You are on page 1of 1

REBAR DRAWING

REBAR Scedule No.DN-B01-W03-R Rev C1


Drawing Status:
MESH DETAlL Site Ref: 22-0060
15.02.2023
FOR CONSTRUCTION SIDE ELEVATION
Hallsville Quarter Phase 3 Date Prepared: Date Revised 15.02.2023
Unit No: Quantity: Prepared By: TG Checked By KS

DN-B01-W03-R Bar Mark Type & No. of No.Of Total Shape Length a* b* c* d* e* r* kg/one kg/all
Blackpark Road, Tel: 028 796 50500 DN-B01-W03 1 Size Mbrs Bars In No. Code of each
Toomebridge, Fax: 028 796 59744
Co. Antrim. e-mail: technical@creaghconcrete.com Each Bar #
BT41 3SE http:// www.creaghconcrete.com

Project No: Drawing No: Date:


Revision: Scale: Total: 1 H 10 1 12 12 63 2325 840 150 155 155 20 1.4 17.2
3
22-0060 DN-B01-W03-R 02.02.2023 As Shown C1 2 H 16 1 12 12 13 1725 840 100 840 2.7 32.7
VOLUME OF CONCRETE: 3 H 10 1 4 4 00 2800 2800 1.7 6.9
Layer Volume Mix Strength Cover U.N.O. Mix Type 4 H 10 1 4 4 63 1700 345 275 155 155 20 1.0 4.2
Hallsville Quarter Phase 3 External 0.53 C40/50 25/30mm Aspen 5 H 16 1 2 2 00 2800 2800 4.4 8.8
External C40/50 25/30mm STANDARD GREY 7 H 8 1 8 8 21 825 350 150 350 0.3 2.6
Rev: Notes:
A1 FOR APPROVAL
Date: Drawn By: Checked By: Structural C40/50 25/30mm STANDARD GREY 8 H 8 1 4 4 00 625 625 0.2 1.0
06.02.2023 TG KS
Insulation Insulation TrokInsulation CORRECT INCORRECT
C1 FOR CONSTRUCTION TG
9 H 8 1 4 4 13 750 350 80 350 0.3 1.2
15.02.2023 KS
Total Volume of Concrete: 0.53 m3
10 H 8 1 2 2 21 900 350 235 350 0.4 0.7
FACTORY UNIT QUALITY CHECK: (PC WORKS) Total Weight of Concrete: 1325 kg
11 H 8 1 2 2 00 350 330 0.1 0.3
Total Weight of Insulation: kg WHEN CUTTING MESH KEEP BOTH VERTICAL AND HORIZONTAL BARS
DATE CAST DIMS CHK
AT THE EDGE OF CONCRETE WITH MIN REQ COVER 12 H 8 1 2 2 00 300 290 0.1 0.2
ANCHOR D1 Total Weight of Bricks kg
PRE-POUR
BAR PLACED
ITEMS CHK
(ADDITIONAL BARS MAY BE REQUIRED) 13 H 8 1 2 2 21 825 350 155 350 0.3 0.7
Total Weight of Windows: kg 21 14 H 10 1 3 3 63 2575 840 235 155 155 20 1.6 4.8
COVER POST-POUR
SUPERVISOR SIGNATURE & DATE:
FINAL INSP
Total Weight of Rebar Cage: 100 kg 22 20 7 6 7 MOULD FACE 3 9 6 19
15 H 10 1 1 1 26 2600 2235 165 185 130 1.6 1.6

25
Total Weight of Unit: 1425 kg
16 H 10 1 3 3 26 2575 2230 140 190 90 1.6 4.8
CONCRETE LIFT STRENGTH @ DEMOULDING: 15N/mm²
25 17 H 16 1 1 1 26 2600 2240 170 185 135 4.1 4.1
LEGEND: 18 H 16 1 1 1 26 2575 2235 140 190 95 4.1 4.1
F.F. FILL FACE 24 25 19 H 8 1 3 3 21 675 260 185 260 0.3 0.8
20 H 8 1 2 2 00 2800 2800 1.1 2.2
M.F. MOULD FACE 21 H 8 1 12 12 21 525 180 185 180 0.2 2.5
FF - FILL FACE 22 H 8 1 3 3 63 775 175 100 115 115 16 0.3 0.9
MF - MOULD FACE
23 H 8 1 2 2 00 750 725 0.3 0.6
EF - EACH FACE
LAE - LIGHT ACID ETCH
24 H 8 1 3 3 33 2075 840 65 150 0.8 2.5
6 H 10 1 4 4 99 850 0.5 2.1

25

300
8
9 18
FILL FACE 5 1 10
5
23 13

90
12 16
Concrete Wgt(T ) 0.00 Concrete Vol(m3) 0.00 Rein Wgt (T ) 0.00 Rein Vol (m3) 0.00
SECTION A - A 1:5 14
Total: 107.3
20 This Schedule complies with the requirements of BS 8666 * Specified in multiples of 5mm # Specified in multiples of 25mm

90
18
21

105
16

30
0
2
C D E
H10-6 - 850
521 12 H16 -2-200 329

5 3
35 3 H8 -24 67 12 H10 -1-200 93 3 H10 -14-100 80

1
15 663 56 3 H8 -22 214 12 H8 -21-200 121 3 H8 -19 81
1-H10-6 1-H8-9
1-H16-18- FF 2-H16-5- MF 2-H8-12- 1 EF 6
2 H8 -7-50 2 H8 -7-50 18
2-H8-8- 1 EF
FILL FACE

2 H8 -13-50 1-H10-6 20
MOULD FACE

A A
41
41
2 H8 -20 - MF
2 H8 -23 - FF

12

185
19

17
14

SECTION D - D 1:5

3 H10 -16 - FF
16
1-H8-9
4 H10 -3 - MF

3
25

23
22
20 18

15
25

MOULD FACE
4
8
1-H8-9 1-H10-15- FF

FILL FACE
21
1-H8-9

455
340

B 1-H10-6 B
16 1-H10-6
2-H8-11- 1 EF 11
2 5

1-H16-17 6
2 H8 -7-50 2 H8 -7-50 2-H8-8- 1 EF 2 H8 -10-50 17
C D
4 H10 -4-120 95
SECTION E - E 1:5
1 EXRTERNAL LAYER ELEVATION
663 LOOKING DOWN ON FILL FACE 1:5 E

15
MOULD FACE

FILL FACE

8
10 11
8 5 MOULD FACE 1 9
35

24 25
25

5 17 25

14

SECTION C - C 1:5 4
25

FILL FACE
7 7 17

SECTION B - B 1:5

BM01 BM02 BM03 BM04


ANCHOR
BAR BAR BAR BAR
CCP-WAS-20-187 08 10 08 08

DRAWINGS TABLE:
Drawings
Unit No.
Mould Rebar

DN-B01-W03 DN-B01-W03 DN-B01-W03-R


DETAIL Z1
Tekla Structures

ADDITIONAL REINFORCEMENT AROUND


NOTE: FOR RELATING DRAWINGS TO THIS ELEMENT REFER TO THE DRAWINGS TABLE. ANCHORS
A0 - Manufacturing DR Frame