanga Ocean road and Kigamboni, Dar es Salaam.
Provision of Consultancy Services for supervision of upgrading of roads in Revolutionary
Government of Zanzibar to bitumen standard (52.3km) ; Mkwajuni – Nungwi (17.2km),
Pongwe - Matemwe (21.7km ) and Paje – Pingwe (13.4km)
Provision of Consultancy services for supervision of upgrading of Morogoro town roads
(11.1km) to Bitumen standard (Kigurunyembe- Forest road (5km), Station road (2.9km) and
Mazimbu road (3.2km).
Provision of Consultancy Services for supervision of routine maintenance works along
Mbamba Bay-Lituhi Road (107km) under RUSIRM project/ European Development Fund
&EDF.
Provision of Consultancy Services for Supervision of Construction for Kamwana Bridge along
Kanyambogo - Ibuga Road; Routine Maintenance along Kanyambogo - Ibuga road (20km)
and Nyakahama-Ruhanga (20km) in Muleba District and different Coffee rural roads in
Bukoba and Karagwe districts under STABEX /European Development Fund.
Provision of Consultancy services for supervision of rehabilitation and upgrading of Muhimbili
University College of Health Science (MUCHS) Student’s Hostel at Chole road-Dar es Salaam
Provision of consultancy Services for supervision of Construction & Rehabilitation of First
Health Facilities at Dar es Salaam (Ilala, Temeke & Kinondoni), under Ministry of Health/
AfDB).
Provision of Consultancy services for supervision of rehabilitation of Ifakara – Mahenge road
(67km), construction of forest escarpment to bitumen standard (15km).
Provision of Consultancy services for Feasibility Study and Preliminary design of New Salender
34
Bridge in Dar es Salaam (1.0km bridge + 7.0km dual carriageway approach roads)
Provision of Consultancy Services for Detailed Engineering Design and Preparation of Tender
Documents for Upgrading of Shinyanga – Bubiki (36km) road to Bitumen Standard.
Provision of Consultancy Services for Feasibility Study, Detailed Engineering Design and
Preparation of Tender Documents for Upgrading of Kidatu – Ifakara – Lupiro – Malinyi –
Londo – Lumecha Road (512 Km) to Bitumen Standard.
Provision of Consultancy Services for Feasibility Study, Environmental and Social Impact
Assessment, Detailed Engineering Design and preparation of Tender documents for upgrading
of Loliondo Mto wa Mbu (213km)
Provision of Consultancy Services for Environmental and social Impact assessment, detailed
design of rehabilitation of Mafinga -Igawa (142km) road in Iringa and Mbeya Region
Provision of Consulting services for design of 42.9km of Bus Rapid Transit System Phase 2 & 3
in Dar es salaam City
Provision of Consultancy services for detailed design and preparation of tender documents of
Mandiga-Manyovu (60km) to bitumen standards.
Provision of Consultancy services for design of upgrading of University of Dar es Salaam -
Changanyikeni – Kimara Korogwe road (3.5km) and Kimara Korogwe- Makoka-External (9km)
to alleviate Traffic Congestion in Dar es Salaam
Provision of Consultancy services for Consultancy services for detailed design of upgrading of
Mziha – Magole road (Mziha-Turiani 36km Section) to bitumen standard
Provision of Consultancy Services for the Engineering and Performance Audit of Construction
Works Undertaken by Uganda National Roads Authority (UNRA) in the FY 2015/2016 in the
Government Republic of Uganda (Mbarara Bypass (41km),Northern Bypass (20km);Nansana-
Busunju (47.6km);Kiryandongo-Kamdini (59km);Nebbi-Pakwach (54.25km);Construction of
Kabaale Bridge; Construction of Leresi Bridge and Construction of Apak bridge.
Provision of Consultancy Services for the Engineering and Performance Audit of Construction
Works Undertaken by Uganda National Roads Authority (UNRA) in the FY 2014/2015 in the
Government Republic of Uganda; Kamwenge-Fortportal (67km); Mpigi-Kanoni road (64km);
Mitaano Bridge and Ntungwe Bridge.
Provision of Consultancy Services for Post and preventive Technical Audit for Maintenance
Works executed by TANROADS,PMO-RALG and MoW for Financial Years 2013/14 and
2014/15
Provision of Consultancy Services for Post and preventive Technical Audit for Maintenance
Works executed by TANROADS,PMO-RALG and MoW for Financial Years 2009/10 and
2010/11
Provision of Consultancy services for development of Perimeter Irrigated by Pumping on Lake
Cyambwe under Ministry of Agriculture and Animal Resources (MINAGR), The Government of
Republic of Rwanda, 2008.
Provision of Consultancy Services for Assessment of Local Council under Local Government
Capital Development Grants for FY2006/07 to FY 2011/12
Provision of Consultancy Services for Technical Audit for projects executed by Ministry of
Transport and Communication, The Revolutionary Government of Zanzibar for FY 2008/09
and FY2009/10
Provision of Consultancy Services for Value for Money Audit for Local Government projects
financed by Capital Development Grants for FY 2009/10 and FY 2012/13
Provision of Consultancy Services for Engineering Audit and Evaluation of the executed works
along Nangurukuru – Mbwemkuru Design-Build Road Project (96Km).
35
Name of assignment or project: Consultancy services for supervision of upgrading of Mwigumbi-
Maswa road 50.3km to bitumen standard.
Year: September – November,2016
Location: Simiyu, Tanzania
Client: TANROADS, HQ
Main project features: Road upgrading project to bitumen standard
Positions held: Senior Materials/Geotechnical Engineer
Activities performed: Responsible for supervision of field and laboratory testing during
execution of works and quality control of the projects; Supervision
and quality control of borrow pit materials investigation and stone
quarry; certification of field and laboratory test results for final
payments; certify the earthworks and crushed stone materials for
pavement construction; supervise and control the quality of the
crusher operations in the production of chippings for DBST,CRR for
base course and mix design for sub base materials and preparation
of quality control programme and reports for stockpiled materials,
borrow pits and construction works.
Name of assignment or project: Consultancy Services for field assessment and preparation of
tender documents for the track works and maintenance contracts
of Dar-Isaka (975km) along railway central corridor.
Year: April - September, 2016
Location: Central Railway Corridor(Dar-Tabora-Isaka)
Client: Reli Asset Holding Company Limited (RAHCO)
Main project features: Soils and Materials Investigations for Design and Construction of
the project.
Positions held: Senior Materials Engineer
Activities performed: Supervise field investigations of borrowpits for earthworks and
stone rocks for aggregates. Supervise sampling of the investigated
materials for laboratory tests; supervise laboratory testing;
interpretation of the laboratory results, analysis and preparation of
Soils & Materials Report.
Name of assignment or project: Consultancy Services for the Engineering, Procurement and
Performance Audit of Construction Works undertaken by Uganda
National Roads Authority (UNRA) in the FY 2015/2016
Year: November, 2015 - to April, 2016
Location: Various roads in the Republic of Uganda
36
Client: The Office of Auditor General (OAG)
Main project features: Engineering, Procurement and Performance audit of projects
namely; Uganda (Mbarara Bypass (41km),Northern Bypass
(20km);Nansana-Busunju (47.6km);Kiryandongo-Kamdini
(59km);Nebbi-Pakwach (54.25km);Construction of Kabaale Bridge;
Construction of Leresi Bridge and Construction of Apak bridge.
Positions held: Auditor (Materials/Geotechnics Specialist)
Activities performed: Evaluation the compliance of procurement process with public
procurement Act; Assess the contract documents if complied with
design recommendations, supervising the field testing to verify the
quality of the completed works, review the geotechnical
investigation reports and assess the integrity of the pavements and
foundation design, review the compliance of payments with specs.
Name of assignment or project: Feasibility Study, Detailed Engineering Design and Preparation of
Tender Documents for Upgrading of Shinyanga – Bubiki Regional
Road (36 Km) to Bitumen Standard
Year: January 2016 to June 2016
Location: Shinyanga Region
Client: Regional Manager,TANROADS Shinyanga
Main project features: Feasibility Study, detailed engineering design and preparation of
tender documents
Positions held: Senior Geotechnical/Materials Engineer
37
Activities performed: Supervise field investigation, geotechnical investigation, laboratory
testing, data compilation, analysis and preparation of Soils &
Materials Report and Pavement design and preparation of tender
documents
Name of assignment or project: Consultancy Services for the Ground Investigation for Tanzania Sea
Wall sites along Indian Ocean
Year: January – April,2016
Location: Various Locations along the Indian Ocean, Tanzania regions
Client: The United Nations Office of Project Services (UNOPS).
Main project features: The project consists of five major sites namely; Kigamboni and
Ocean road, Dar es Salaam; Kilimani, Zanzibar; Pangani, Tanga and
Kisiwa Panza, Pemba.
Positions held: Principal Geotechnical Engineer
Activities performed: Conducting ground Investigation of the proposed sites; Supervising
field testing, sampling and laboratory testing. Preparation of
geotechnical reports and interpretation of ground results for
structural engineer design.
Name of assignment or project: Consultancy Services for the Engineering, Procurement and
Performance Audit of Construction Works undertaken by Uganda
National Roads Authority (UNRA) in the FY 2014/2015
Year: October – December,2015
Location: Various roads in the Republic of Uganda
Client: The Office of Auditor General (OAG)
Main project features: Engineering, Procurement and Performance audit of projects
namely; Kamwenge-Fortportal road (67km);Mitaano and Ntungwe
bridges in Lukingiri District;Mpigi-Kanoni road (64km) and
Construction of Kampala-Entebe Expressway (52.4km)
Positions held: Auditor (Procurement & Materials/Geotechnical Specialist)
Activities performed: Evaluation the compliance of procurement process with public
procurement Act; Assess the contract documents if complied with
design recommendations, supervising the field testing to verify the
quality of the completed works, review the geotechnical
investigation reports and assess the integrity of the pavements and
foundation design, review the compliance of payments with specs.
38
Name of assignment or project: Consultancy services for post and preventive Technical Audit for
Maintenance Works executed by TANROADS, PMO-RALG and
MoW for FY 2013/14 - 2014/15; 2015/16-2016/17 and FY 2009/10
and 2010/11
Year: 2014 - 2016 and 2011- 2012
Location: Kagera,Geita,Mwanza & Mara for FY 2013-2015 and Lindi,Mtwara
& Ruvuma for FY 2010-2012 and Dar es Salaam for FY 2015/16
Client: The Road Funds Board
Main project features: Performance and Value for Money Audit
Positions held: Auditor (Procurement & Materials/Geotechnical Specialist)
Activities performed: The assignment involved visual inspection and evaluation of the
projects executed under PMO-RALG, TANROADS and MoW for
each Council if complied with the contract specifications, cost and
time. Carrying out field confirmation tests to verify their quality of
execute works in comparing with the contract specifications.
Name of assignment or project: Feasibility Study and Preliminary design of New Salender Bridge in
Dar es Salaam (1.0km bridge + 7.0km dual carriageway approach
roads)
Year: September 2014 – January,2015
Location: Dar es Salaam, Tanzania
Client: EXIM BANK KOREA / TANROADS HQ
Main project features: Feasibility Study and preliminary engineering design for the
proposed 1.0km bridge and 7.0 dual carriageway roads. The bridge
will pass at the Indian Ocean to reduce congestion along Ali
Hassan Mwinyi Road
Positions held: Principal Geotechnical/Materials Engineer
Activities performed: Supervise field geotechnical investigation and laboratory testing,
evaluation of investigation results and recommendation on the
type of foundation, preparation of pavement design on the
approach roads.
Name of assignment or project: Feasibility Study, Detailed Engineering Design and Preparation of
Tender Documents for Upgrading of Kidatu – Ifakara – Lupiro –
Malinyi – Londo – Lumecha Road (512 Km) to Bitumen Standard
Year: May 2014 to Sept 2015
Location: Morogoro / Ruvuma Regions
Client: TANROADS HQ
Main project features: Feasibility Study, detailed engineering design and preparation of
tender documents
Positions held: Principal Geotechnical/Materials Engineer
39
Activities performed: Supervise field geotechnical investigation and design of bridge
foundations, supervise laboratory testing, preparation of
investigation and Materials Reports foundation and pavement
design
Name of assignment or project: Consultancy Services for Feasibility Study, Environmental and Social
Impact Assessment, Detailed Engineering Design and preparation
of Tender documents for upgrading of Loliondo Mto wa Mbu
(213km).
Year: Jan 2010 – April 2011
Location: Arusha, Tanzania
Client: TANROADS - HQ
Main project features: Feasibility Study, detailed engineering design and preparation of
tender documents
Positions held: Senior Geotechnical/Materials Engineer
Activities performed: Supervise field geotechnical investigation and design of bridge
foundations; supervise laboratory testing, preparation of
investigation and Materials Reports foundation and pavement
design.
Name of assignment or project: Consultancy Services for Environmental and social Impact
assessment, detailed design of rehabilitation of Mafinga -Igawa
(142km) road in Iringa and Mbeya Region
Year: Aug 2011 – July 2012
Location: Tanzania
Client: TANROADS, HQ
Main project features: Road rehabilitation project
Positions held: Senior Geotechnical/Pavement Engineer/Project Coordinator
Activities performed: Responsible for investigating the extent of failure by open up of
trial pits for observation of pavement profile and surfacing
condition survey, Carrying FWD on the entire road length to
ascertain the extent of deformation; carry out DCP soundings at
intact sections for comparison of insitu and laboratory results,
investigation of sources of materials to be used for construction
works, Carrying out traffic analysis and pavement design to
SUPERPAVE structure for rehabilitation measures.
40
Name of assignment or project: Consultancy Services for Value for Money Audit for Local
Government projects financed by Capital Development Grants for
FY 2009/10 and FY 2012/13
Year: January-February 2011 and May, 2012.
Location: Tanga,2011 and Kondoa Dc, Morogoro Mc, Rufiji Dc and Kinondoni
Mc.in 2012
Client: Prime Minister’s Office, Regional Administration and Local
Government (PMORALG).
Main project features: Technical Auditing/Value for money
Positions held: Procurement /Infrastructure Engineer Specialist - Team Leader
Activities performed: Responsible for assessing and evaluation the money spent by Local
Government authorities on the development of projects (roads,
water supply, Implementation of Agriculture development
programmes, Health); Evaluation of procurement process and
quality of the executed works.
Name of assignment or project: Consulting services for design of 42.9km of Bus Rapid Transit
System Phase 2 & 3 in Dar es salaam City
Year: May 2011 – September 2012
Location: Dar es Salaam, Tanzania
Client: Dar es Salaam Rapid Bus Transit Agency (DART)
Main project features: Expansion of roads to six lanes for rapid buses and mixed traffic
Positions held: Senior Geotechnical/Pavement Engineer/Project Coordinator
Activities performed: Responsible for the design of roads (Kilwa road 14km, Nyerere
road 20.5km, Chang’ombe/Kawawa road 6.25km, and Uhuru road
5.25km) .The roads were designed to carry out six lanes i.e. two
lanes for rapid buses, four lanes for mixed traffic and additional
lanes for cyclists and two lanes for non-cyclists. The project
included also design of its associated structures, traffic surveys,
design of bus terminals, deports, feeders stations and bus stations.
Responsible for material sources investigations, alignment soils
investigations, design of pavement structure for BRT and mixed
traffic, Preparation of Materials report and assist in preparation of
costs estimates and Tender Documents for the Project
Name of assignment or project: Assessment of Local Council under Local Government Capital
Development Grants for FY 2012/13, FY 2011/12, FY2010/11,
FY2009/10 and FY 2007/08
Year: May-June 2012, Feb-Mar 2011, Jan-Feb2010, Jan-Feb 2009, Sep-
Oct 2007
Location: Various Districts, Tanzania
41
Client: Prime Minister’s Office, Regional Administration and Local
Government (PMORALG).
Main project features: Technical Auditing/Value for money
Positions held: Procurement /Infrastructure Engineer Specialist - Team Leader
Activities performed: Responsible for assessing and evaluation the amount spent by
Local Government authorities on the development of projects
(roads, water supply, environmental management and urban
development programmes); Evaluation of human resources and
financial management capacity of LGA to implement projects,
Evaluate transparency and accountability on project
Implementations and evaluation of Agriculture Development
Grants compliance with government guidelines.
Name of assignment or project: Consultancy Services for Technical Audit for projects executed by
Ministry of Transport and Communication, the Revolutionary
Government of Zanzibar for FY 2008/09 and FY2009/10
42
Name of assignment or project: Consultancy services for design of upgrading of University of Dar es
Salaam - Changanyikeni – Kimara Korogwe road (3.5km) and
Kimara Korogwe- Makoka-External (9km) to alleviate Traffic
Congestion in Dar es Salaam
Year: July 2009 – October 2009
Location: Dar es Salaam, Tanzania
Client: TANROADS Regional Manager’s Office, Dar es Salaam.
Main project features: Design of road upgrading to bitumen standard to alleviate
congestion in the City of Dar es Salaam
Positions held: Senior Geotechnical & Pavement Engineer/Project Engineer
Activities performed: Responsible for investigation of material sources investigations and
soil alignments, supervising the ground investigations for the
bridge foundation; design of bridges foundations and protection
works and preparation of materials report and pavement design of
the respective roads.
Name of assignment or project: Consultancy services for detailed design of upgrading of Mziha –
Magole road (Mziha-Turiani 36km Section) to bitumen standard
Year: April to October 2009
Location: Morogoro, Tanzania
Client: TANROADS Regional Manager’s Office, Morogoro
Main project features: Design of upgrading road project to bitumen standard
Positions held: Geotechnical/Materials Engineer
Activities performed: Responsible for investigation of materials for the pavement design
works; Responsible for material sources investigations, approach
roads alignment soils investigations, Participated in Geotechnical
investigations for Main and secondary bridges foundation, design
of bridge protection works, approach roads Pavement structure
design and Preparation of Materials report
Name of assignment or project: Consultancy Services for Engineering Audit and Evaluation of the
executed works along Nangurukuru – Mbwemkuru Design-Build
Road Project (96Km).
Year: April,2008 – May, 2008
Location: Lindi, Tanzania
Client: TANROADS, HQ
Main project features: Performance Audit
Positions held: Geotechnical/Materials Engineer Specialists
Activities performed: Responsible for visual inspection of the entire project road to asses
43
severity and extent of the defect, observation on the types of the
of pavement failures and their locations; carry out DCP soundings
at intact sections for comparison of insitu and laboratory results ,
follow-up on laboratory testing of materials samples ;Studying the
scope of the prevailing design and construction contract;
Performing investigations on pavement layers and their materials
and carryout proper testing to establish the cause of cracks
development and other defects. Re- design of the road sections for
remedial for strengthen the pavement
Name of assignment or project: Consultancy services for detailed design for upgrading of
Mwandiga-Manyovu roads (60km) to Bitumen standard
Year: August 2007 – November,2007
Location: Kigoma, Tanzania
Client: TANROADS HQ.
Main project features: Detailed Design for upgrading of road project
Positions held: Structural/Bridge Engineer
Activities performed: Responsible for structural design of bridges and drainages
structures of the proposed section using MasterSeries software.
Responsible for structural design of pilling caps. Preparation and
supervision of production of structural drawings in line with the
specification.
44
Name of assignment or project: Consultancy Services for supervision of Construction for Kamwana
Bridge along Kanyambogo - Ibuga Road; Routine Maintenance
along Kanyambogo - Ibuga road (20km) and Nyakahama-Ruhanga
(20km) in Muleba District and different Coffee rural roads in
Bukoba and Karagwe districts under STABEX /European
Development Fund)
Year: September,2006 – April 2007
Location: Kagera, Tanzania
Client: TANROADS Regional Manager’s Office, Kagera
Main project features: Supervision of rehabilitation projects for coffee growing roads
Positions held: Materials Engineer/Resident Engineer
Activities performed: Responsible for material sources investigations, approach roads
alignment soils investigations, Supervise the Geotechnical
investigations for bridges foundations, design of bridge protection
works and approach roads. Overall quality control of pavement
and concrete works and preparation of Monthly and material
production reports. Certify payments for completed works.
Name of assignment or project: Consultancy Services for supervision of routine maintenance works
along Mbamba Bay-Lituhi Road ( 107km) under RUSIRM project/
European Development Fund
Year: March– September,2006
Location: Ruvuma, Tanzania
Client: TANROADS Regional Manager’s Office, Ruvuma
Main project features: Supervision of road maintenance works
Positions held: Resident Engineer
Activities performed: Responsible for supervision of Contractors on the execution of
works, Liaison with Regional Manager Office on contract issues,
Overall quality and quantity Control of works, supervise consultant
staff and monitoring the performance of works in compliance with
client specifications; measurements of quantities and certification
of payments to the contractors. Preparation of Monthly project
reports
45
Client: Ministry of Communications and Transport, Zanzibar.
Main project features: Supervision of upgrading projects
Positions held: Geotechnical/Materials Engineer
Activities performed: Responsible for design review including soil alignment
investigations, checking pavement design, design of C1 and C2
stabilized mixes, concrete mix design and Asphalt Mix design(DBM
40, AC 20 and 14); Supervising soils and materials testing
programme for pavement quality control. Supervising the
measurements of field density and laboratory testing during
construction and daily control of quality of works and earthworks
mobilized on site.
Name of assignment or project: Consultancy services for design and supervision of rehabilitation of
Health facilities in Dar es salaam (First Health Rehabilitation
Project)
Year: March, 2003 – April,2005
Location: Dar es Salaam, Tanzania
Client: Ministry of Health
Main project features: Supervision of construction of Dar es Salaam Municipal Hospitals
(Ilala, Mwananyamala and Temeke), construction of Kigamboni
health centre and expansion of dispensaries and staff houses in
Dar es Salaam.
Positions held: Structural/project Engineer
Activities performed: Responsible for supervising the concrete mix design, checking
reinforcements for compliance of structural works; design review
of existing structures and proposing remedial measures. Checking
46
quality control of works.
Name of assignment or project: Consultancy services for detailed engineering design, contract
supervision and preparation of tender documents and construction
supervision of Muhimbili National Hospital Buildings, Internal roads
and Parking (9.6km) to Bitumen Standard.
Year: Sept 2003 - Jun 2004
Location: Dar es Salaam, Tanzania
Client: Ministry of Health
Main project features: design and supervision of the rehabilitation of buildings, internal
roads, existing and new parking and water supply system
Positions held: Structural/Materials Engineer
Activities performed: Responsible for review of material sources investigations,
alignment soils investigations, design of pavement structure;
preparation of materials report; assist in preparation of costs
estimates and tender documents for the project and overall quality
control of the construction works.
CERTIFICATION
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes
myself, my qualifications, and my experience. I understand that any wilful misstatement described
herein may lead to my disqualification or dismissal, if engaged.
47
ACADEMIC AND PROFESSIONAL CERTIFICATES FOR
SALVATORY LYAKURWA
48
49
50
51
1 Name of The Firm SGC LIMITED
52
2 Proposed Position For Soils Geotechnical Engineer
This Project
3 Name of Person Hamduni Selemani
4 Date of Birth 1980
5 Nationality Tanzanian
6 Membership in Professional Registered Engineer, Engineers’ Registration Board,
Associations Tanzania, PE 3048
Member, Institution of Engineers Tanzania
7 Education: BSc. in Civil and Transportation Engineering (Hons),
University of Dar es Salaam (TANZANIA),. 2004
8 Other Training September 2007 attended planning and management
change workshop
9 Languages & Degree of Language Speaking Reading Writing
Proficiency
Swahili Mother tongue
English Fluent Excellent Excellent
10 Countries of Work Experience Tanzania
11 Employment Record
SGC Limited FROM TO
March,2015 Date
Mhandisi Consultancy Limited FROM: TO:
Senior Highway/Road May 2013 February,2015
Engineer
COWI Tanzania Consulting FROM: TO:
Engineer & Planners Sept 2009 May 2013
Soils/Material Engineer
TAKOPA FROM: TO:
Soils/Material Engineer March 2008 August 2009
12 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:
Mr Selemani has more than 9 years of experience in the field of soils & Materials / Geotechnical
Engineering. He has participated on several roads and railway projects which includes:
53
Feasibility Study and Preliminary Engineering Design for the Upgrading of Kasesya-
Kasanga Road Project to Bitumen Standard
Consultancy Services for Feasibility Study, Detailed Engineering Design and Preparation
of Tender Documents for Upgrading of Kidatu – Ifakara – Lupiro – Malinyi – Londo –
Lumecha Road (512 Km) to Bitumen Standard – Donor Funded Project
Site Investigation and Design for Upgrading existing Arusha - Tanga Railway Line – Donor
Funded Project
Name of assignment or project: Value for Money and Procurement Audit for Government
Project Executed by Government Procurement Entity (PE)
for Financial Year 2012/2013 (Temeke District Council)
54
Year: September 2013 – to date
Location: Dar es Salaam, Tanzania
Client: PPRA
Main project features: Value for Money and Procurement Audit
Positions held: Technical Auditor
Activities performed: Responsible for carry out procurement (compliance) audit
and performance audits (Value for Money) in order to
determine whether contracts were/are implemented in
accordance with stipulated contract terms and conditions
and whether value for money was/is achieved in spending
public funds.
Name of assignment or project: Site Investigation and Design for Upgrading existing Arusha
- Tanga Railway Line
Year: 2013
Location: Tanzania
Client: RAHCO
Main project features: Site investigation and design to upgrade the Arusha to
Tanga railway line, including topographic survey, soil
investigations, alignment and structures improvements and
new stations.
Positions held: Soils and Materials Engineer
Activities performed: Soils and Materials Engineer leading 10-week site
investigation works and production of Geotechnical Report
55
and activities in the project.
57
specifications.
Name of assignment or project: Feasibility Study and Preliminary Engineering Design for the
Upgrading of Kasesya-Kasanga Road Project to Bitumen
Standard
Year: Feb 2007 - March 2008
Location: Tanzania
Client: TANROADS
Main project features: Materials Investigation, Testing, Pavement Condition
Survey, Design for Reconstruction and Rehabilitation of
Kasesya-Kasanga Road Project, Tanzania
Positions held: Soil & Materials Engineer
Activities performed: Responsible for centreline investigation, borrow
areas investigation, aggregate source both for both
double bituminous surface dressing and concrete
works, other construction materials i.e. sand,
water, etc sources including planning, carrying out
the activities, laboratory testing and analysis of
results.
58
consultancy service for the preliminary design for
Sumbawanga-Kasesya- Matai- Kasanga road
project.(151 km)
59
pavement design.