PT GEO RIZKI NUSANTARA

PI Office Building Jl. Ngadinegaran BLOK MJ III No. 144,


Mantrijeron Yogyakarta | Daerah Istimewa Yogyakarta 55143
0274 3718 67 | surveyorgeokita@gmail.com
www.georizkinusantara.com

BILL OF QUANTITY FOR SOIL INVESTIGATION


NO. 05/10/GRN/2021
PROJECT : SOIL INVESTIGATION OFFSHORE
LOKASI : KUMAI, KALIMANTAN TENGAH

HARGA
NO. DESCRIPTION QUANTITY TOTAL HARGA
SATUAN

A. PEKERJAAN SOIL INVESTIGATION


I. Mob demob dan Akomodasi
1 Mobilization & Demobilization Equipment
2.00 pp 18,500,000 37,000,000
2 Mobilization & Demobilization Crews
3 Local Transportation 1.00 ls 2,700,000 2,700,000
4 Accomodation, Documentation atc 1.00 ls 7,700,000 7,700,000
5 Pengiriman Sampel 1.00 Ls 1,200,000 1,200,000
Sub Total A. I. 48,600,000

II Field Investigation
1 Boring 2 titik @ 10 m, 20.00 m 750,000 15,000,000
2 N-SPT (Interval 1.5 m) 14.00 no's 200,000 2,800,000
3 UDS Using Thin Waller Sampler (Interval 2 meter) 10.00 no's 300,000 3,000,000
4 Moving and Set-Ap of Drilling rig at Position 2.00 point 2,000,000 4,000,000
5 Bagan 2.00 point 12,500,000 25,000,000
6 Perahu 1 Unit 10.00 hari 1,500,000 15,000,000
7 Core Box ( Each box contains 5 m) 4.00 no's 250,000 1,000,000
Sub Total A. II. 65,800,000

III Field Investigation


Laboratory
1 Testing Index Properties 24.00 no's 95,000 2,280,000
2 Natural Moisture Content (Wn) 24.00 no's 95,000 2,280,000
3 Unit Weight of Soil Specific Gravity (Gs) 24.00 no's 95,000 2,280,000
4 Atterberg Limit ( LL, PL, PI) 24.00 no's 95,000 2,280,000
5 Grainsize analysis and Hydrometer Test 24.00 no's 95,000 2,280,000
Engineering Properties
1 Consolidation 10.00 no's 275,000 2,750,000
2 Unconsolidated Undrained (UU,CU) Triaxial Test 10.00 no's 275,000 2,750,000
Rock Test
1 Mineralogy Test 10.00 no's 150,000 1,500,000
2 Uni-axial compression strength 10.00 no's 150,000 1,500,000
3 Point load strength test 10.00 no's 150,000 1,500,000

Sub Total A. III. 21,400,000

IV Reporting
1 Final Report 1.00 ls 7,500,000 7,500,000

Sub Total A. IV. 7,500,000

TOTAL I + II + III + IV : 143,300,000


PPN 10% : 14,330,000
TOTAL : 157,630,000
Termin Pembayaran :
1. Termin 1 sebesar 40 % Saat mobilisasi pekerjaan
2. Termin 2 sebesar 40 % Saat pekerjaan lapangan selesai di kerjakan
3. Termin 3 Sebesar 20 % Saat laporan final diserahkan Note :
1. Durasi pekerjaan penyelidikan tanah, lapangan+laporan 30 hari kalender.
2. Perijinan lokasi pekerjaan menjadi tanggung jawab pemberi kerja.

Hormat kami,
Yogyakarta, 27 Oktober 2021

Rizki Rafiandi, S.T.


Direktur