You are on page 1of 1

NOT FOUND IN PEFS HOLD: 4

53-PI-517-PT

WELL NUMBER :
WELL ID :
WELL NAME :

SCOPE OF PROJECT
HOLDS:

THIS DRAWING IS BASED ON MASTER DRAWING:


YFL-81-000000-PX-2365-90030-0001 REV-03
AND NOW IT IS THE PART OF PROJECT ID:NOY0000Y0007
WBS No.:XXXXXXXX

This document is issued for the party which commissioned


it and for specific purposes connected with the captioned
project only. It should not be relied upon by any other party Rock International Engineering Consultancy,
Al Nahda Towers 2, Office:601,Ghala
or used for any other purpose. We accept no responsibility secivrS
em
u
elortP
ea
ht id
H
aAl S.A.O.C P.O.Box No. 3968, P.C:111, AL Khuwair,
for the consequences of this document being relied upon Muscat, Sultanate of Oman.
T +968 24504335
by any other party, or being used for any other purpose,
F +968 24117318
or containing any error or omission which is due to an W www.rockoman.com NOY0000Y0007
error or omission in data supplied to us by other parties.

NTS
YIBAL
A1-PDO.DWG (SP-2065)

03 29.08.22 PSN AS BUILT FOR EBV PROJECT NCO000CO1275-AF


FIELD (YIBAL-110) 81
0 AUG.'10 MT AS BUILT FOR PROJECT 'QM' 0.0.YIB.FLO.724 FC 00 ONE/333
P E F S (CONSTRUCTION)
1.-
6"-600# HOOK-UP FOR
MASTER DRAWING REVISION
NOTES REFERENCE DRAWINGS
WATER INJECTION WELL Y-110 YFL 81 000000 PX 2365 90030 0001 01

LAST SAVED BY AHS1468 ON 10/01/2024 4:23 PM PLOTTED BY AHSAN NAWAZ ON 1/10/2024 4:23 PM FILENAME: P:\AL-HADITH\PROJECTS\2024\P20C0124001-AHPS FL REPLACEMENT SCOPE 2024\2. ENGINEERING\2.PROCESS\YIBAL\Y-110\REV-01\WORKING\YFL-81-000000-PX-2365-90030-0001-01.DWG