Professional Documents
Culture Documents
TO KONTROL TO LOAD
MESIN DEHOME RIO+10-5-001
MCB 10A 3P
MCB 4A 1P TO LOAD
RIO+10-2-001
SPARE MCB 6A 2P
INCOMING FROM INCOMING FROM
PERFORM TRANSFER OUTPUT UPS GE
MCB 4A 1P TO LOAD
RIO+10-3-001
SPARE MCB 6A 2P
MCB 50A 3P
TO LOAD
RIO+10-5-001
EXECUTOR :
COS MCB 6A 2P
50A 4P
TO LOAD
RIO+10-1-001
INCOMING FROM
OUTPUT UPS GE MCB 25A 3P MCB 6A 2P
DRAWING TITLE:
TO LOAD
SINGLE LINE DIAGRAM
RIO+10-2-001 NEW PANEL DISTRIBUSI
MCB 6A 2P
INCOMING FROM Approved By:
PLN
TO LOAD
Checked By:
RIO+10-3-001
MCB 6A 2P Checked By:
Checked By:
TO LOAD
RIO+10-4-001 Drawn By:
Dwg. Dwg.
Scale:
Code: No: