PROJECT : PEMBANGUNAN PELABUHAN FUTONG

LOCATION : DERMAGA FUTONG, KERINCI KAB.PELALAWAN, RIAU


To : PT……………….
Up : BAPAK …………

NO DESCRIPTION OF WORK UNIT QTY UNIT PRICE ( IDR ) AMOUNT ( IDR )

I . Consultan Fee -
1 Consultan Fee ls 1
2 Site visit + Transport Engineer ls 1
3 Software fee ls 1
4 Drafter ls 1
5 Communication ls 1 1,000,000 1,000,000
6 Final Report ( Lab + Engineering Report) ls 1 3,000,000 3,000,000
TOTAL POINT I 4,000,000
II . Soil Investigation Cost
1 Preparation & Mobilization team/equipment Soil Investigation ls 1 7,000,000 7,000,000
2 Exploration Drilling @30 meter (6 point)
- Shifting and Setting up drilling rig loc 6 10,000,000 60,000,000
- Drilling at 6 point location
- 00,00 - 20,00 m m 120 350,000 42,000,000
- 20,00 - 40,00 m m 60 400,000 24,000,000
- Standart Penetration Test at 2m Interval
- 00,00 - 20,00 m test 60 150,000 9,000,000
- 20,00 - 40,00 m test 30 200,000 6,000,000
- Undisturb Soil Sampling nos 12 200,000 2,400,000
- Corebox box 36 300,000 10,800,000
3 Piozocone Test -
- Shifting and Setting CPTu Nos 10 600,000 6,000,000
- CPTu Testing Nos 10 16,000,000 160,000,000
- Dissipation Test nos 10 tidak tersedia -
4 Dilatatometer Testing
- Dilatatometer Testing Nos 10 tidak tersedia -
TOTAL POINT II 327,200,000
III . Laboratory Test
1 Natural Moisture Content Nos 12 200,000 2,400,000
2 Bulk Density Test Nos 12 200,000 2,400,000
3 Spesific Gravity Test Nos 12 200,000 2,400,000
4 Grain Size Analysis (Sieve & Hydrometer) Nos 12 200,000 2,400,000
5 Atterberg Limit Test Nos 12 300,000 3,600,000
6 Triaxial UU Test Nos 12 300,000 3,600,000
7 Swelling Test Nos 12 300,000 3,600,000
8 Consolidation Test Nos 12 300,000 3,600,000
TOTAL POINT III 24,000,000

TOTAL ( I+II+III ) 355,200,000

NB. Harga Belum Termasuk PPN 10 %


Harga Belum Termasuk Biaya Perancah
Pembayaran :
- Termin I (Satu) 50 % dari total harga Kontrak sebelum
mobilasasi alat dan personil ke lapangan
- Termin II ( Dua ) sisa 50 % Sebelum penyerahan Laporan Akhir