Professional Documents
Culture Documents
DN-B01-W03-R Bar Mark Type & No. of No.Of Total Shape Length a* b* c* d* e* r* kg/one kg/all
Blackpark Road, Tel: 028 796 50500 DN-B01-W03 1 Size Mbrs Bars In No. Code of each
Toomebridge, Fax: 028 796 59744
Co. Antrim. e-mail: technical@creaghconcrete.com Each Bar #
BT41 3SE http:// www.creaghconcrete.com
25
Total Weight of Unit: 1425 kg
16 H 10 1 3 3 26 2575 2230 140 190 90 1.6 4.8
CONCRETE LIFT STRENGTH @ DEMOULDING: 15N/mm²
25 17 H 16 1 1 1 26 2600 2240 170 185 135 4.1 4.1
LEGEND: 18 H 16 1 1 1 26 2575 2235 140 190 95 4.1 4.1
F.F. FILL FACE 24 25 19 H 8 1 3 3 21 675 260 185 260 0.3 0.8
20 H 8 1 2 2 00 2800 2800 1.1 2.2
M.F. MOULD FACE 21 H 8 1 12 12 21 525 180 185 180 0.2 2.5
FF - FILL FACE 22 H 8 1 3 3 63 775 175 100 115 115 16 0.3 0.9
MF - MOULD FACE
23 H 8 1 2 2 00 750 725 0.3 0.6
EF - EACH FACE
LAE - LIGHT ACID ETCH
24 H 8 1 3 3 33 2075 840 65 150 0.8 2.5
6 H 10 1 4 4 99 850 0.5 2.1
25
300
8
9 18
FILL FACE 5 1 10
5
23 13
90
12 16
Concrete Wgt(T ) 0.00 Concrete Vol(m3) 0.00 Rein Wgt (T ) 0.00 Rein Vol (m3) 0.00
SECTION A - A 1:5 14
Total: 107.3
20 This Schedule complies with the requirements of BS 8666 * Specified in multiples of 5mm # Specified in multiples of 25mm
90
18
21
105
16
30
0
2
C D E
H10-6 - 850
521 12 H16 -2-200 329
5 3
35 3 H8 -24 67 12 H10 -1-200 93 3 H10 -14-100 80
1
15 663 56 3 H8 -22 214 12 H8 -21-200 121 3 H8 -19 81
1-H10-6 1-H8-9
1-H16-18- FF 2-H16-5- MF 2-H8-12- 1 EF 6
2 H8 -7-50 2 H8 -7-50 18
2-H8-8- 1 EF
FILL FACE
2 H8 -13-50 1-H10-6 20
MOULD FACE
A A
41
41
2 H8 -20 - MF
2 H8 -23 - FF
12
185
19
17
14
SECTION D - D 1:5
3 H10 -16 - FF
16
1-H8-9
4 H10 -3 - MF
3
25
23
22
20 18
15
25
MOULD FACE
4
8
1-H8-9 1-H10-15- FF
FILL FACE
21
1-H8-9
455
340
B 1-H10-6 B
16 1-H10-6
2-H8-11- 1 EF 11
2 5
1-H16-17 6
2 H8 -7-50 2 H8 -7-50 2-H8-8- 1 EF 2 H8 -10-50 17
C D
4 H10 -4-120 95
SECTION E - E 1:5
1 EXRTERNAL LAYER ELEVATION
663 LOOKING DOWN ON FILL FACE 1:5 E
15
MOULD FACE
FILL FACE
8
10 11
8 5 MOULD FACE 1 9
35
24 25
25
5 17 25
14
SECTION C - C 1:5 4
25
FILL FACE
7 7 17
SECTION B - B 1:5
DRAWINGS TABLE:
Drawings
Unit No.
Mould Rebar