B TENAGA PENDUKUNG
1 Juru Bor MM 1 2.5 1,450,000.00
2 Asisten Juru Bor MM 2 2.5 1,450,000.00
3 Juru Hitung MM 1 2.5 1,450,000.00
4 Surveyor MM 2 2.5 1,450,000.00
5 Draftman MM 1 2.5 1,200,000.00
6 Tenaga Administrasi & Keuangan MM 1 3.0 950,000.00
7 Pengolah Data/Operator Komputer/Typist MM 1 3.0 850,000.00
A.1 Peralatan
1 Sewa Komputer + printer Unit/Bln 2 3.0 475,000.00
2 Telpon Bln 1 3.0 225,000.00
3 Sewa kendaraan roda empat Bln 1 3.0 1,950,000.00
B.1 Akomodasi
1 Team Leader OH 1 30.0 50,000.00
2 Ahli Struktur OH 1 25.0 40,000.00
3 Ahli Geodesi OH 1 20.0 40,000.00
4 Ahli Geologi OH 1 20.0 40,000.00
5 Ahli Terowongan OH 1 23.0 40,000.00
6 Juru Hitung OH 1 20.0 40,000.00
7 Draftman OH 1 20.0 40,000.00
8 Surveyor OH 2 21.0 40,000.00
C PENGADAAN LAPORAN
C.1 Dokumentasi Teknis
1. Laporan Pendahuluan eks 5 - 25,000.00
2. Laporan Bulanan eks 15 - 20,000.00
3. Draft Laporan Akhir Rancangan eks 10 - 55,000.00
4. Laporan Akhir & Gambar eks 10 - 65,000.00
5. Dokumentasi Album Album 1 - 145,000.00
JUMLAH
PPN (10%)
JUMLAH TOTAL
JUMLAH TOTAL
per minggu
Rencana Kemajuan
Komulatif
per minggu
Realisasi Kemajuan
Komulatif
Deviasi
Mengetahui
Pemimpin Kegiatan
Pemantauan dan Pemulihan Lingkungan
Bidang Pertambangan
JAD
TOTAL Bobot I
(Rp) % JULI AGUSTUS
26-31 1-7 8-16 17-25
6 7 9 9
20,000,000.00 12.894
1,850,000.00 1.193
1,500,000.00 0.967
555,000.00 0.358
7,200,000.00 4.642
600,000.00 0.387
600,000.00 0.387
600,000.00 0.387
600,000.00 0.387
600,000.00 0.387
600,000.00 0.387
600,000.00 0.387
600,000.00 0.387
600,000.00 0.387
600,000.00 0.387
600,000.00 0.387
600,000.00 0.387
600,000.00 0.387
1,250,000.00 0.806
125,000.00 0.081
300,000.00 0.193 0.064
550,000.00 0.355
650,000.00 0.419
145,000.00 0.093 0.031
155,105,000.00 100.000
15,510,500.00
170,615,500.00
170,615,000.00
- 1.803 5.532 8.945 9.040
- 1.803 7.335 16.280 25.320
- 1.537 5.266 8.679 8.774
- 1.537 6.803 15.482 24.256
-1.064
Diperiksa Oleh,
Direksi Pekerjaan
NOMOR KONTRAK :
TANGGAL :
JADWAL PELAKSANAAN
II III
AGUSTUS SEPTEMBER SEPTEMBER OKTOBER
26-31 1-7 8-16 17-24 25-30 1-7 8-16
6 7 9 8 6 7 9
0.187 0.218
0.176 0.205 0.264
0.129
0.141 0.164 0.211
0.162 0.189 0.243
0.141 0.164 0.211
0.141 0.164 0.211
0.271
0.242
0.242
0.179 0.208
0.179 0.208
0.179 0.208
0.179 0.208
0.179 0.208
0.179 0.208
0.179 0.208
0.179 0.208
0.179 0.208
0.179 0.208
0.179 0.208
0.179 0.208
0.179 0.208
0.372 0.434
0.081
0.064
0.355
0.031
9.446 10.071 12.563 11.076 11.547 9.572 8.053
34.766 44.837 57.400 68.476 80.023 89.595 97.648
9.302 9.926 12.419 10.931 11.691 9.716 8.198
33.557 43.483 55.902 67.898 79.589 89.306 97.504
-0.578
99.42
100.000
Komu Kete
OKTOBER latif rangan
17-23
7 100
0.827
90
0.176
0.143
0.128
80
0.143
0.034
0.293 70
0.009
0.002
0.019
0.001
0.045
0.016 60
50
40
30
20
10
0.064
0.419
0.031
0
2.352
100.000
2.496
100.000
0.000
0.578