KALAHI-CIDSS PROJECT
COMMUNITY DRIVEN DEVELOPMENT PROGRAM
Additional Financing
Summary
Manpower Description Quantity Unit Unit Cost Total
Project Supervisor 1.00 day 700.00 700.00
Laborer 7.00 M-D 400.00 2,800.00
TOTAL 3,500.00
unit cost = P 2.50 per sq.m.
ITEM 104. EMBANKMENT
Width 7.00 m
Length 200.00 m
Area 1,400.00 sq.m
Volume 140.00 cu.m
II.1.A. MATERIALS
Common Borrow Materials 161.00 cu.m additional 15% compaction
II.1.B. LABOR
Qty. = 161.00 cu.m
Manpower Required = 10.00 Laborers
Labor Output = 3.00 cu.m/m-day
1.00 Project Supervisor
Gang Output = 30.00 cu.m/day
Duration = 5.37 days say 6.00 days
Summary
Description Quantity Unit Unit Cost Total
A. MATERIALS
Common Borrow Materials 161.00 cu.m 700.00 112,700.00
-
SUB-TOTAL 112,700.00
B. LABOR
Project Supervisor 6.00 day 700.00 4,200.00
Laborer 60.00 M-D 400.00 24,000.00
-
SUB-TOTAL 28,200.00
TOTAL 140,900.00
unit cost = P 875.16 per cu.m.
ITEM 200. AGGREGATE SUB BASE-COURSE
C. EQUIPMENT
TOTAL 322,200.00
unit cost = P 1,648.08 per cu.m.
IV.1.B. LABOR
FORMWORKS
Qty. = 400.00 l.m.
Labor Output = 6.00 l.m/day
Manpower Required = 6.00 Laborers
2.00 Skilled
1.00 Construction Foreman
Gang Output = 48.00 l.m/day
Duration = 8.33 days say 9.00 days
CONCRETING
Qty. = 120.00 cu.m
Equipment Output = 3.50 cu.m/day
Manpower Required = 8.00 Laborers
2.00 Skilled
1.00 Project Supervisor
Gang Output = 3.50 cu.m/day
Duration = 34.29 days say 35.00 days
Summary
Description Quantity Unit Unit Cost Total
A. MATERIALS
Portland Cement Type 1p 1,080.00 bag 400.00 432,000.00
Sand (washed) 60.00 cu.m 1,500.00 90,000.00
Gravel (washed) 120.00 cu.m 1,500.00 180,000.00
16mm dia. X 6m RSB 27.00 pcs 550.00 14,850.00
C-Purlins 2" x 6" x 20' x 1.2mm thk. 16.00 pcs 1,700.00 27,200.00
Angle Bar 1-1/2" x 1-1/2" x 20' x 3mm t 6.00 pcs 700.00 4,200.00
20mm dia. Plain Bar 62.00 pcs 750.00 46,500.00
C.W. Nails 3" - kg 120.00 -
Flatbar 2" x 1/4 thk x 6m 1.00 pcs 100.00 100.00
Asphalt Sealant (20kg) 4.00 bag 2,500.00 10,000.00
SUB-TOTAL 804,850.00
B. LABOR
Labor (Form works) 54.00 M-D 400.00 21,600.00
Skilled (Form works) 18.00 M-D 550.00 9,900.00
Labor (Concreting) 280.00 M-D 400.00 112,000.00
Skilled (Concreting) 70.00 M-D 550.00 38,500.00
Project Supervisor 35.00 days 700.00 24,500.00
Hauling of Water (for concreting) 1,152.00 gal (30 Li) 20.00 23,040.00
SUB-TOTAL 229,540.00
C. EQUIPMENT
1 Bagger Mixer Including FOL (34l
E-D
Fuel, Oil & Lubricant) 35.00 2,030.00 71,050.00
Concrete Vibrator Including FOL 35.00 E-D 1,500.00 52,500.00
Concrete Cutter Including FOL 7.00 E-D -
SUB-TOTAL 123,550.00
TOTAL 1,157,940.00
unit cost = P 9,649.50 per l.m
A. DIRECT COST
Materials 1,098,850.00
Labor
Project Supervisor 48.00 days 700.00 33,600.00
Skilled 88.00 M-D 550.00 48,400.00
Unskilled 461.00 M-D 400.00 184,400.00
Unskilled-hauling of Water 1,152.00 gal (30 Li) 20.00 23,040.00
Equipment 123,550.00
TOTAL DIRECT COST 1,511,840.00
B. INDIRECT COST
1.00 Pre/Post Enginneering Expenses
1.00 lot 2,500.00 2,500.00
Production of Plans (A3 Printing and Photo Copy)
TOTAL 2,500.00
Project Signage
Other Expenses
Bunkhouse 1.00 lot
40pcs.-2" x 3" x 10' Coco Lumber 200.00 pcs. 27.00 5,400.00
10ft. Corrugated G.I. Sheet Ga.24 5.00 sheet 780.00 3,900.00
1/4" Ordinary Plywood 8.00 sheet 540.00 4,320.00
Blue Sheet 30.00 m 85.00 2,550.00
4" CW Nail 1.00 kg 120.00 120.00
3" CW Nail 1.00 kg 120.00 120.00
1-1/2" CW Nail 1.00 kg 120.00 120.00
Chain and Padlock 1.00 set 405.00 405.00
Office Supplies 1.00 lot
Bond paper A4 (8.27" x 11.69") 2.00 rim 210.00 420.00
Bond paper Short (8.5" x 11") 1.00 rim 200.00 200.00
Bond paper Long (8.5" x 13") 1.00 rim 250.00 250.00
Ball pen (black) 1.00 box 120.00 120.00
Marker (black) 2.00 pcs 60.00 120.00
Record Book (200 pages) 2.00 pcs 120.00 240.00
Printer Ink (Black,Yellow, Magenta, Blue) 4.00 bot. 380.00 1,520.00
Photocopy of Documents 1.00 lot 2,000.00 2,000.00
Notorial Fee 1.00 lot 1,500.00 1,500.00
Bank Opening/Closing 2.00 lot 600.00 1,200.00
Checkbooklet 1.00 lot 600.00 600.00
Additional Bond Premium 1.00 lot 11,250.00 11,250.00
Petty Cash Box 30cm x 22cm x 8.8cm metal 1.00 lot 1,600.00 1,600.00
Toatal for Office Supplies/Materials 37,955.00
TOTAL 96,955.00
4.00 Personal Protective Equipment
3 Ply Surgical Mask Earlobe 50's/box 4.00 boxes 250.00 1,000.00
Cotton Working Gloves 20.00 pairs 65.00 1,300.00
EN 166 Safety Goggles 2.00 pcs 150.00 300.00
DIN EN 397 Hard Hat-White 3.00 pcs 180.00 540.00
Rubber Boots No.9 20.00 sets 550.00 11,000.00
TOTAL 14,140.00
C. CONTINGENCY 55,733.55
No. of
RATE PER
ITEM ITEM DESCRIPTION QUANTITY UNIT Crew / TOTAL
DAY/UNIT COST
Labor
B. Labor
Project Supervisor 6.00 day 1 700 4,200.00
Laborer 6.00 days 10.00 400.00 24,000.00
SUB-TOTAL 28,200.00
TOTAL 140,900.00
B. Labor
Labor (Form works) 9.00 days 6.00 400.00 21,600.00
Skilled (Form works) 9.00 days 2.00 550.00 9,900.00
Labor (Concreting) 35.00 days 8.00 400.00 112,000.00
Skilled (Concreting) 35.00 days 2.00 550.00 38,500.00
Project Supervisor 35.00 days 1.00 700.00 24,500.00
Hauling of Water (for concreting) 1,152.00 gal (30 Li) 20.00 23,040.00
SUB-TOTAL 229,540.00
C. Equipment
1 Bagger Mixer Including FOL (34l Fuel, Oil & Lubricant) 35.00 days 1.00 2,030.00 71,050.00
Concrete Vibrator Including FOL 35.00 days 1.00 1,500.00 52,500.00
SUB-TOTAL 123,550.00
TOTAL 1,158,840.00
No. of
RATE PER
ITEM ITEM DESCRIPTION QUANTITY UNIT Crew / TOTAL
DAY/UNIT COST
Labor
Production of Plans (A3 Printing and Photo Copy) 1.00 lot 2,500.00 2,500.00
TOTAL 2,500.00
CV Travel Expenses:
1. BAC
Serving of Canvas (2 Pax) 6.00 trips 2.00 500.00 6,000.00
Serving of PO (1 Pax) 6.00 trips 1.00 500.00 3,000.00
Meal Allowance:
Lunch Php. 250.00/pax
AM Snaks Php. 95.00/pax
PM Snacks Php. 95.00/pax
1. BAC 15.00 trips 2.00 500.00 15,000.00
2. Punong Barangay 6.00 trips 1.00 500.00 3,000.00
3. Barangay Treasurer 20.00 trips 1.00 500.00 10,000.00
MFW (Travel)
Bookkeeper
Barangay Treasurer
2.00 trips 4.00 500.00 4,000.00
Punong Barangay
AIT
CVT (Travel)
PIT
Barangay Treasurer
Punong Barangay
AIT
BAC 2.00 trips 1.00 500.00 1,000.00
Bookkeeper
MIT
BAC
O&M
No. of
RATE PER
ITEM ITEM DESCRIPTION QUANTITY UNIT Crew / TOTAL
DAY/UNIT COST
Labor
ODM (Travel)
Punong Barangay
Barangay Treasurer
2.00 trips 1.00 500.00 1,000.00
O&M
PIT
Other Expenses
Bunkhouse 1.00 lot - -
40pcs.-2" x 3" x 10' Coco Lumber 200.00 pcs. 27.00 5,400.00
10ft. Corrugated G.I. Sheet Ga.24 5.00 sheet 780.00 3,900.00
1/4" Ordinary Plywood 8.00 sheet 540.00 4,320.00
Blue Sheet 30.00 m 85.00 2,550.00
4" CW Nail 1.00 kg 120.00 120.00
3" CW Nail 1.00 kg 120.00 120.00
1-1/2" CW Nail 1.00 kg 120.00 120.00
Chain and Padlock 1.00 set 405.00 405.00
Office Supplies 1.00 lot - -
Bond paper A4 (8.27" x 11.69") 2.00 rim 210.00 420.00
Bond paper Short (8.5" x 11") 1.00 rim 200.00 200.00
Bond paper Long (8.5" x 13") 1.00 rim 250.00 250.00
Ball pen (black) 1.00 box 120.00 120.00
Marker (black) 2.00 pcs 60.00 120.00
Record Book (200 pages) 2.00 pcs 120.00 240.00
Printer Ink (Black,Yellow, Magenta, Blue) 4.00 bot. 380.00 1,520.00
Photocopy of Documents 1.00 lot 2,000.00 2,000.00
Notorial Fee 1.00 lot 1,500.00 1,500.00
Bank Opening/Closing 2.00 lot 600.00 1,200.00
Checkbooklet 1.00 lot 600.00 600.00
Additional Bond Premium 1.00 lot 11,250.00 11,250.00
Petty Cash Box 30cm x 22cm x 8.8cm metal 1.00 lot 1,600.00 1,600.00
Sub-Total for Administrative Cost 138,155.00
Contingency
1.00 lot 55,733.55 55,733.55
TOTAL 55,733.55
SUMMARY
DIRECT COST
MATERIALS 1,099,750.00
EQUIPMENT 123,550.00
LABOR
Project Supervisor 48.00 days 600.00 28,800.00
Skilled 88.00 M-D 450.00 39,600.00
Unskilled 461.00 M-D 350.00 161,350.00
Unskilled-Hauling of Water 1,152.00 gal (30 Li) 20.00 23,040.00
TOTAL 1,476,090.00
INDIRECT COST
Pre/Post Enginneering Expenses 1.00 lot 2,500.00 2,500.00
Project Signage 1.00 lot 12,000.00 12,000.00
Hand Tools 1.00 lot 19,100.00 19,100.00
Administrative and Overhead Cost 1.00 lot 138,155.00 138,155.00
Personal Protective Equipment 1.00 lot 14,140.00 14,140.00
TOTAL 185,895.00
Location :
Sub-Project Title : Concreting of .225km Access Road
Category : Rural Transport/Access Infrastructure
Physical Target : .225km
Total Sub-Project Cost : ₱1,753,468.55
Mode Implementation : Community Force Account
Sub-Project Description : 4m x 200m x .15thk. Concrete Pavement
Sub-Project Duration : 60 Calendar Days
Technical Personel : TECHNICAL FACILITATOR & MUNICIPAL ENGINEER
Equipment Needed : 1 bagger mixer and concrete vibrator
IMPLEMENTATION SCHEDULE
Physical
Days
%
Target
Item No. Scope of Work Quantity Unit Unit Cost Amount % Weight Month 1 Month 2
Accom.
week 1 week 2 week 3 week 4 week 5 week 6 week 7 Week 8 Week 9 Week 10
100 CLEARING & GRUBBING 140.00 cu.m 25.00 3,500.00 0.21% P 1 0.21%
A
PROCUREMENT
104 EMBANKMENT 140.00 cu.m 1,006.43 140,900.00 8.64% P 6 8.64%
A
200 AGGREGATE SUB-BASECOURSE 195.50 cu.m 1,671.10 326,700.00 20.04% P 12 10.02% 3.34% 6.68%
A
311 PORTLAND CEMENT CONCRETE PAVEMENT 800.00 sq.m 1,448.55 1,158,840.00 71.10% P 35 12.19% 10.16% 8.13% 8.13% 12.19% 12.19% 8.13%
A `
FORTUITIOUS EVENT. 5
TOTAL 1,629,940.00 100.00% 0.00%
Program Periodic P 8.86% 10.02% 12.19% 10.16% 8.13% 8.13% 12.19% 12.19% 11.47% 6.68%
Actual Periodic A 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PHYSICAL ACCOMPLISHMENT
Program Cumulative P 8.86% 18.88% 31.07% 41.23% 49.35% 57.48% 69.66% 81.85% 93.32% 100.00%
Actual Cumulative A 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
SLIPPAGE
Negotiated
Kalahi NCDDP
II Supply and Installation of 1 unit Project Marker Procurement - 08/03/2022 08/06/2022 n/a 08/09/2022 08/09/2022 n/a 08/10/2022 07/19/2022 GOP 5,500.00 5,500.00 Concreting of 0.225km Access Road
- AF LANAS
SVP
Negotiated
Kalahi NCDDP Procurement -
V Labor for Concreting of Access Road 07/20/2022 07/23/2022 n/a 07/26/2022 07/26/2022 n/a 07/27/2022 07/09/2022 GOP 279,720.00 279,720.00 Concreting of 0.225km Access Road
- AF LANAS Community
Participation
KALAHI-CIDSS
NATIONAL COMMUNITY DRIVEN DEVELOPMENT PRGOGRAM
B. Indirect Cost
Aminities/Facilities Err:509 Err:509 Err:509
Pre/Post Engineering Expenses 2,500.00 2,500.00 2,500.00
Project Signage 12,000.00 12,000.00 12,000.00
Hand Tools 19,100.00 19,100.00 19,100.00
Material Testing Err:509 Err:509 Err:509
Admin. Cost and Overhead 138,155.00 6,635.00 - 6,635.00
PPE 14,140.00 14,140.00 14,140.00
Sub- Total B Err:509 Err:509 - Err:509
TOTAL (A+B) Err:509
C. Contingency 55,733.55 55,733.55 55,733.55
TOTAL ESTIMATED COST
Grand Total Err:509 Err:509 28,600.00 - Err:509
SHOPPING OF
February 2022
Cotton Working Gloves 20.00 pairs 65.00 1,300.00
COMMUNITY
EN 166 Safety Goggles 2.00 pcs 150.00 300.00 Arsenia Commercial Center,
GOODS
DIN EN 397 Hard Hat-White 3.00 pcs 180.00 540.00 Carabao Island
Chargeable to 1st
Rubber Boots No.9 20.00 sets 550.00 11,000.00 Trading,Yanneses Builder,King
Tranche
Nylon String No. 16 10.00 rolls 50.00 500.00 Hardware, Redj Construction
Shovel, Round 10.00 pcs 550.00 5,500.00 Supply
5/16" Leveling Hose 20.00 lm 30.00 600.00
Piko with Handle 5.00 pcs 500.00 2,500.00
200L Plastic Drum Blue 5.00 pcs 2,000.00 10,000.00
SUB-TOTAL 33,240.00
PACKAGE NO. 2 (Hardware Materials)
SHOPPING OF
COMMUNITY
March 2022
Arsenia Commercial Center,
GOODS
SUB-TOTAL 5,500.00
PACKAGE NO. 5 (Water and Equipment Rental)
Hauling of Water (for concreting) 1,152.00 gal (30 Li) 20.00 23,040.00 Pakyaw Chargeable to 2nd
March 2022 Community
1 Bagger Mixer Including FOL (34l Fuel, Oil & Lubrican 35.00 days 2,030.00 71,050.00 Contract Tranche
Concrete Vibrator Including FOL 35.00 days 1,500.00 52,500.00
Concrete Cutter Including FOL 7.00 days - -
SUB-TOTAL 146,590.00
TOTAL OF PROCURABLE ITEMS ₱1,238,580.00
IMPLEMENTATION SCHEDULE
Physical
Days
Item %
Target
Scope of Work Quantity Unit Unit Cost Amount % Weight Month 1 Month 2 Month 3 Month 3
No. Accom.
week 1 week 2 week 3 week 4 week 5 week 6 week 7 week 8 week 9 week 10 week 11 week 12
I Site Clearing 0.10 m 35,000.00 3,500.00 #NAME? P 1 ###
A
II Layout and Staking 1,400.00 sq.m 100.64 140,900.00 #NAME? P 6 ###
A
III Structure Excavation 195.50 cu.m 1,648.08 322,200.00 #NAME? P 3 ### ### ### ### ###
A
IV Bacfilling, Embankment and Compaction #NAME? ### #NAME? #NAME? #NAME? P ### ### ### ###
A
V Reinforcing Steel Bars #NAME? ### #NAME? 1,157,940.00 #NAME? P 35 ### ### ### ### ### ### ### ### ### ### ### ###
A
VI Forms and Scaffoldings #NAME? ### #NAME? #NAME? #NAME? P ### ### ### ### ### ### ### ### ### ### ### ### ###
A
VII Concrete Works #NAME? ### #NAME? #NAME? #NAME? P ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###### ### ### ### ### ###
A
VIII Masonry Works
a. CHB Laying #NAME? ### #NAME? #NAME? #NAME? P ### ### ### ### ### ###
A
b. Plastering #NAME? ### #NAME? #NAME? #NAME? P ### ### ### ### ###### ### ### ###
A
IX Doors and Windows #NAME? ### #NAME? #NAME? #NAME? P ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
A
X Structural Steel Works #NAME? ### #NAME? #NAME? #NAME? P ### ### ### ### ### ### ### ### ### ### ### ### ###
A
XI Tinsmithry Works #NAME? ### #NAME? #NAME? #NAME? P ### ### ### ### ### ###
A
XII Carpentry Works #NAME? ### #NAME? #NAME? #NAME? P ### ### ### ### ### ### ### ### ### ### ### ### ###
A
XIII Plumbing Works #NAME? ### #NAME? #NAME? #NAME? P ### ### ### ### ### ### ### ###
A
XIV Tile Works #NAME? ### #NAME? #NAME? #NAME? P ### ### ### ###
A
XV Electrical Works #NAME? ### #NAME? #NAME? #NAME? P ### ### ### ### ###
A
XVI Pianting Works #NAME? ### #NAME? #NAME? #NAME? P ### ### ### ### ### ### ### ### ### ###
A
TOTAL #NAME? #NAME? 0.00%
Program Periodic P #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Actual Periodic A 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PHYSICAL ACCOMPLISHMENT
Program Cumulative P #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Actual Cumulative A 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
SLIPPAGE
Program Periodic P #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Actual Periodic A #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? 0.00 0.00
FINANCIAL ACCOMPLISHMENT Program Cumulative P #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Actual Cumulative A #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
xx xx xx
MCT-Technical Facilitator ACT-Technical Facilitator Municipal Engineer