Professional Documents
Culture Documents
25
Angle
FALSE CEILING
100
100 FALSE CEILING SIGNATURE:
Sealant KBF FOR ECCC
+2250 +2250
CFL CFL
CURTAIN TRACK Wall Tile
100
COPYRIGHT EAST COAST CONSTRUCTION COMPANY PTY.
400
400
6 Thk FC Board
LTD.
SH SH Ledge Wall REPRODUCTION OF THE WHOLE OR PART OF THE
1618
780 DOCUMENT CONSTITUTES AND INFRINGES COPYRIGHT. THE
1050
1025
Wall Tile INFORMATION, IDEAS AND CONCEPTS CONTAINED IN THIS
DOCUMENT ARE CONFIDENTIAL. THE RECIPIENT(S) OF THIS
ACCESS PANEL DOCUMENT ARE PROHIBITED FROM DISCLOSING SUCH
6 Thk FC Board
900
SS INFORMATION IDEAS AND CONCEPTS TO ANY PERSON
BEHIND Nogging Track WITHOUT PRIOR WRITTEN CONSENT OF THE COPYRIGHT
Stud Wall HOLDER. ECCC HOLDS A LICENSE FROM ARBT IN RESPECT
600
600
OF PROPRITARY ITEMS
TL 2
LEDGE WALL 1876 TL 2 TL 3 TL 3 75x75 75x75
NOTE THIS DRAWING IS PREPARED BY EAST COAST
CONSTRUCTION COMPANY UNDER ITS QBCC LICENCE
TOP FINISH Flashing Angle Flashing Angle
SS FOR THE USE OF EAST COAST CONSTRUCTION COMPANY
50
TL 3 PTY LTD AS THE CONTRACTOR ON THIS PROJECT
Starken Panel
TL 2
150
150
2200
2200
200
200
SUB- CONTRACTORS TO CHECK AND VERIFY ALL LEVELS,
2030
MX DATUMS & DIMENSIONS ON SITE AND SHALL REPORT ANY
DISCREPANCIES OR OMISSIONS TO THIS OFFICE PRIOR TO
MX
1800
1800
START OF WORK & DURING THE CONSTRUCTION PHASE.
600
626 500 393 393
1800
MX THE DRAWING ARE TO BE READ IN CONJUNCTION WITH
450
1800
OTHER CONSULTANTS DOCUMENTATION AS MAY BE
TL 2
Scale - 1 : 20 APPLICABLE TO THE PROJECT PRIOR TO STARTING &
DURATION OF THE WORKS.
VB
1200
1200
75x75
1200
1050
1000
1000
25
HOB WALL DETAIL
TO REFER
SHEET No.: FAB 211
Sealant
600
600
585
PH WC
TL 1
SET OUT HEIGHT ACCESS PANEL SET OUT HEIGHT TL 1 MX
BASED ON TL 1
BASED ON
LONGEST VALLEY LONGEST VALLEY 6 Thk
+50.0 SLOPE 1:90 SLOPE 1:70 +50.0 SLOPE 1:70
FFL FFL FC Board
F 13-06-20 DS BB SLOPE RATIO REVISED
50
50
750 1126
2676
20
5780 150
1602
1452 Ledge Wall
E 06-02-20 JN BB LEDGE WALL - REVISED
1200
1175
D 19-12-19 JN BB SHOWER CUBICLE REVISED
REFER DETAIL A REFER DETAIL A
ELEVATION - E1 ELEVATION - E2 Wall Tile Wall Tile C 11-10-19 JN BB MIRROR CABINET REVISED
100
REV DATE DRN CHK DESCRIPTION
75x75 25 75x75
Flashing Angle
100
+2250 +2250 Flashing Angle CLIENT:
50
CFL CFL
MIRROR CABINET
ASIA PACIFIC
400
400
400
Starken Panel
780 TO DETAIL
900
Motor bed Main drainage flow
600
600
TL 2
Floor tiles Path of moisture
through grout and
904 LEDGE WALL mortar EAST COAST CONSTRUCTION COMPANY PTY LTD
77 880
E-mail: admin@ecccgroup.com.au
TOP FINISH Telephone: +61 (448)904475
TL 3
DETAIL AND DRAFTING:
2200
2200
D-02 MX
Grout
1635
TL 2
FACADE
200
VB Waterproof
1800
Drainage flange
600
600
membrane
1800
130
DETAIL - A (PADDLE FLANGE) Bradman Technologies Private Limited
1200
1200
1050
31/22,Victoria Cresent Rd.Egmore,Chennai - 8,India
HOB WALL Scale - 1 : 10 600
TEL: +91 44 42043347 Email: info@bradmanit.com
TO DETAIL
PROJECT:
720
TL 1
600
600
SET OUT HEIGHT 971 SET OUT HEIGHT PROPOSED RESIDENTIAL AT PLOT-50&
300 54,CARL STREET,
BASED ON TL 1 BASED ON
LONGEST VALLEY WOOLOONGABBA,QLD,AUSTRALIA
LONGEST VALLEY
165
600
200
300
FFL FFL ACCESS PANEL
ACCESS PANEL DRAWING TITLE:
50
300 x 300MM
50
6/18/2020 12:04:28 PM
ELEVATION - E3 ELEVATION - E4 (TYPE 05)
NOTE: CODE DESCRIPTION DRAWN: CHECKED:
Scale - 1 : 25 Scale - 1 : 25 MX MIXER TAP
CARL_FINISH LEGEND JN BB
PH PAPER HOLDER
FIRST ISSUE: SCALE:
CODE DESCRIPTION SH SHOWER HEAD
Waterproofing As Per - AS3740 03-10-2019 As indicated @ A3
TL 1 150 X 150mm (FLOOR TILE) SS SHOWER SCREEN FIXING AT SITE PROJECT NO DRAWING NO REVISION
TL 2 300 X 600mm (WALL TILE) VB VANITY BASIN
TL 3 LEDGE WALL TOP FINISH (TO BE CONFIRM) WC WATER CLOSET 1802 A 424-1 F